Final assays boost resource growth potential - Mavis Lake
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
27 JUNE 2025
Final assays boost resource growth potential - Mavis Lake
Lithium Project
-
Final assay results have been received for Critical Resources’ Mavis Lake Lithium project for the
Resource Expansion drilling and the Tot Prospect.
-
Drilling at Mavis Lake main zone confirmed potential to expand future resource updates with
the intersections of high-grade spodumene outside the current 8Mt @ 1.07% Li₂O Inferred
Resource, with significant drill results including :
•
•
•
•
-
14.6m @ 1.83% Li₂O at 120.6m downhole (MF24-267)
11.7m @ 1.28% Li₂O at 106.3m downhole (MF24-268)
9.15m @ 1.21% Li2O at 124.9m downhole (MF24-269)
8.9m @ 1.17% Li₂O at 72.5m downhole (MF24-270)
Drilling at the Tot prospect successfully extended spodumene-bearing pegmatite and confirms
mineralisation remains open to the south and down dip, with significant intersections including:
•
•
3.5m @ 1.75% Li₂O at 126.57m downhole (TL24-028)
5.9m @ 0.72% Li₂O at 176.4m downhole (TL24-026)
-
The Mavis Lake Project remains a strategically important lithium resource for the North
American lithium supply chain and is ideally positioned when lithium markets improve.
-
The Company has successfully completed the second tranche of the $1.1 million placement
at $0.004 per share. Additionally, the acquisition of the Amoco Antimony-Gold project in New
South Wales (EL9293) has been finalized with the issues of 30,864,198 shares at $0.0081.
Critical Resources Limited (‘Critical Resources’ or the ‘Company’, ASX:CRR) is pleased to report the receipt
of the final assay results from the 2024 drilling campaign at the 100%-owned Mavis Lake Lithium Project,
Ontario - Canada. The results continue to demonstrate the high-grade mineralisation at Mavis Lake Deposit
and at the emerging potential at the Tot lithium Prospect.
Critical Resources’ Chief Executive Officer, Mr. Tim Wither, commented “These final drill results close out the
drill programs at Mavis Lake. We continue to see impressive lithium grades and widths across the Main Zone,
and the Tot Pegmatite system is clearly evolving into a fantastic new target area. We’ve proven that Mavis
Lake has the scale and grade to become a meaningful contributor to the North American lithium supply
chain, and we continue to monitor the lithium markets, ready for the next lithium cycle.”
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Mavis Lake Main Zone – Resource Expansion Continues Beyond Existing 8Mt Estimate
Drilling at the Mavis Lake Main Zone throughout 2024 has continued to build on the foundation of the current
8Mt @ 1.07% Li₂O Inferred Mineral Resource Estimate (MRE), defined under JORC 2012 (ASX:CRR
announcement 5 May 2023). The final results confirm that spodumene-bearing pegmatites extend well
beyond the current resource estimate model, confirming consistent widths with strong lithium grades at
depth and along strike.
Multiple zones of stacked and thickened pegmatites were intersected in areas that were previously sparsely
drilled or entirely untested. These include mineralised intercepts such as 14.6m @ 1.83% Li₂O (MF24-267),
11.75m @ 1.28% Li₂O (MF24-268), and 8.95m @ 1.17% Li₂O (MF24-270), all intersect spodumene dominant
pegmatites outside the current extents or expanded interpreted widths of the current resource model
(Appendix A – Table 1).
Figure 1 - Mavis Lake Main Zone cross-section illustrating the mineralisation from MF24-267.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Figure 2: Plan Map of MF24-264 to MF24-276 Collar Locations in Orange.
System Expansion Confirmed
Drilling at the Tot Pegmatite was successful in extending known spodumene-bearing pegmatite
mineralisation at depth and along strike to the south. Notably, hole TL24-028 intersected 3.5m @ 1.75% Li₂O,
confirming down-dip continuity, while TL24-026 intersected 5.93m @ 0.72% Li₂O, extending the mineralised
pegmatite south (Appendix A – table 3).
The completed drill program included a series of regional step-out holes to test for additional stacked
pegmatite systems within the broader structural corridor. While these holes encountered favourable
structural and lithological stratigraphy, they did not intersect additional spodumene-bearing pegmatites.
