8kmof Highly Prospective Anomalies Identified at GullwingTot
Released
Released
Announcement PDF
ASX Announcement
17 April 2024
8km of Highly Prospective Anomalies and Follow-up Targets
Identified at Gullwing and Tot Prospects
Highlights
•
Multiple North-South linear trends analogous to the trends observed at the Gullwing and
Tot pegmatite outcrops identified by the recent airborne magnetic survey.
•
The magnetic anomalies are interpreted as either being extensions of known
pegmatites or representing additional pegmatite discoveries/significant structural
features.
•
Correlation of previously released geochemistry results with the airborne magnetic
survey data provides increased confidence in target prospectivity.
•
Prospective structures have been identified within areas that contain anomalies with
elevated levels of lithium, caesium, and rubidium.
•
Exploration team preparing to undertake immediate field reconnaissance, mapping
and sampling programs to ground-truth these encouraging geophysics and
geochemistry results.
Lithium exploration and project development company, Critical Resources Limited ASX:CRR
(“Critical Resources” or “the Company”) is pleased to report highly encouraging results from the
airborne magnetic survey completed across the Northern Prospects at the Company’s flagship
Mavis Lake Lithium Project in Ontario, Canada.
High-resolution survey completed across 8 kilometres of highly prospective ground
In October 2023, EarthEx Geophysical Solutions conducted a high-resolution, UAV-borne magnetic
survey across the Northern Prospects of the Mavis Lake Project Area. The survey was designed to
produce a detailed magnetic map to support litho-structural mapping for mineral exploration and
future drill targeting.
An ~8km long prospective trend was covered by 798-line kilometres of survey, with data collected
on 25m spaced lines and 250m spaced tie-lines.
The survey has revealed numerous magnetic anomalies closely associated with previously
mapped spodumene-bearing pegmatites at surface and other geochemical anomalies identified
from parallel exploration work streams.
The presence of coincident geophysical features and strong surface geochemical anomalies
enhances confidence in the ability to identify high-confidence drill targets across the Northern
Prospects.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
UAV-Borne Magnetic Survey
High-resolution magnetic data collected by UAV survey has proven to be highly effective in
identifying prospective new drill targets through the identification of possible litho-structures of
potential pegmatite emplacement (see Figures 1 and 2 below). This form of survey offers
exceptional litho-structural detail along the highly prospective 8km, East-West trend between the
spodumene-bearing Gullwing and Tot Pegmatites within the Northern Prospects.
The survey has identified multiple North-South linear trends exhibiting magnetic lows, analogous to
the trends observed in the Gullwing and Tot pegmatites. These magnetic anomalies are
interpreted as either being the extension of known pegmatites, the presence of additional
pegmatites, or previously undiscovered significant structural features.
Drawing from the magnetic signatures of the spodumene-bearing Gullwing and Tot pegmatite
dykes, the Company has developed a template for targeting other potential pegmatites across
the Project.
Figure 1: The residual magnetic intensity (RMI) of the Northern Prospects identifying
numerous North-South magnetic breaks (depicted by dashed black lines) assessed
as being caused by possible LCT pegmatite occurrences.
Page 2 of 13
Additionally, the survey has facilitated the creation of detailed 3D models of magnetic variances
across the property. The 3D magnetic model yields valuable exploration insights, including depth
of structure, body dip and overall shape and morphology of lithological units as shown in Figure 2.
Figure 2: Cross sections of N-S trending magnetic lows (blue) within a magnetic high (pink) mafic
volcanic host rock.
Layering exploration data to build high-confidence drilling targets
Building on previous exploration results, incorporating historical rock-chip and channel sampling
data, litho-geochemical sampling and the multiple Li, Cs, Rb Mobile Metal Ion (MMI) results across
the Northern Prospects, the Company is increasingly confident that significant LCT-Type
mineralisation is associated with the magnetic low structures identified from the airborne magnetic
survey.
The coincidence of magnetic lows and heightened geochemical responses for lithium and related
elements form priority targets for the Company’s future exploration efforts. These key target areas
are shown in Figure 3.
