High-grade gold-antimony rock samples expand Amoco target
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
4 JUNE 2025
Amoco Project - Priority target expands with high-grade
gold-antimony rock samples
-
Field mapping at the Amoco Antimony-Gold Project has identified mineralisation with gold
grades up to 15.1 g/t Au, antimony grades up to 0.7% Sb and silver grades up to 53.2 g/t Ag,
expanding the priority target area.
-
The newly discovered gold, antimony and silver mineralisation of the Amoco target exhibits
mineral zonation. The nearby Larvotto Resources (ASX:LRV) Hillgrove Antimony-Gold Project
also exhibits metal zonation at depth.
-
The Amoco Project is located ~19km southeast of the Hillgrove Antimony-Gold Project and
~14km east of the structural corridor hosting Koonenberry Gold’s (ASX: KNB) Enmore Gold
Project.
-
Applications for the maiden drill programs at Amoco and Mayview Projects are progressing
with the NSW Resources Regulator alongside active discussions with landowners for access
agreements.
-
The Company is finalising plans for a targeted soil sampling program, and a high-resolution
magnetic geophysics survey is crucial in enhancing confidence in the definition of drill targets.
Critical Resources Limited (‘Critical Resources’ or the ‘Company’, ASX:CRR) is pleased to report to
shareholders assay results from rock chip sampling at the Amoco gold-antimony Project (Amoco) (EL9293),
within the highly prospective New England Fold Belt, Armidale region, NSW - Australia.
Critical Resources’ Chief Executive Officer, Mr. Tim Wither, commented ‘The highly encouraging field work has
validated the legacy data of Amoco and strengthens our geological models for the priority target area. The
discovery of high-grade gold-silver mineralisation ~350m away from the known legacy mineralisation
highlights the fertility of the Amoco target area and provides confidence in our next steps.
‘The Company has been actively integrating and compiling legacy data to support the design and planning
of the upcoming exploration programs. While drill permits are progressing, the Company is completing plans
for detailed soil mapping programs along with a high-resolution magnetic geophysics and LIDAR survey to
assist in drill targeting focused on the priority Amoco and Mayview gold-antimony targets.’
Amoco Antimony-Gold Project
During May 2025, the Company completed initial field mapping and sampling at Amoco along the
mineralised trend identified through legacy rock and soil sampling. Field mapping and rock sample assays
confirmed mineralisation over a ~1 km east-west length and, importantly, identified a new zone of
mineralisation approximately 350 m south of the legacy mineralisation trend (Figure 1).
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
During the field mapping, fifteen (15) rock chip samples were collected. Encouragingly, all samples returned
anomalous gold results greater than 0.8 g/t Au and up to 15.1 g/t Au. Seven samples returned assay results
exceeding 0.1% Sb (up to 0.7% Sb) in the northern zone, and all six samples in the southern zone returned silver
greater than 28 g/t Ag (Appendix A. Table 1). These newly collected rock samples strongly correlate with
legacy results reporting gold mineralisation up to 17.9 g/t Au, antimony up to 0.53% Sb, and silver up to 80 g/t
Ag (ASX:CRR announcement 8 November 2024).
Of geological importance is the identification of elevated silver (up to 53.2 g/t Ag) and lead (up to 0.49% Pb)
in the newly identified area (Figure 1), which indicates a zonation of the mineralised fluids along the structures,
a strong characteristic of antimony-gold systems (ASX:CRR announcement 8 November 2024).
Figure 1 - Location Plan of recent (circles) and legacy rock chip (squares) samples with interpreted major/minor structures
from aeromagnetic survey (black dashed).
The Amoco gold-antimony mineralisation is located in the fertile New England fold belt ~19km southeast of
Larvotto Resources Limited’s (ASX:LRV) Hillgrove Antimony-Gold operations and ~14km east of Koonenberry
Gold’s (ASX:KNB) Enmore Gold Project along regional controlling structural trends (Figure 2).