Importantly, the Tot Pegmatite system remains open to the south and at depth and continues to represent
a priority growth target. The Company’s understanding of the structural controls and geophysical anomalies,
and geochemical signatures associated with spodumene-bearing pegmatite at Tot will be leveraged to
refine future drill targeting.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Figure 3 - Plan map of drill collars in orange. Drill holes were designed to the Tot pegmatite extension to the south and
the regional targets produced from the UAV magnetic survey and MMI Soil anomalies.
Positioning Mavis Lake for the Next Lithium Upswing
Critical Resources is maintaining a financial disciplined and strategic approach to advancing the Mavis Lake
Project, ensuring it is well positioned to move quickly when lithium markets improve. With significant resource
growth potential already demonstrated, the Company’s current focus is on maintaining project momentum
through technical cost-effective workstreams that add long-term value.
Current market conditions do not support additional high-cost drilling, the completed 2024 drilling campaign
has expanded mineralisation well beyond existing resource shapes at the Main Zone and confirmed a
growing spodumene system at Tot Pegmatite, providing a strong foundation for a future resource increase
and subsequent technical studies. An additional total of 23,104 metres of drilling throughout the Main Zone
and additional 7,533 metres of drilling at the Tot Pegmatite within Mavis Lake Project Area has yet to be
included into an updated MRE model.
In parallel, environmental baseline work and permitting initiatives have progressed, including engagement
with local communities and First Nations. These efforts ensure that the project can continue to advance
toward a development-ready status, aligned with regulatory and ESG expectations.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Exploration efforts are being directed toward high-impact greenfield programs across the broader Mavis
Lake Project Area. One of the most promising is the Gullwing Pegmatite, which is fully permitted and drill
ready. Spodumene-bearing pegmatite has been mapped at surface, potentially unlocking a new discovery
within the immediate Mavis Lake project area.
The Company continues to invest in low-cost, high-value technical work ensuring that Mavis Lake remains
one of the most strategically positioned lithium assets in Ontario — ready to accelerate toward resource
expansion and development when the lithium cycle turns.
Figure 4 - Project Location map showing Mavis Lake project area.
This announcement has been approved for release by the Board of Directors of Critical Resources.
For further information, please visit www.criticalresources.com or contact:
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is an Australian mining company focused on the exploration and development of metals needed for
a sustainable future. The Company holds the Mavis Lake Lithium Project, located in Ontario, Canada, with drilling
exceeding 45,000 meters. This has defined a maiden inferred resource of 8 million tonnes at 1.07% Li2O, with significant
potential to expand this resource and identify new discoveries within the surrounding area.
The Company’s Hall Peak Base Metals Project is located ~87km south-east of Armidale, New South Wales, Australia. The
Company has defined a maiden Inferred Mineral Resource of 884,000t @ 3.7% Zn, 1.5% Pb, 0.4% Cu, 30g/t Ag and 0.1g/t
Au. The Hall Peak ~950 km2 exploration tenure includes two advanced antinomy-gold prospects – Mayview and Amoco.
Figure 5 - Project Location map showing Halls Peak project area proximity to significant Antimony-Gold projects in the
Armidale region, NSW, Australia.
Halls Peak – Gibson Base Metals Project - Mineral Resource Estimate
Halls Peak Project
JORC Classification
Indicated
Inferred
Total*
Zn Cut-Off
grade (%)
2.0
-
Tonnage
(Mt)
0.84
0.84
Zn (%)
Pb (%)
Cu (%)
3.7
3.7
1.5
1.5
0.44
0.44
Ag ppm
(g/t)
30
30
Au ppm
(g/t)
0.1
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated block model, with
blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to the ASX:CRR announcement 30 June 2024.
Mavis Lake Lithium Project - Mineral Resource Estimate
Mavis Lake -Lithium Project
JORC Classification
Inferred
Total*
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
0.3
8.0
8.0
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting. Classification is
according to JORC Code Mineral Resource categories. Refer to ASX:CRR announcement 5 May 2023.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
COMPETENT PERSON STATEMENT
The information in this ASX Announcement that relates to Exploration Results is based on information compiled by Mr Troy
Gallik (P. Geo), a Competent Person who is a member of the Association of Professional Geoscientists of Ontario. Troy
Gallik is a full-time employee of Critical Resources. Mr Gallik has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr Gallik consents to the inclusion in this Announcement of the matters based on his information in
the form and context in which it appears.