Future Work
Follow-up prospecting activities will build upon the comprehensive magnetic survey, geochemical
results and MMI soils results, with the aim of uncovering potential new spodumene-bearing
pegmatite discoveries.
Using the high-resolution magnetic data collected from the UAV survey, future prospecting efforts
will focus on delineating and exploring areas exhibiting magnetic lows indicative of favorable
lithological structures associated with pegmatite emplacement.
Additionally, the integration of soil sample results, particularly those showcasing elevated
concentrations of lithium and related elements identified through MMI analysis, will guide
prospecting activities towards areas with heightened potential for mineralisation.
Page 3 of 13
By systematically investigating these prospective zones – through geological mapping, grab
sampling and targeted prospecting – exploration teams will attempt to identify and delineate new
additional spodumene-bearing pegmatite occurrences, thereby advancing the understanding
and potential of the Northern Prospects.
Figure 3: Priority targets identified through overlaying MMI soil survey lithium results with the Aeromagnetic survey results – illustrating geochemical relationships with magnetic low structures.
Critical Resources Managing Director, Alex Cheeseman said:
"These exciting results provide a great example of how an aeromagnetic survey can accelerate
focused LCT pegmatite exploration efforts.
“The correlation of the aero-mag survey data with the geophysical ‘fingerprints’ of the known
spodumene-bearing Gullwing and Tot pegmatites – as well as overlaying anomalous geochemical
trends – has provided excellent targets for immediate follow-up field work.
“Given the size of the broader Mavis Lake Project area, the ability to focus fields teams onto highly
prospective targets ensures that we can continue to achieve the best possible return for every
exploration dollar spent.
“We see great exploration and discovery potential at the Northern Prospects and we are excited
to continue to test this part of the Project Area.”
This announcement has been approved for release by the Board of Directors.
-ends-
Page 4 of 13
For further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada
which are ideally positioned to participate in the rapidly growing North American battery materials supply chain.
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPETENT PERSONS STATEMENT The information in this ASX Announcement that relates to Exploration Results is based
on information compiled by Mr. Troy Gallik (P. Geo), a Competent Person who is a Member of the Association of
Professional Geoscientists of Ontario. Troy Gallik is a full-time employee of Critical Resources. Mr. Gallik has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Gallik consents to the inclusion in this
Announcement of the matters based on his information in the form and context in which it appears.
COMPLIANCE STATEMENT This document contains information on the Mavis Lake Lithium Project, Canada extracted
from ASX market announcements dated 20 December 2022, 29 December 2022, 18 May 2023 ,17 July 2023, 2
November 2023 and 18 March 2024, reported in accordance with the 2012 edition of the "Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves" ("2012 JORC Code"). The Company confirms that
it is not aware of any new information or data that materially affects the information included in the original ASX market
announcements. This document contains information relating to the Mineral Resource estimate for the Mavis Lake
Lithium Project is extracted from the Company’s ASX announcement dated 5 May 2023. The Company confirms that
it is not aware of any new information or data that materially affects the information included in the original
announcement and that all material assumptions and technical parameters underpinning the Mineral Resource
estimate continue to apply.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Page 5 of 13
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g., A drone-borne magnetic survey was conducted with a line
spacing of 25 m and tie line spacing of 250 m. The mean
cut channels, random chips, or
terrain clearance for the survey was 30 m. Two line azimuths
specific specialised industry standard
were chosen for this survey due to the orientations of the
measurement tools appropriate to
overall geological trend. The Gullwing (NS) was flown at 165the minerals under investigation,
degree azimuth to cover the geology of the entire area and
such as down hole gamma sondes, the Gullwing (EW) was flown at 75 degrees azimuth to map
the lithium bearing pegmatites within the mafic volcanic host
or handheld XRF instruments, etc).
These examples should not be taken rock. These pegmatites typically trend N-S to NNW-SSW,
therefore surveying at 165- and 75-degrees azimuth gives the
as limiting the broad meaning of
best possible survey coverage possible. The system
sampling.
comprises:
• DJI Matrice Pro 600 airborne platform.
