Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 January 2025
December 2024
Quarterly Activities Report
Highlights
High-grade antimony and gold assay results in rock chip samples from the Mayview
Homestead Prospect within the Halls Peak Project, including:
- 52.3% Sb - Sample MVS17
- 38.3% Sb - Sample MVS8
- 31.8% Sb - Sample MVS14
- 29.7% Sb– Sample MVS6
- 20.8% Sb– Sample MVS15
- 15.35% Sb and 2.71 g/t Au – Sample MVS11
- 12.45% Sb and 2.18 g/t Au – Sample MVS18
- 11.2% Sb and 1.13 g/t Au – Sample MVS19
•
Potential Hillgrove-Style System: The Hillgrove South property, which is part of the broader 981
km2 Halls Peak Project, is contiguous to the southern and southeastern boundaries of Larvotto
Resources Ltd’s (“LRV”) Hillgrove Antimony-Gold Project. The Mayview Antimony Prospect
located just ~2.7km east and contiguous to LRV’s Hillgrove Antimony-Gold Project, reported
to be Australia’s largest antimony-gold project, Mayview is emerging as a potential Hillgrovestyle orogenic antimony-gold system with significant exploration upside.
•
Desktop study incorporating historical exploration work within the greater Halls Peak Project
identifies exceptionally high-grade silver intercepts from previous drilling including 3,780 grams
per tonne silver, over 1.15m downhole in drill hole DDHA6. More than 130 drill core samples
have returned silver assays greater than 100 grams per tonne Ag and 10 samples exceed 940
grams per tonne silver.
•
Historical drilling also highlighted the presence of high-grade silver in black shales indicating
the potential to discover black shale-hosted silver mineralisation at Halls Peak.
•
CRR agrees to acquire 100% interest in the Amoco Antimony-Gold Project (EL9293), located
adjacent to the Company’s existing Hillgrove South (Mayview Antimony-Gold prospect) and
Halls Peak Projects, and 17km southeast of Larvotto Resources’(ASX: LRV) Hillgrove AntimonyGold operations.
•
Further drilling success at Mavis Lake Main Zone and Tot Pegmatite intersect high-grade
spodumene-bearing pegmatite beyond current resource shapes. Main Zone results include
(MF24-248):
34.90m @ 1.02% Li2O from 131.55m, including:
o 27.40m @ 1.24% Li₂O
o 12.45m @ 1.90% Li₂O
- 7.45m @ 1.54% Li₂O from ~80m, including:
o 4.0m @ 2.50% Li₂O
New Tot Pegmatite drill results within precinct’s Northern Prospects confirm presence of a
stacked mineralised system. Significant results include:
-
•
21.2m @ 1.14% Li₂O from 284m
o 10.0m @ 1.56% Li₂O
o 4.4m @ 1.41% Li₂O
Eligibility confirmed for Ontario Junior Exploration Program (OJEP) 2024-25 funding round.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
Overview
Critical minerals exploration and project developer Critical Resources Limited (ASX:CRR) (“Critical
Resources” or “the Company”) is pleased to report on its activities for the quarter ended 31
December 2024 (“the Quarter”). During the period, the Company focused on the highly
prospective Hillgrove South, and Mayview, Halls Peak Project, located adjacent to Australia’s
reported largest antimony deposit – the Larvotto Resources (ASX “LRV”) Hillgrove Antimony-Gold
Project, near Armidale in New South Wales, as well as development of asset in Ontario Canada,
the Mavis Lake Lithium Project (“Mavis Lake”).
The Company remains committed to advancing exploration efforts across its highly prospective
tenement portfolio, seek to unlock value from critical mineral resources essential for a sustainable
future.
Operational Activities
Halls Peak Project – New South Wales, Australia
Exploration
During the Quarter CRR announced high-grade assay results from its recent sampling program at
the Mayview Homestead Prospect, part of the Halls Peak Project. The results confirm the presence
of antimony and gold mineralisation, emphasizing the potential of this prospect to host a Hillgrovestyle orogenic antimony-gold system.