Recent re-interpretation of aeromagnetic survey (ASX:CRR announcement 20 March 2025) has outlined a
network of major fault structures. Modelling of the legacy and recent assay data supports the geological
interpretation of mineralised NE/SW structures (Figures 1 and 2), which are interpreted as key conduits for
hydrothermal activity, analogous to the nearby Hillgrove operations and gold mineralisation at the
Koonenberry Gold’s Enmore Gold Project.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The controlling structures within this gold-antimony rich portion of the New England Fold Belt typically occur
along multiple, closely spaced faults that extend horizontally for hundreds of metres and vertically for up to
several kilometres, underscoring the potential scale and economic value of the Amoco project's
mineralisation zone. The revised geological model reflects an improved understanding and warrants further
field work prior to drill testing.
Figure 2 - Location Plan of Critical Resources - Halls Peak tenure and regionally significant Hillgrove and Enmore with
regional structures.
Next Steps
•
The Company is continuing to progress the Amoco and Mayview projects, Assessable Prospecting
Operation (APO) applications with the New South Wales (NSW) Resources Regulator, and advance land
access agreements (LAA) with the respective landowners for the maiden drill programs.
•
Planning and commencement of multi-element soil mapping program to define priority drill target areas.
•
Planning and commencement of high-resolution Magnetic geophysics and LIDAR survey, to aid in
modelling of structures to ensure effective drill targeting.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
This announcement has been approved for release by the Board of Directors of Critical Resources.
For further information, please visit www.criticalresources.com or contact:
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Appendix A
Table 1 – Amoco rock chip sample assay results
ID
East
North
Au ppm (g/t)
Ag ppm (g/t)
Sb %
Pb ppm (g/t)
AGR1
409710
6598196
15.1
8.8
0.6%
167
AGR2
409712
6598195
13.0
5.9
0.5%
125.5
AGR3
409713
6598196
1.3
0.8
0.1%
30.6
AGR4
409715
6598197
11.9
4.6
0.4%
294
AGR5
409715
6598198
0.8
0.4
0.0%
19
AGR6
409712
6598197
4.7
5.3
0.2%
40.7
AGR7
409713
6598195
4.3
1.5
0.2%
94.8
AGR8
409710
6598197
15.0
9.8
0.7%
622
AGR9A
409379
6597922
0.9
39.5
0.1%
3,420
AGR9B
409377
6597921
1.5
42.8
0.1%
4,940
AGR9C
409380
6597922
1.7
53.2
0.1%
1,445
AGR9D
409382
6597921
1.0
38.0
0.1%
2,930
AGR10A
409386
6597936
1.3
40.1
0.1%
1,800
AGR10B
409388
6597937
1.6
28.0
0.1%
914
AGR10C
409389
6597939
2.5
35.6
0.2%
1,360
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is an Australian mining company focused on the exploration and development of metals needed for
a sustainable future. The Company holds the Mavis Lake Lithium Project, located in Ontario, Canada, with drilling
exceeding 45,000 meters. This has defined a maiden inferred resource of 8 million tonnes at 1.07% Li2O, with significant
potential to expand this resource and identify new discoveries within the surrounding area.
The Company’s Hall Peak Base Metals Project is located ~87km south-east of Armidale, New South Wales, Australia. The
Company has defined a maiden Inferred Mineral Resource of 884,000t @ 3.7% Zn, 1.5% Pb, 0.4% Cu, 30g/t Ag and 0.1g/t
Au. The Hall Peak ~950 km2 exploration tenure includes two advanced antinomy-gold prospects – Mayview and Amoco.
Figure 3 - Project Location map showing Halls Peak project area proximity to significant Antimony-Gold projects in the
Armidale region, NSW, Australia.
Halls Peak – Gibson Base Metals Project - Mineral Resource Estimate
Halls Peak Project
JORC Classification
Indicated
Inferred
Total*
Zn Cut-Off
grade (%)
2.0
-
Tonnage
(Mt)
0.84
0.84
Zn (%)
Pb (%)
Cu (%)
3.7
3.7
1.5
1.5
0.44
0.44
Ag ppm
(g/t)
30
30
Au ppm
(g/t)
0.1
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated block model, with blocks
dipping 55>330o. Classification is according to the JORC Code Mineral Resource categories. Refer to the ASX:CRR announcement 30 June 2024.