PREVIOUSLY REPORTED INFORMATION
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012 JORC
Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and have not
materially changed.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from ASX
market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed.
This announcement contains information on the Mavis Lake Project extracted from ASX market announcements dated
25 October 2021, 21 July 2022, 31 October 2022, 5 May 2023 reported in accordance with the 2012 JORC Code and
available for viewing at www.criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original ASX market announcement.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward-looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward-looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projections based on
new information, future events or otherwise, except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Appendix A
Table 1 - Significant Li2O mineralisation intercepts, Mavis Lake Main Zone deposit.
Mavis Pegmatite Intercepts
Hole ID
Down Hole
Interval (m)
From (m)
To (m)
Li2O (%)
True Width (m)
MF24-267
87.1
94.05
6.95
1.50%
6.3
and
120.6
135.2
14.6
1.83%
13.1
and
265.4
271.05
5.65
1.15%
5.1
MF24-268
78.9
83.35
4.45
1.60%
4.0
and
106.35
118.1
11.75
1.28%
10.6
MF24-269
63.8
72.55
8.75
0.95%
7.9
and
80.5
83.85
3.35
1.24%
3.0
and
124.9
134.05
9.15
1.21%
8.2
and
260.2
269.3
9.1
1.15%
8.2
MF24-270
42.9
48.75
5.85
1.52%
5.3
and
58.75
60.75
2
1.41%
1.8
and
72.5
81.45
8.95
1.17%
8.1
and
102.25
110.1
7.85
0.97%
7.1
and
119.9
125.25
5.35
1.29%
4.8
MF24-271
264
270.8
6.8
1.50%
6.1
MF24-272
15.4
18.9
3.5
1.37%
3.2
and
226.3
237.7
11.4
0.50%
10.3
MF24-273
120.15
127.9
7.75
0.85%
7.0
Table 2 – Drill Hole Summary Mavis Lake MF24-264 to MF24-276
Hole ID
UTM Zone 15N (NAD83)
Collar Orientation
Metres Drilled
Hole ID
Easting
Northing
Elevation
Az
Dip
Casing Depth
End Depth
MF24-264
525061.64
5517818.4
426
320
-45
3
119
MF24-265
524888.42
5517854.2
428
105
-60
3
272
MF24-266
524882
5517861
431
70
-57
3
284
MF24-267
524559
5518006
432
318
-73
3
401
MF24-268
524566
5518016
427
34.9
-76.1
2
155
MF24-269
524564
5518014
427
0
-74
3
290
MF24-270
524620
5518007
434
350
-76
3
155
MF24-271
524519
5518122
436
220
-79.3
3
314
MF24-272
524804
5518077
428
290
-79
6
266
MF24-273
524806
5518076
427
55
-80
6
269
MF24-274
525004
5518143
424
244.7
-75.3
9
248
MF24-275
525004
5518143
424
139.62
-44.54
9
230
MF24-276
525050
5517993
424
120
-51
9
194
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Table 3 - Significant Li2O mineralisation intercepts from Tot Pegmatite
Tot Pegmatite Intercepts
Hole ID
From (m)
To ()
Down Hole
Interval (m)
Li2O (%)
True Width (m)
TL24-026
126.57
132.5
5.93
0.72%
5.25
TL24-028
176.4
179.9
3.5
1.75%
3.0
Table 4: Drill Hole Summary from Tot Pegmatite from TL24-026 to TL24-052
Hole ID
UTM Zone 15N (NAD83)
Collar Orientation
Metres Drilled
Hole ID
Easting
Northing
Elevation
Az
Dip
Casing Depth
End Depth
TL24-026