Mayview is strategically located in the highly prospective New England Fold Belt, notable for
hosting Larvotto Resources Ltd’s Hillgrove Antimony-Gold Project, reported as Australia’s largest
antimony-gold system. CRR’s Mayview Prospect is contiguous to the southern and southeastern
boundaries and is situated approximately 2.7 km east of Hillgrove s.
The Company’s latest rock chip assay results confirm high-grade antimony and gold mineralisation
in multiple samples including up to 52.3% Sb in sample MVS17 and 2.71g/t Au in sample MVS11.
The strong grades recorded reinforce the potential for Mayview to host substantial mineralisation,
similar to the Hillgrove Project.
Historical data from the Geological Survey of New South Wales highlights significant stibnite (Sb₂S₃)
occurrences within fault or shear zones at Mayview, with early assays recording up to 1.55% Sb and
0.13 ppm Au. Recent fieldwork by Critical Resources focused on sampling old workings and waste
piles left by 19th-century miners, uncovering previously overlooked mineralisation. These samples
revealed a system of multi-phase quartz and antimony veins, with visual evidence of oxidized
stibnite (Sb₂S₃) and antimony trioxide (Sb₂O₃) in silicified pelite.
Page 2 of 14
Sample
Easting GDA94 56J
Northing GDA94 56J
Elev. (m)
Sb (%)
Sb (ppm)
Au (ppm)
Ag (ppm)
MVS2
400987
6614278
992
0.0132
132
0.35
0.03
MVS4
400967
6614270
982
0.328
3280
2.65
0.02
MVS5
400980
6614279
992
19.45
>10000
0.1
0.36
MVS6
400980
6614279
992
29.7
>10000
0.35
0.21
MVS7
400980
6614279
992
0.942
9420
0.03
0.06
MVS8
400980
6614277
992
38.3
>10000
0.31
0.74
MVS9
401013
6614191
989
8.8
>10000
0.29
0.29
MVS10
400810
6614320
995
0.797
7970
0.19
0.18
MVS10A
400922
6614238
987
0.0716
716
<0.01
0.03
MVS11
400905
6614288
983
15.35
>10000
2.71
0.77
MVS12
400889
6614309
982
7.36
>10000
0.71
0.44
MVS13
400883
6614303
983
0.737
7370
1.86
0.21
MVS14
400905
6614288
985
31.8
>10000
0.84
0.99
MVS15
400905
6614288
985
20.8
>10000
0.29
0.96
MVS16
400905
6614288
985
27.5
>10000
0.87
0.65
MVS17
400905
6614288
985
52.3
>10000
0.08
0.47
MVS18
400905
6614288
985
12.45
>10000
2.18
0.41
MVS19
400905
6614288
985
11.2
>10000
1.13
0.4
MVS20
400905
6614288
985
30.1
>10000
0.26
Table 1: Grab sample assay results at the Mayview Homestead Antinomy Prospect (ALS Certificate
of Analyses BR24336754, 10-12-2024).
Figure 1: Halls Peak Project Area including the Mayview Homestead showing located proximal to
Hillgrove Mine.
Page 3 of 14
0.32
Figure 2: Sample locations at Mayview Homestead Prospect. Located proximal to Larvotto
Resources’ Hillgrove Mine Property and 2.7km from the mine site.
Figure 3: Project Location map showing proximity to significant Antimony-Gold projects in the region.
In December 2024, CRR provided an update of the Company’s Mayview field work program results
and recent studies on the exceptionally high-grade silver values discovered during a geological
review on previous drilling campaigns at the Gibsons Project, within CRR’s 100% owned broader
Halls Peak Project.
Page 4 of 14
A desktop study incorporating historical exploration work within the greater Halls Peak Project has
identified exceptionally high-grade silver intercepted in previous drilling including 3,780 grams per
tonne, over 1.15m downhole in drill hole DDHA6.