Mavis Lake Lithium Project - Mineral Resource Estimate
Mavis Lake -Lithium Project
JORC Classification
Inferred
Total*
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
0.3
8.0
8.0
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting. Classification is
according to the JORC Code Mineral Resource categories. Refer to ASX:CRR announcement 5 May 2023.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
COMPETENT PERSON STATEMENT
The information in this ASX Announcement that relates to Exploration Results is based on information compiled by Mr
Michael Leu, a Competent Person who is a member of the Australian Institute of Geoscientists (AIG) and the Australian
Institute of Mining and Metallurgy (AusIMM) and a consultant of Critical Resources. Mr Leu has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Leu consents to the inclusion in this Announcement of the matters based on his
information in the form and context in which it appears.
PREVIOUSLY REPORTED INFORMATION
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project, which is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012 JORC
Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and have not
materially changed.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from the
ASX market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available
for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and technical
parameters underpinning the estimates in the original market announcement continue to apply and have not materially
changed.
This announcement contains information on the Halls Peak Project extracted from ASX market announcements dated 22
November 2021, 30 June 2023, 28 August 2024, 12 September 2024 and 3 October 2024, 8 November 2024, 19 November
2024 4 December 2024, 16 December 2024, 12 February 2025 and 20 March 2025 reported in accordance with the 2012
JORC Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not aware of
any new information or data that materially affects the information included in any original ASX market announcement.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward-looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward-looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projections based on
new information, future events or otherwise, except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc.). These examples should
not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
Method of recording and assessing core
and chip sample recoveries and results is
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
•
Drilling
techniques
Drill sample
recovery
Logging
Sub-sampling
techniques
and sample
preparation
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
•
•
•
Fifteen rock samples reported in this release comprised rock chip
samples that were collected with a geological hammer from
large (46 cm x 24 cm) blocks and smaller loose samples
excavated from regolith. These were collected at the discretion
of the field geologist. Rocks were sampled selectively to ensure a
high-level of representivity of various rock, alteration and veining
types observed at each site. This style of sampling enables
preliminary/indicative metal grade and rock elemental
compositions to be ascertained, however, it is not as
representative as continuous chip channel sampling or drilling.
Rock samples were collected into labelled calico bags
Sampled dispatched to ALS Minerals (Brisbane).
Historical Data comprising soil and rock chip samples, detailed in
Criterion: Quality of assay data and laboratory tests listed in
Exploration done by other parties
•
Not applicable, no drilling undertaken or reported
•
Not applicable, no drilling undertaken or reported
•
Not applicable, no drilling undertaken or reported
•
Not applicable, no drilling undertaken or reported
•
All rock chip samples collected were qualitatively logged and
described by a qualified geologist. Photographic records were
made in the field and later of cleaned samples prior to dispatch
to ALS laboratories
Not applicable, no drilling undertaken or reported
Not applicable, no drilling undertaken or reported
•
•
•
•
•
•
Not applicable, no new drilling results reported.
Samples collected were representative of the material identified
during fieldwork
The available data suggests that sampling procedures provide
sufficiently representative sub-samples for the current
interpretation
Sample sizes are appropriate to the grain size of the material
being sampled.
ASX:CRR
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and assaying
Location of
data points
Data
spacing and
distribution
JORC Code explanation
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis include instrument make and
model, reading times, calibration factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, and
data storage (physical and electronic)
protocols.
Discuss any adjustments to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Commentary
•
•
•
•
•
•
•
Results reported in ALS Certificate of Analyses BR25138078
Historical Data comprising soil and rock chip samples, detailed in
Criterion: Quality of assay data and laboratory tests, listed in
Exploration done by other parties
•
No verification sampling and assaying have been captured to
date for the fifteen samples reported herein
Historical reports indicate that soil and rock samples were
appropriately collected by a qualified geologist
No drilling undertaken or reported No adjustments to data
•
•
•
All samples have been located by a handheld Garmin GPS 60x,
where the grid datum is GDA94 Zone 56J
•
The decision on the spatial distribution and distance of sampling
was determined solely by the distribution of discovered
mineralisation in the field.
No continuity of grade is implied
No sample compositing has been implied
The data spacing and distribution were not intended and are not
sufficient to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
The work completed was appropriate for the current early
exploration stage.
The work completed was appropriate for the current early
exploration stage.