539079.43
5530847.5
402.29617
212
-62
12
147
TL24-027
539148.57
5530844.2
399.01303
230
-55
12
191
TL24-028
539149.16
5530842
402.03003
235
-58
12
206
TL24-029
539019.63
5530631.6
407.73395
210
-66
12
134
TL24-030
539020.33
5530633.7
409.60394
275
-45
12
80
TL24-031
539018.61
5530632.9
411.28931
250
-45
15
122
TL24-032
539001.99
5530628.9
410.89462
260
-45
20
74
TL24-033
539002.63
5530629.2
409.22833
260
-68
12
80
TL24-034
539019.63
5530581.1
408.38467
335
-45
9
101
TL24-035
539194.52
5530792.9
402.3562
255
-45
9
224
TL24-036
539193.38
5530791.8
401.76904
255
-65
12
269
TL24-037
539191.16
5530791.9
405.57864
227
-70
18
266
TL24-038
539192.24
5530791.2
406.3859
230
-45
15
200
TL24-039
539373.4
5530870.7
389.2821
235
-45
3
137
TL24-040
539335.29
5530811.6
388.73367
235
-45
3
131
TL24-041
539267.57
5530767
393.82101
235
-45
3
137
TL24-042
538876.28
5530820.7
396.45569
230
-45
3
131
TL24-043
538824.12
5530778.2
401.23502
230
-45
10.5
131
TL24-044
538767.34
5530728.4
397.16089
230
-45
10.5
131
TL24-045
538646.79
5530782.9
401.68018
230
-45
12
131
TL24-046
538600.73
5530751.2
399.13257
230
-45
12
134
TL24-047
538547.34
5530708.8
403.81421
230
-45
9
140
TL24-048
538470.79
5530693.7
409.60053
230
-45
9
140
TL24-049
538498.92
5530796.5
392
335
-45
12
194
TL24-050
539028.67
5531085.1
390
230
-45
11.1
164
TL24-051
538963.81
5531030
390
230
-45
9
149
TL24-052
538906.35
5530981.8
390
230
-45
9
165
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Table 5 – Mavis Lake Assay Data
(all sample assay results from MF24-264 to MF24-276)
Hole
From
To
Sample
Li (ppm)
Li2O (%)
Hole
From
To
Sample
Li (ppm)
Li2O (%)
MF24-264
56.2
57.2
341985
319
0.069
MF24-264
88.55
89.55
1598031
721
0.155
MF24-264
57.2
58.2
341986
389
0.084
MF24-264
89.55
90.55
1598032
815
0.175
MF24-264
58.2
58.6
341987
83
0.018
MF24-265
183.1
184.1
1598033
561
0.121
MF24-264
58.6
59.3
341988
215
0.046
MF24-265
184.1
185.1
1598034
1150
0.248
MF24-264
59.3
59.6
341989
20
0.004
MF24-265
185.1
185.9
1598035
2260
0.487
MF24-264
59.6
59.9
341991
71
0.015
MF24-265
185.9
186.75
1598036
1440
0.310
MF24-264
59.9
60.25
341992
208
0.045
MF24-265
186.75
187.05
1598037
174
0.037
MF24-264
60.25
61.05
341993
2190
0.472
MF24-265
187.05
188.05
1598038
401
0.086
MF24-264
61.05
61.35
341994
727
0.157
MF24-265
188.05
189.05
1598039
295
0.064
MF24-264
61.35
62.25
341995
2280
0.491
MF24-265
195.4
195.7
1598041
380
0.082
MF24-264
62.25
62.55
341996
923
0.199
MF24-265
197.85
198.85
1598042
662
0.143
MF24-264
62.55
63.55
341997
691
0.149
MF24-265
198.85
199.85
1598043
1180
0.254
MF24-264
63.55
64.05
341998
1210
0.261
MF24-265
199.85
200.15
1598044
466
0.100
MF24-264
64.05
65.05
341999
2730
0.588
MF24-265
200.15
200.95
1598045
896
0.193
MF24-264
65.05
66.05
1598001
1980
0.426
MF24-265
200.95
201.6
1598046
5740
1.236
MF24-264
66.05
67.05
1598002
3650
0.786
MF24-265
201.6
202.6
1598047
1200
0.258
MF24-264
67.05
67.55
1598003
2980
0.642
MF24-265
202.6
203.6
1598048
430
0.093
MF24-264
67.55
68.55
1598004
948
0.204