Include reference to measures taken • RTK Telemetric navigation hardware.
to ensure sample representivity and
• Scintrex Cs-VL – Cesium Vapor Magnetometer.
the appropriate calibration of any
measurement tools or systems used. • Proprietary navigation system with automatic obstacle
avoidance.
Aspects of the determination of
mineralisation that are Material to
• GEM Overhauser or Proton Precession base station
the Public Report. In cases where
Before surveying a grid, a “cloverleaf” test is completed to
‘industry standard’ work has been
confirm that the geophysical system is performing correctly.
done this would be relatively simple
While doing this test the UAV flies in a cloverleaf pattern
(e.g., ‘reverse circulation drilling was recording the total magnetic field in the centre of the
used to obtain 1 m samples from
cloverleaf on each pass, while flying in several different
which 3 kg was pulverised to
directions. This provides a measure of the consistency of the
produce a 30 g charge for fire
readings with the sensor in various orientations. The standard
deviation of the centre readings should be within 2 nT to
assay’). In other cases more
explanation may be required, such indicate that the sensor is performing well, and the drone is
following its flight path accurately.
as where there is coarse gold that
has inherent sampling problems.
The data were treated with several quality control and
Unusual commodities or
processing steps as follows:
mineralisation types (e.g., submarine
Statistics were calculated, recorded, and analysed
nodules) may warrant disclosure of 1.
to provide a quick assessment of the magnitude of magnetic
detailed information.
anomalism of the data.
2.
Appropriate filters and control files were designed
based on their parameters such as flight height, line spacing,
data quality and orientation of the Earth’s magnetic field at
the time of surveying.
3.
A convolution filter was applied to remove ringing
artefacts from levelled data for higher order derivatives. This
was applied with the purpose of smoothing out unnecessary
noise, while preserving magnetic data and retaining
geological information.
4.
From the final processed residual magnetic intensity
data (RMI), the following grids are produced:
a.
First vertical derivative of the residual magnetic
intensity (RMI)_1vd.
Page 6 of 13
Criteria
JORC-Code Explanation
Commentary
b.
Second vertical derivative of the residual magnetic
intensity (RMI_2vd)
c.
(RTP)
The residual magnetic intensity reduced to pole
d.
First vertical derivative of the reduced to pole
(RTP_1vd)
e.
Second vertical derivative of the reduced to pole
(RTP_2vd)
f.
Analytic Signal calculated from the residual
magnetic intensity (AnSig)
g.
Tilt calculated from the residual magnetic intensity
(RMI_TILT)
h.
The horizontal tilt derivative of the residual magnetic
intensity (RMI_TILTHD)
5.
An imagery suite is produced for each grid with a
variety of colour ranges. For example, the RMI is delivered
with the following colour ranges:
a.
Non-linear distribution (histogram equalization)
b.
Non-linear with no shading effects
c.
Non-linear in black and white
d.
Linear distribution
e.
Linear with a 0.5% histogram clip
f.
Linear with a 2 or 5% histogram clip
g.
Linear with no shading effects
h.
Normal distribution
6.
Two custom EarthEx interpreter’s views (iView) that
maximize structural detail while retaining the magnetic
intensity information using hybridized imaging algorithms
using:
a.
The RMI, RMI_1vd and RMI_2vd (iView#1)
b.
The RMI and RMI_TILT (iView #2)
Two inversions were completed for both blocks using VOXI-3Dsusceptibility inversion code. These inversions implemented
one mesh with a cell size of 25x25x12.5 m (X,Y,Z) for the
Gullwing NS block and 10x10x5 m for the Gullwing EW block.
This allowed the entire exMAG data set to be inverted in a
single mesh for each block. The data sets can be further
divided into sub-sets to specific areas of interest to improve
the model resolution in the near-surface for those areas.
The input magnetic data for the inversion is the final RMI grid
for Gullwing project. The input digital elevation model (DEM) is
a provided by the Shuttle Topography Radar mission (SRTM 1
Arc Second) available online, which was used to extend
coverage of the DEM and provide elevation data over the
padding of the inversion mesh.
Page 7 of 13
Criteria
JORC-Code Explanation
Commentary
Inversion parameters were optimized, including error
tolerance, weighting, focussing constraints and detrending of
data.