•
•
•
•
•
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
All samples reported herein were collected by qualified geologists
and the nature, quality and appropriateness of the assaying and
laboratory procedures used are detailed below.
All samples reported herein were collected by a qualified
geologist, and the nature, quality and appropriateness of the
assaying and laboratory procedures used are detailed below.
All samples were dispatched to ALS Laboratories Zillmere,
Queensland.
All samples - Preparation: PUL-31 Pulverize up to 250g 85% <75 um
All samples - Analytical Method: Au-AA25, 48 elements by MEMS61
•
•
No sample orientation was undertaken
No drilling undertaken or reported.
ASX:CRR
Criteria
JORC Code explanation
Commentary
Sample
security
The measures taken to ensure sample
security.
•
Samples were in continual custody of professional Company
representatives until final delivery by secure express parcel post to
the laboratory, where all samples will be held in a secure setting
until processing
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
•
No audit has been undertaken at this early stage of exploration
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location
and ownership, including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting, along with any known
impediments to obtaining a licence to
operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
•
CRR holds five granted Exploration Licences (EL4474, EL7679,
EL9428, EL9429, EL9430), northeast of Armidale N.S.W., that
encompass at total of 946km2. CRR has also agreed to acquire
100% of EL9293 from Golden Plateau Pty. Ltd.
•
All tenements are granted.
Exploration
done by
other parties
All historical exploration records are publicly available via the
Geological Survey of New South Wales DIGS website.
Key sources of exploration data generated by other parties include:
Open File, DIGS Records, Geological Survey of New South Wales
Report: GS1983/357(R00009703-9704) Two exploration reports, EL1427
& 1742, Halls Peak area. Gardiner, G. for Amoco Minerals Australia
Co.
Gardiner, G., 1983. Final Report, Halls Peak, Exploration Licenses 1427
and 1742, New South Wales, Amoco Minerals Australia Co.,
GS1983/360 R00014317.
Sample AG(1)3000N 7393.5E, ASX Certificate of Analyses ST37207 –
2003; Coordinate 3000N 7393.5E based on Amoco’s grid. Sample
collected by M. Leu and reported in Leu, M. R., 2003. Annual Report
for Exploration Licence Nos 4474 (N. N. Dennis) and 5339 (Wildesign
Pty. Ltd.) for the period 13th January 2002 to 12th January 2003. Open
File, DIGS Records, Geological Survey of New South Wales Report:
Tenth_annual_exploration_report, EL_4474_R00047867. Gold assayed
by method Au-AA25; other multielement by method ME-ICP41.
Sample S671. Collected by M. Leu in the creek around coordinate
3000N 7700- 7600E based on Amoco’s grid. Results reported in ASX
Certificate of Analyses BR12233601 – finalised 25 10 2012.
Refer to Larvotto Resources (ASX:LRV) ASX Announcement 5 August
2024. Measured Resource 448kt @ 3.8% Sb; Indicated Resource
3,980kt @ 1.3% Sb and Inferred Resource 2,835kt @ 0.9% Sb.
Open File, DIGS Records, Geological Survey of New South Wales
Report: English, P.W., 1979. Halls Peak P.L.s 345 & 353 N.S.W. Six
Monthly Report to the Mines Department, July 1978 to January 1979,
CRA Exploration Limited, GS1979/142.
Leu, M. R., 1998. Annual Reports EL 4474, Halls Peak Area, Armidale
Mining District for the period 13th January 1996 to 12th January 1998.
Holder EL 4474 – N. N. Dennis. Open File, DIGS Records, Geological
Survey of New South Wales Report: 1996-1998
Combined_fourth_and_fifth_annual_explora_R00020818.