MF24-265
203.6
204.8
1598049
929
0.200
MF24-264
68.55
69.55
1598005
2420
0.521
MF24-265
204.8
205.8
1598051
282
0.061
MF24-264
69.55
70.15
1598006
588
0.127
MF24-265
205.8
206.8
1598052
793
0.171
MF24-264
70.15
70.95
1598007
3500
0.754
MF24-265
206.8
207.25
1598053
2840
0.611
MF24-264
70.95
72.1
1598008
1740
0.375
MF24-265
207.25
208.25
1598054
5040
1.085
MF24-264
72.1
72.4
1598009
2830
0.609
MF24-265
208.25
209.25
1598055
7440
1.602
MF24-264
72.4
73.4
1598011
329
0.071
MF24-265
209.25
209.55
1598056
287
0.062
MF24-264
73.4
74.4
1598012
1990
0.428
MF24-265
209.55
210.55
1598057
498
0.107
MF24-264
74.4
75.45
1598013
170
0.037
MF24-265
210.55
211.55
1598058
530
0.114
MF24-264
75.45
75.8
1598014
973
0.209
MF24-265
218.3
219.3
1598059
299
0.064
MF24-264
75.8
76.8
1598015
163
0.035
MF24-265
219.3
220.3
1598061
368
0.079
MF24-264
76.8
77.8
1598016
1120
0.241
MF24-265
220.3
220.9
1598062
82
0.018
MF24-264
77.8
78.8
1598017
2020
0.435
MF24-265
220.9
221.9
1598063
352
0.076
MF24-264
78.8
79.7
1598018
1440
0.310
MF24-265
221.9
222.9
1598064
515
0.111
MF24-264
79.7
80.7
1598019
1370
0.295
MF24-265
222.9
224.25
1598065
354
0.076
MF24-264
80.7
81.6
1598021
144
0.031
MF24-265
224.25
225.4
1598066
390
0.084
MF24-264
81.6
82.6
1598022
904
0.195
MF24-265
225.4
226.4
1598067
140
0.030
MF24-264
82.6
83.6
1598023
1130
0.243
MF24-265
226.4
227.4
1598068
319
0.069
MF24-264
83.6
84.05
1598024
1240
0.267
MF24-265
227.4
227.95
1598069
29
0.006
MF24-264
84.05
84.65
1598025
694
0.149
MF24-265
227.95
228.35
1598071
46
0.010
MF24-264
84.65
85.65
1598026
29
0.006
MF24-265
228.35
229.35
1598072
71
0.015
MF24-264
85.65
86.65
1598027
24
0.005
MF24-265
229.35
230
1598073
35
0.008
MF24-264
86.65
87.65
1598028
46
0.010
MF24-265
230
230.35
1598074
232
0.050
MF24-264
87.65
88.55
1598029
65
0.014
MF24-265
238.15
239.15
1598075
187
0.040
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Hole
From
To
Sample
Li (ppm)
Li2O (%)
Hole
From
To
Sample
Li (ppm)
Li2O (%)
MF24-265
239.15
240.15
1598076
222
0.048
MF24-267
52.6
53.6
1598124
474
0.102
MF24-265
240.15
241.5
1598077
101
0.022
MF24-267
53.6
54.6
1598125
240
0.052
MF24-265
241.5
242.5
1598078
227
0.049
MF24-267
54.6
55.6
1598126
242
0.052
MF24-265
242.5
243.5
1598079
223
0.048
MF24-267
55.6
56.6
1598127
1350
0.291
MF24-266
187.15
188.15
1598081
253
0.054
MF24-267
56.6
57.6
1598128
474
0.102
MF24-266
188.15
189.15
1598082
278
0.060
MF24-267
57.6
58.6
1598129
567
0.122
MF24-266
189.15
189.55
1598083
55
0.012
MF24-267
58.6
59.6
1598131
327
0.070
MF24-266
189.55
190.55
1598084
268
0.058
MF24-267
65.95
66.95
1598132
799
0.172
MF24-266
190.55
191.55
1598085
267
0.057
MF24-267
66.95
67.95
1598133
339
0.073
MF24-266
203.1
203.45
1598086
324
0.070
MF24-267
67.95
68.95
1598134
317
0.068
MF24-266
213.75
214.75
1598087
320
0.069
MF24-267
68.95
69.5
1598135
152
0.033
MF24-266
214.75
215.75
1598088
278
0.060
MF24-267
69.5
70.15
1598136
1860
0.400
MF24-266
215.75
216.35
1598089
80
0.017
MF24-267
70.15
71.15
1598137
2490
0.536
MF24-266