More than 130 drill core samples returned silver assays greater than 100 g/t. Of these, 10 samples
exceed 940 g/t (30 ounces per tonne) silver including:
- 3,780 g/t (121.5 ounces per tonne) silver over 1.15m downhole in drill hole DDHA6
- 1,900 g/t (61.1 ounces per tonne) silver over 1.38m downhole in drill hole PMR027
- 1,750 g/t (56.3 ounces per tonne) silver over 1.6m downhole in drill hole PMR027
Hole ID
From (m) Interval (m) Silver Assay (g/t) Silver Ounces
CRR21DD_04
150.6
1.38
>1,500
>48.2
DDHA6
17.37
1.15
3,780
121.5
PMR027
62.5
1.6
1,900
61.1
CRR21DD_01
102.6
1.24
1,750
56.3
SG03
14.15
0.85
1,180
37.9
CRR21DD_04
77.65
0.45
1,165
37.5
SG03
9.9
0.85
1,150
37.0
SG03
12.88
1.27
1,145
36.8
CRRDD_14
261.5
2
1,085
34.9
CRR21DD_01
10.75
0.85
945
30.4
Table 2: Significant Silver values from Halls Peak drill campaigns. CRR21DD_04 was an overlimit
and was not retested.
Additionally, a comprehensive review of available exploration data reaffired the prospectivity of
the Halls Peak project and its potential to host a Hillgrove-style gold-antimony system. The review
highlighted key results that further strengthen the potential of the Halls Peak project. Notably,
previous drilling has returned significant antimony intercepts, including 20,400 ppm Sb over 1.15
meters in Hole DDHA6. Open File Records, Mineral Deposit Data Sheets, of the Geological Survey
of New South Wales indicate multiple Antimony showings within the Halls Peak Project including
the Mayview Homestead Stibnite prospect, situated ~2.7km east of Larvotto Resources Ltd’s
(“LRV”) Hillgrove Antimony-Gold Project. In addition, elevated antimony values were confirmed in
surface rock chip samples, with grades up to 1,330 ppm Sb. Stream sediment samples collected
just 3 km south of LRV’s Hillgrove Gold-Antimony area further reinforce this prospectivity, with Sb
concentrations reaching up to 1,520 ppm as shown in the plan map located in Figure 1. The
geological setting of Halls Peak mirrors that of the LRV Hillgrove deposit, featuring similar faultcontrolled mineralisation systems. These structural complexities and similarities in geology suggest
strong potential for an extensive and high-grade antimony system
Previous drilling conducted by Critical Resources and from previous owners intersected elevated
antimony assays within the Gibson Prospect area within the Halls Peak Project. While drilling was
primarily focused on intersecting the known base metals, 2 holes, DDHA6 and CRR21DD_01,
intersected significant Sb values within faulted arsenopyrite bearing fault structures, as shown in
Table 1, which provides evidence of the Halls Peak project area being part of a larger GoldAntimony system.
Page 5 of 14
Hole ID
From (m)
To (m)
DDHA6
Including
17.37
17.37
21.03
18.52
Down Hole
Interval (m)
3.66
1.15
CRR21DD_01
102.6
103.84
1.24
Sb (ppm)
7780.8
20400
>10000
Table 1: Significant Sb values from Halls Peak drill campaigns. CRR21DD_01 was an overlimit and
was not retested.1,2
A total of 11 drill holes containing 47 samples contains antimony values of 500 ppm or greater,
while over 600 samples did not test for antimony within the base metals mineralised zones. This
presents an opportunity for crucial data review and the possibility to resample possible significant
intervals for antimony.
Acquisition of the Amoco Antimony-Gold Project
During the Quarter CRR agreed to acquire a 100% interest in the Amoco Antimony-Gold Project
(EL9293), located adjacent to the Company’s existing Hillgrove South (Mayview Antimony-Gold
prospect) and Halls Peak Projects, and 17km southeast of Larvotto Resources’ (ASX:LRV)
Hillgrove Antimony-Gold operations.
The Amoco project hosts historic highly anomalous rock chip and soil samples, over a length of
over 1,000m from east to west, with elevated gold mineralisation at 17.9g/t, 12.9 g/t and 10.4 g/t,
antimony at 0.53% and silver at 80g/t.