Open File, DIGS Records, Geological Survey of New Soutth Wales
Report: Kennewell, P. J., P.R. Degeling and Gentle, L.V., 2013. Annual
Report for Exploration Licences 4474 and 5339, Halls Peak Project for
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Criteria
JORC Code explanation
Commentary
Reporting Period 13 January 2012 to 12 January 2013. Open File, DIGS
Records, Geological Survey of New South Wales Report:
Twentieth_Annual_Exploration_Report_on_E_RE0004361
.Refer to Precious Metal Resources ASX Announcement Significant
Gold Anomalies Suggest Potential for Hillgrove Style Gold/Antimony
Deposits, 23rd October 2012
Sample AA, ASX Certificate of Analyses BR10096079 – finalised 10 08
2010. Sample collected by M. Leu, coordinates 6598185mN 56J, 40973
mE 56J, and reported in - Leu, M. R., 2011. Annual Report for
Exploration Licences 4474 and 5339 for period 13th January 2010 to
12th January 2011. Holder PMR1 Pty. Ltd. Open File, DIGS records,
Geological Survey of New Soutth Wales Report:
Eighteenth_Annual_Exploration_Report_on_RE0002327
Sample 52863: Collected by Amoco Minerals Australia, Coordinate
3025N 7675E based on Amoco’s grid. DIGS Records Geological
Survey of New Soutth Wales Report: GS1983/357. Leu, M. R., 2003.
Annual Report for Exploration Licence Nos 4474 (N. N. Dennis) and
5339 (Wildesign Pty. Ltd.) for period 13th January 2002 to 12th January
2003. Open File, DIGS records, Geological Survey of New Soutth Wales
Report: Tenth_annual_exploration_report,_EL_4474_R00047867.
Sample C1S10, ASX Certificate of Analyses BR0400463 – 2004;
Coordinate 3000N 7700-7600E based on Amoco’s grid. Sample
collected by M. Leu and reported in - Leu, M. R., 2004. Annual Report
for Exploration Licence Nos 4474 (N. N. Dennis) and 5339 (Wildesign
Pty. Ltd.) for period 13th January 2003 to 12th January 2004. Open File,
DIGS Records, Geological Survey of New South Wales Report:
Eleventh_Annual_exploration_report, EL_4474_and_5_R00051516.Gold
assayed by method Au-AA25; antimony and other multielements by
method ME-ICP41s.
Sample HG8B. Contains sericitic alteration with geothite within
veining. Sample is highly leached by still contained 0.11ppm Au,
308ppm Sb, 1,040 ppm Cu (ALS Certificate of Analyses BR15065053,
2015). Sample collected by M. Leu and reported in - Leu, M. R.,
Rebek, J., Kennewell, P., Degeling, P. R., Wang, Y. Robertson, R. A.,
2016. Annual Report for Exploration Licences 4474 and 5339, Halls
Peak Project, Reporting Period13th January 2015 to 12th January
2016. DIGS Records Geological Survey of New South Wales Report:
Twenty-third_Annual_Exploration_Report_on_RE0008131. Gold
assayed by method Au-AA25; antimony and other multielements by
method ME-MS61.
Sample RC1, 1.03ppm Au, 15.8ppm Ag, 201ppm Sb, 1,435ppm As,
2,560ppm Pb, 462ppm Cu, and 198ppm Zn. Sample collected at
GDA94 coordinates 56J 407280 mE 6598088 mN. Results reported in
ALS Certificate of Analyses BR22220725, 3 9 2022. Gold assayed by
method Au-AA25; antimony and other multielements by method MEMS61.
Groves, D. I., Goldfarb, R. J., Gebre-Mariam, M., Hagemann, S. G.,
Robert, F.,1998. Orogenic gold deposits: A proposed classification in
the context of their crustal distribution and relationship to other gold
deposit types. Ore Geology Reviews, 13, 7 – 27.
Petrographic Reports
Ashley, P.M. 2024. Petrographic Report on Nine Rock Samples from
the Barraba Area, Northern NSW, and North and Central Queensland,
August 2024
England, R.N., 2003, Petrographic Notes for 9 Samples from the Hall’s
Peak Area, Southern New England Fold
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Criteria
JORC Code explanation
Commentary
Belt
England, R.N., 2004, Petrographic Notes for 17 Samples from the Hall’s
Peak Area.
DIGS Records, Geological Survey of New South Wales Open File
Reports specifically detailing knowledge on the Amoco Grid
Hillgrove-style Orogenic Gold-Antimony System and the CRA-BHP
drilling:
Leu, M. R., 1998. Annual Reports EL 4474, Halls Peak Area, Armidale
Mining Di
Share your feedback
Discover