216.35
217.1
1598091
468
0.101
MF24-267
71.15
71.8
1598138
5850
1.260
MF24-266
217.1
218.35
1598092
792
0.171
MF24-267
71.8
72.8
1598139
789
0.170
MF24-266
218.35
218.8
1598093
70
0.015
MF24-267
72.8
73.3
1598141
1510
0.325
MF24-266
218.8
219.4
1598094
3660
0.788
MF24-267
73.3
74.3
1598142
806
0.174
MF24-266
219.4
220.2
1598095
4600
0.990
MF24-267
74.3
74.65
1598143
178
0.038
MF24-266
220.2
221.2
1598096
6740
1.451
MF24-267
74.65
75.65
1598144
499
0.107
MF24-266
221.2
221.65
1598097
1460
0.314
MF24-267
75.65
76.65
1598145
303
0.065
MF24-266
221.65
222.5
1598098
1410
0.304
MF24-267
76.65
77.65
1598146
246
0.053
MF24-266
222.5
222.85
1598099
3430
0.738
MF24-267
77.65
78.95
1598147
219
0.047
MF24-266
222.85
223.2
1598101
116
0.025
MF24-267
78.95
79.95
1598148
210
0.045
MF24-266
223.2
223.5
1598102
498
0.107
MF24-267
79.95
80.95
1598149
178
0.038
MF24-266
223.5
223.85
1598103
46
0.010
MF24-267
80.95
81.95
1598151
258
0.056
MF24-266
223.85
225.15
1598104
2370
0.510
MF24-267
81.95
82.95
1598152
534
0.115
MF24-266
225.15
225.55
1598105
122
0.026
MF24-267
82.95
84.25
1598153
168
0.036
MF24-266
225.55
226.55
1598106
829
0.178
MF24-267
84.25
85.25
1598154
1840
0.396
MF24-266
226.55
227.55
1598107
110
0.024
MF24-267
85.25
86.1
1598155
910
0.196
MF24-266
234.8
235.15
1598108
116
0.025
MF24-267
86.1
87.1
1598156
1410
0.304
MF24-267
40.45
41.45
1598109
358
0.077
MF24-267
87.1
88.05
1598157
12300
2.648
MF24-267
41.45
42.45
1598111
814
0.175
MF24-267
88.05
89.05
1598158
10100
2.175
MF24-267
42.45
43.25
1598112
144
0.031
MF24-267
89.05
90.05
1598159
12100
2.605
MF24-267
43.25
44.25
1598113
562
0.121
MF24-267
90.05
91.05
1598161
8130
1.750
MF24-267
44.25
45.25
1598114
2250
0.484
MF24-267
91.05
92.05
1598162
6150
1.324
MF24-267
45.25
46.25
1598115
1520
0.327
MF24-267
92.05
93.05
1598163
167
0.036
MF24-267
46.25
47.25
1598116
1460
0.314
MF24-267
93.05
94.05
1598164
216
0.047
MF24-267
47.25
48.1
1598117
2560
0.551
MF24-267
94.05
95.05
1598165
1790
0.385
MF24-267
48.1
49.1
1598118
2520
0.543
MF24-267
95.05
96.05
1598166
1470
0.316
MF24-267
49.1
50.1
1598119
2450
0.527
MF24-267
96.05
97.05
1598167
710
0.153
MF24-267
50.1
51.1
1598121
1950
0.420
MF24-267
97.05
98.05
1598168
897
0.193
MF24-267
51.1
51.6
1598122
1080
0.233
MF24-267
98.05
99.05
1598169
809
0.174
MF24-267
51.6
52.6
1598123
5510
1.186
MF24-267
99.05
100.05
1598171
532
0.115
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Hole
From
To
Sample
Li (ppm)
Li2O (%)
MF24-267
100.05
101.05
1598172
392
0.084
Hole
From
To
Sample
Li (ppm)
Li2O (%)
MF24-267
158.15
159.15
1598219
217
0.047
MF24-267
101.05
102.05
1598173
254
0.055
MF24-267
177.55
178.55
1598221
374
0.081
MF24-267
102.05
103.05
1598174
208
0.045
MF24-267
178.55
179.55
1598222
741
0.160
MF24-267
118.6
119.6
1598175
1080
0.233
MF24-267
179.55
180.55
1598223
776
0.167
MF24-267
119.6
120.6
1598176
2680
0.577
MF24-267
180.55
181.55
1598224
630
0.136
MF24-267
120.6
121.2
1598177
3260
0.702
MF24-267
181.55
182.55
1598225
547
0.118
MF24-267