Sample ID
Sb ppm
Au ppm
Ag ppm
S671*5
AA*11
52863*12
C1S10*13
RC1*15
52962*2
52963*2
AG(1) *4
5,280
2,800
1,650
1,440
201
No Assay
No Assay
No Assay
12.9
7.29
4.7
3.63
1.03
2.6
1.0
17.9
18.5
14.3
4.0
3.3
15.8
80
20
6.2
GDA94 56J UTM
MGA E
409709
409704
409784
409704
407280
408519
408513
409502
GDA94 56J UTM
MGA N
6598211
6598193
6598210.8
6598193
6598088
6597759
6597752
6598185.5
Table 3: Historic rock sample highlights - Sb, Au and Ag analyses from Amoco Grid Area (Samples S671*5,
AA*11, 52863*12, C1S10*13, AG(1)*4 EL9293; samples RC1*15, 52962*2, 52963*2 EL4474).
The acquisition will cement the CRR’s position as one of the largest landholder in the Hillgrove-Halls
Peak region (981km2), with significant data indicating the area has the potential to host deposits
analogous to the Hillgrove-style antimony-gold system.
The Amoco project complements CRR’s existing strategic portfolio at Halls Peak that already
includes the Mayview Homestead Antimony Prospect.
Full details of the terms of the acquisition are available in the CRR ASX Announcement 8 November
2024.
Page 6 of 14
Mavis Lake Lithium Project (100%) – Ontario, Canada
Exploration
Latest assay results from the recent drilling campaign at Mavis Lake Main Zone area delivered
significant intercepts including of 34.9 meters grading 1.02% Li₂O from a depth of 131.55m
in spodumene-bearing pegmatite.
This intercept lies outside the current resource shapes in a gap within the model where a swell was
anticipated but previously unconfirmed. The successful identification of this mineralised zone
validates the geological model and reinforces the area’s potential for additional high-grade
lithium mineralisation.
Additional holes, including MF24-249 and MF24-256, targeted the southern extensions of the
recently identified Pegmatite 7 and 24 during the 2024 summer field program. Results from these
holes confirm that spodumene-bearing pegmatites extend further southward and remain open for
future exploration, underscoring the growth potential of these zones.
Notably, MF24-261, which tested the down-dip extension of the South Zone, delivered an intercept
of 10m at 1.56% Li₂O downhole. This result is particularly significant, as it demonstrates that the
pegmatites increase in thickness at depth. Additionally, this intercept extends the strike length of
the South Zone mineralisation towards the north, presenting a high-priority target for drilling.
Mavis Lake Pegmatite Intercepts
Hole ID
From (m)
To (m)
Down Hole
Interval (m)
Li2O (%)
Estimated True
Width (m)
MF24-248
80.75
88.2
7.45
1.54%
6.7
incl.
83.2
87.2
4
2.50%
3.6
and
131.55
166.45
34.9
1.02%
31.4
Incl.
131.55
158.95
27.4
1.24%
24.7
incl.
143.55
156
12.45
1.90%
11.2
and
268.15
273.5
5.35
1.04%
4.8
incl.
269.15
272.5
3.35
1.52%
3.0
MF24-249
21.55
25.65
4.1
0.74%
3.7
MF24-256
5.85
8.65
2.8
1.18%
2.5
MF24-261
284.3
305.5
21.2
1.14%
19.1
incl.
284.3
294.3
10
1.56%
9.0
incl.
301.1
305.5
4.4
1.41%
4.0
MF24-263
73.1
77
3.9
1.03%
3.5
Table 4: Significant Li2O mineralisation intercepts, Mavis Lake Main Zone deposit.
Page 7 of 14
Figure 4: Mavis Lake Main Zone cross-section illustrating the newly defined mineralisation
from MF24-248.
Figure 5: Plan Map of MF24-248 to MF24-263 Collar Locations in Orange.