121.2
122.2
1598178
11900
2.562
MF24-267
182.55
183.65
1598226
2230
0.480
MF24-267
122.2
123.2
1598179
9320
2.007
MF24-267
183.65
184.1
1598227
3810
0.820
MF24-267
123.2
124.2
1598181
9570
2.060
MF24-267
184.1
184.85
1598228
2360
0.508
MF24-267
124.2
125.2
1598182
6570
1.415
MF24-267
184.85
185.85
1598229
1900
0.409
MF24-267
125.2
126.2
1598183
15100
3.251
MF24-267
185.85
186.85
1598231
567
0.122
MF24-267
126.2
127.2
1598184
8140
1.753
MF24-267
186.85
188.2
1598232
597
0.129
MF24-267
127.2
128.2
1598185
9320
2.007
MF24-267
188.2
189.2
1598233
1190
0.256
MF24-267
128.2
129.2
1598186
1540
0.332
MF24-267
189.2
190.2
1598234
1750
0.377
MF24-267
129.2
130.2
1598187
7580
1.632
MF24-267
190.2
191.45
1598235
539
0.116
MF24-267
130.2
131.2
1598188
12800
2.756
MF24-267
191.45
192.15
1598236
3010
0.648
MF24-267
131.2
132.2
1598189
6050
1.303
MF24-267
192.15
193.05
1598237
2930
0.631
MF24-267
132.2
133.2
1598191
8930
1.923
MF24-267
193.05
194.05
1598238
1630
0.351
MF24-267
133.2
134.2
1598192
8950
1.927
MF24-267
194.05
194.6
1598239
316
0.068
MF24-267
134.2
135.2
1598193
6420
1.382
MF24-267
194.6
195.6
1598241
454
0.098
MF24-267
135.2
136.2
1598194
1960
0.422
MF24-267
195.6
196.6
1598242
226
0.049
MF24-267
136.2
137.2
1598195
682
0.147
MF24-267
196.6
197.6
1598243
220
0.047
MF24-267
137.2
138.75
1598196
314
0.068
MF24-267
227.5
228
1598244
176
0.038
MF24-267
138.75
139.75
1598197
393
0.085
MF24-267
229.05
229.4
1598245
122
0.026
MF24-267
139.75
140.75
1598198
759
0.163
MF24-267
235.7
236.7
1598246
120
0.026
MF24-267
140.75
141.75
1598199
36
0.008
MF24-267
236.7
237.7
1598247
163
0.035
MF24-267
141.75
142.75
1598201
319
0.069
MF24-267
237.7
238.25
1598248
25
0.005
MF24-267
142.75
143.75
1598202
1200
0.258
MF24-267
238.25
239.25
1598249
177
0.038
MF24-267
143.75
144.3
1598203
292
0.063
MF24-267
239.25
240.25
1598251
122
0.026
MF24-267
144.3
145.3
1598204
702
0.151
MF24-267
263.4
264.4
1598252
550
0.118
MF24-267
145.3
146.3
1598205
355
0.076
MF24-267
264.4
265.4
1598253
1700
0.366
MF24-267
146.3
147.3
1598206
280
0.060
MF24-267
265.4
266.05
1598254
4400
0.947
MF24-267
147.3
148.3
1598207
247
0.053
MF24-267
266.05
267.05
1598255
11400
2.454
MF24-267
148.3
149.05
1598208
375
0.081
MF24-267
267.05
268.05
1598256
8130
1.750
MF24-267
149.05
150.05
1598209
258
0.056
MF24-267
268.05
269.05
1598257
7060
1.520
MF24-267
150.05
151.05
1598211
370
0.080
MF24-267
269.05
270.05
1598258
236
0.051
MF24-267
151.05
152.05
1598212
607
0.131
MF24-267
270.05
271.05
1598259
597
0.129
MF24-267
152.05
153.05
1598213
521
0.112
MF24-267
271.05
272.05
1598261
816
0.176
MF24-267
153.05
154.05
1598214
328
0.071
MF24-267
272.05
273.05
1598262
1910
0.411
MF24-267
154.05
155.05
1598215
281
0.060
MF24-267
273.05
274.05
1598263
1550
0.334
MF24-267
155.05
156.15
1598216
67
0.014
MF24-267
281.95
282.3
1598264
180
0.039
MF24-267
156.15
157.15
1598217
245
0.053
MF24-267
335.15
336.15
1598265
995
0.214
MF24-267
157.15
158.15
1598218
218
0.047
MF24-267
3
Share your feedback
Discover