Page 8 of 14
Latest drill results from the Tot Pegmatite within the Northern Prospects of the Mavis Lake Project
confirm the presence of a stacked mineralised system. Drilling has intersected spodumene-bearing
pegmatites across multiple stacked dykes within a brittle fault network, with assays returning
highlights shown in Table 5.
These intercepts confirm a spodumene-bearing pegmatite system, with the main Tot Pegmatite
remaining open down-dip and to the south. This establishes the Tot Pegmatite area as a highly
prospective target for ongoing exploration, significantly increasing the potential resource footprint
of the Mavis Lake Project Area.
Tot Pegmatite Intercepts
Hole ID
From (m)
To (m)
Down Hole
Interval (m)
Li2O (%)
Estimated True
Width (m)
TL24-001
29.35
34
4.65
1.45%
4.0
TL24-003
46.65
51.7
5.05
0.92%
4.2
TL24-004
39.25
41.4
2.15
2.02%
1.8
TL24-016
8
13
5
1.12%
4.5
incl.
9
10
1
3.44%
0.9
TL24-024
100
108.4
8.4
1.18%
7.6
TL24-025
114.95
123.65
8.7
1.21%
7.8
Table 5: Significant Li2O mineralisation intercepts from Tot Pegmatite.
The results validate the exploration strategy and highlight the opportunity for further growth in the
region. With additional results pending, this area is positioned for extensive follow-up testing.
Figure 6: Plan Map of the Mavis Lake Lithium Project Precinct.
Page 9 of 14
Mavis Lake Project Secures Ontario Junior Exploration Program (OJEP) Funding
In November CRR announced that its Mavis Lake Project had been accepted to participate in
the Ontario Junior Exploration Program (“OJEP”) for 2024-2025. This initiative supports early-stage
exploration of critical minerals, which is aligned with Ontario’s strategic objectives for the
mining sector.
Under the OJEP, eligible expenses incurred up to a capped threshold, between April 1, 2024, and
February 28, 2025, directly associated with and essential to the completion of the project, will be
eligible for up to $200k CAD.
Vermillion Bay Project - (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake Project and desktop studies at
the Halls Peak Project, limited exploration activities were conducted during the Quarter.
Graphic Lake Lithium Project (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake Project and desktop studies at
the Halls Peak Project, no exploration activities were conducted during the Quarter.
Plaid and Whiteloon Lake Projects (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake Project and desktop studies at
the Halls Peak Project, no exploration activities were conducted during the Quarter.
Sohar Block 4 and 5 Project – Sultanate of Oman
No field exploration activities were completed during the Quarter. As previously advised, the
Company was advised by the Ministry of Energy and Minerals, Sultanate of Oman, (Ministry) that
the exploration licences over Block 4 and Block 5 had expired and would not be renewed as they
had reached the end of their stated renewal period. The Company submitted applications for the
extension of the Block 5 mining licences (Mining Licences). The Company has received a letter
from the Ministry advising that the Mining Licences have been extended for a further 12 months
and requiring the Company to provide additional reports with respect to the mining licenses. The
Company indirectly retains a majority shareholding and associated asset interests in Al Fairuz
Mining (AFM) LLC and Al Thuraya Mining (ATM) LLC, the Company will engage in discussions with
the in-country management regarding the future of the projects
Schedule of mineral tenements
The Company’s tenement and claim schedule can be seen in Appendix 1.
Page 10 of 14
Finance
Exploration Expenditure
The Company invested approximately AUD1,763k (unaudited) in exploration activities across its
project portfolio during the Quarter, the majority focused on Mavis Lake.
Cash Position
The Company held cash and cash equivalents of AUD2,797m (unaudited) as at 31 December
2024.
Capital Raising
On 19 November 2024, the Company advised that Tranche 1 of a Placement announced on 8
November 2024 had settled, raising $2,800,000 (before costs), via the issue of 451,612,904 new fully
paid ordinary shares.
The Placement is being undertaken in two tranches, with the second tranche of 24,193,548 shares,
with attaching 12,096,774 options to Directors to raise $150,000 (before costs) and 8,064,516
tranche 2 New Shares, 229,838,710 Placement Options and 24,000,000 Lead Manager Options, to
be issued following shareholder approval at a general meeting of shareholders held on 16 January
2025.
The proceeds of the Placement will be used to advance activities at the Halls Peak Project
(including the newly identified Mayview Target and Amoco Antimony Projects), drilling activities
targeting the Northern Prospects and the Eastern zone of the Mavis Lake Main Project and general
working capital.
As approved by shareholders on 25 October 2024, the Company has additionally completed the
allotment of the remaining Director Placement Shares, Director Placement Options, Tranche 2
Placement Options and Lead Manager Options completing the Company capital raising as
announced on 14 August 2024. Please refer to the Notice of Meeting dated 25 September 2024
for further details.
Other Disclosure
As disclosed under item 6 in the Appendix 5B, the Company made payments to related parties for
a total consideration of AUD$17k. This consideration relates to payments attributable to routine
Director fees, salaries and statutory superannuation
Business Development
The Company continues to evaluate multiple critical minerals opportunities globally. As it looks to
increase its exposure to other asset classes, the Company looks forward to updating the market as
any discussion progress. There is no certainty that current discussions will result in new project
acquisitions.
Page 11 of 14
Corporate Activity
A General Meeting of Shareholders of Critical Resources was held in Perth on 16 January 2025. All
Resolutions put to the General Meeting of the Company were passed by a poll.
The Managing Director position remains vacant in the immediate term, with the Company electing
to reduce to a three-man Board of Directors. The Company’s board has assumed day-to-day
management functions until a suitable candidate is found.
Key ASX Announcements during the Quarter and since
16 January 2025
Results of Meeting
16 December 2024 Exceptional 52.3% Antimony Discovery at Mayview
4 December 2024 Hillgrove South Antimony Sampling & Silver Geological Review
2 December 2024 Further Drilling Success at Mavis Lake and Tot Pegmatite
25 November 2024 Mavis Lake Secures OJEP Funding
19 November 2024 Capital Raising Completed and Section 708A(5) Notice
19 November 2024 Hillgrove South Mapping & Sampling Identifies Visual Antimony
8 November 2024 Amoco Antimony Gold Project Acquisition & Placement
31 October 2024
Field Work Campaigns to Begin at Antimony Prospects
30 October 2024
Maiden Drilling Identifies Mineralised Stacked System at Tot
28 October 2024
Significant New Discovery at Mavis Lake’s Main Zone
25 October 2024
Results of Meeting
3 October 2024
Capital Raising Completed & Section 708A(5) Notice
3 October 2024
Exploration Data Highlights Antimony System Prospectivity
This announcement has been approved for release by the Board of Directors.
-endsE: info@criticalresources.com.au
P: +61 (8) 9465 1024
For further information please contact
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future. The Company’s Mavis Lake Lithium Project in Ontario, Canada,
where it has completed over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07%
Li2O. Recent exploration success has demonstrated substantial potential to expand this resource and make new
discoveries in the surrounding area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource
growth in parallel with multiple permitting and project development workstreams.
The Company’s Hall Peak Base Metals Project is located 87km south-east of Armidale New South Wales, Australia, a
reginal hub in New South Wales. The Company has defined a maiden Inferred Mineral Resource of 884,000t grading
3.7% zinc, 1.5% lead, 0.4% Copper, 30ppm Silver and 0.1ppm Gold has been estimated following numerous drilling
campaigns. Modelling has shown that mineralisation is still open along strike to the east/north-east and west/southwest, providing immediate potential to increase the MRE with follow-up drilling.
Page 12 of 14
COMPLIANCE STATEMENT This announcement contains information on the Halls Peak Project extracted from ASX
market announcements dated 22 November 2021, 30 June 2023, 28 August 2024, 13 September 2024, 3 October 2024,
8 November 2024, 19 November 2024, 4 December 2024 and 16 December 2024 reported in accordance with the
2012 JORC Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in any original ASX market
announcement.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from
ASX market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available
for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
Halls Peak Project
Zn Cut-Off
Tonnage
JORC
Zn (%)
Pb (%)
Cu (%)
Ag ppm
Au pm
SG (calc)
grade (%)
(Mt)
Classification
Inferred
2.0
0.84
3.7
1.5
0.44
30
0.1
2.80
Total*
Inferred
0.84
3.7
1.5
0.44
30
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated
block model, with blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to ASX
announcement 30 June 2024.
This announcement contains information on the Mavis Lake Lithium Project extracted from ASX market announcements
dated 25 October 2021, 21 July 2022, 25 October 2022, 31 October 2022, 20 December 2022, 27 March 2023, 16 June
2023, 27 June 2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023
24 October 2023, 15 November 2023, 13 February 2024, 18 March 2024, 17 April 2024, 2 May 2024, 22 May 2024, 29 May
2024, 2 July 2024, 8 July 2024, 22 August 2024, 28 October 2024, 30 October 2024 and 2 December 2024 reported in
accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au.
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012
JORC Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and
have not materially changed.
JORC Classification
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
Inferred
Total*
0.3
Inferred
8.0
8.0
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting.
Classification is according to JORC Code Mineral Resource categories. Refer to ASX announcement 5 May 2023, 8.0 Mt at 1.07% Li2O
Maiden Mineral Resource at Mavis Lake.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied,
as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this announcement.
Page 13 of 14
Appendix 1 – Schedule of mineral tenements at 31 December 2024
Claim Number
Project /
Location
Disposed
interest
during
quarter
Interest at
end of
Quarter
101034, 101215-101218, 101616-101619, 101758, 102759, 103512,
107330-107331, 107432, 107452-107454, 109871, 110434, 110703,
116242-116243, 116376, 116481, 116833, 117689-117690, 121130,
122424, 123068, 124332, 126738, 128065, 128770, 129509, 130111,
130299-130330, 135026, 135728, 138331, 138446, 139468-139470,
139609-139610, 140299, 141103, 141801, 143041, 143046-143047,
144330, 144441, 145544-145546, 145568, 145570-145572, 151583151585, 151642,157160- 157161, 158448, 158546, 158921, 160267,
160902, 166897, 167079-167080, 167677, 168187-168188, 168229,
168328-168329, 170252, 174132-174134, 174153, 176105, 176198,
179416-179418, 179741-179743, 180192, 108489, 181000, 181037,
182187, 183051-183052, 186194, 187649, 188359, 189624, 190960190961, 191576, 192111-192112, 192114-192115, 192814, 195537,
196153- 196154, 196277 – 196278, 197591, 198244-198246, 199857,
201802, 203140-203142, 203594, 203763, 204202, 204223-204224,
205589, 205676, 207864, 209134-209136, 210239, 210345-210347,
210372-210374, 210439, 211060-211061, 212294-212295, 214215,
215413, 215824, 216365-216366, 217064, 218430, 227456-227457,
228108, 228777-228778, 229375, 229402-229404, 230161- 230162,
231619-231620, 233613-233614, 233867, 234258 ,234948, 235582,
239067, 240149, 240258, 240281, 240947, 246549, 247620, 248263248968, 253509-253510, 254970, 256451-256452, 256960, 257849,
257852, 259169, 259285, 262170, 262949, 264260, 264285, 266452,
267141, 268289, 270261, 270910, 271534, 271591, 272225-272226,
273079, 273609, 274526, 275823-275825, 278758, 280340, 281841,
282015, 282234-282235, 283653-283655, 284320-284321, 285690285691, 286761-286763, 287377, 287379, 287408, 289910, 290059290060, 290357, 290972, 291666-291667, 292149, 295414-295418,
296097, 296098, 302230, 303032, 303733-303734, 305020-305022,
306990, 307466- 307467, 308112, 308122, 308140-308141, 310379313380, 312334, 314170-314171, 314748, 314826-314827, 316293316294, 316884, 325843, 326459, 329628-329631, 329632, 330228,
330271, 330895, 335072, 335696, 336398-336399, 340670, 340962,
341294-3412
Share your feedback
Discover