Drilling
techniques
• No drilling was undertaken
Drill type (e.g., core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (e.g., core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
•No drilling was undertaken
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias may
have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples
• Not applicable, as no drilling has been undertaken.
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
Sub-sampling If core, whether cut or sawn and
techniques and whether quarter, half or all core
sample
taken.
preparation
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
• Not applicable, as no drilling has been undertaken.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Page 8 of 13
Criteria
JORC-Code Explanation
Commentary
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of assay The nature, quality and
• Not applicable, as no drilling has been undertaken.
data and
appropriateness of the assaying and
laboratory tests laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (e.g., standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e., lack of bias)
and precision have been
established.
Verification of
sampling and
assaying
The verification of significant
intersections by either independent
or alternative company personnel.
• Not applicable, as no drilling has been undertaken.
Data is stored in a cloud-based storage system and on
company laptop hard drive.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
Location of
data points
Accuracy and quality of surveys
Navigation was controlled by an integrated GPS
used to locate drill holes (collar and Inertial Measurement System with Magnetic Heading
down-hole surveys), trenches, mine Sensors.
workings and other locations used in The data was collected in UTM WGS 84, zone 34N grid
Mineral Resource estimation.
system, the converted to MGI 1901/ Balkans Zone 6.
Specification of the grid system used. The project topographic surface was generated from
Quality and adequacy of
topographic control.
Data spacing Data spacing for reporting of
and distribution Exploration Results.
a LiDAR survey to an accuracy of approximately
0.05m. It is considered sufficiently accurate for the
Company’s current activities.
Line spacing was 25m, height at ~30m, and 250m tie
line spacing.
Page 9 of 13
Criteria
JORC-Code Explanation
Commentary
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
Whether sample compositing has
been applied.
Orientation of Whether the orientation of sampling The magnetics survey grid was aligned to cross the
data in relation achieves unbiased sampling of
majority of the known structures, stratigraphy and
to geological possible structures and the extent to mineralisation.
structure
which this is known, considering the
deposit type.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
Sample security The measures taken to ensure
sample security.
Audits or
reviews
Not applicable, as no drilling has been undertaken.
The results of any audits or reviews of Not applicable, as no samples has been taken.
sampling techniques and data.
Page 10 of 13
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC-Code Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number,
location and ownership
including agreements or
material issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
The Mavis Lake Lithium Project consists of 1097 unpatented
Single Cell Mining Claims and six separate surface leases
which secure the surface rights of the land required for the
Project footprint.
The security of the tenure held
at the time of reporting along
with any known impediments to
obtaining a licence to operate
in the area.
Exploration
Acknowledgment and
done by other appraisal of exploration by
parties
other parties.
Geology
The Gullwing-Tot/Northern Prospects area consists of 358
individual unpatented Single Cell Mining Claims.
All claims and leases are active and in good standing. The
leases have a term of 21 years and are not set to expire
until 2032, at which time they can be renewed for an
additional 21 years if required.
Previous exploration has been conducted by a number of
parties including Lun-Echo Gold Mines Limited (1956), Selco
Mining Corporation (1979-1980), Tantalum Mining
Corporation of Canada Limited (1981-1982), Emerald Field
Resources (2002), International Lithium Corp (2006-2021)
and Pioneer Resources Limited/Essential Metals Limited
(2018-2021). Power Metals prospecting programs (2018 and
2022)
Deposit type, geological setting The Fairservice and Mavis Lake Prospects host zoned
pegmatites that are prospective for lithium and tantalum
and style of mineralisation.
The Gullwing-Tot area hosts pegmatites that are prospective
for lithium and tantalum.
Drill hole
Information
A summary of all information
material to the understanding
of the exploration results
including a tabulation of the
following information for all
Material drill holes:
No drilling was undertaken
Easting and northing of the drill
hole collar
Elevation or RL (Reduced Level
– elevation above sea level in
metres) of the drill hole collar
Dip and azimuth of the hole
down hole length and
interception depth
hole length.
Page 11 of 13
Criteria
JORC-Code Explanation
Commentary
If the exclusion of this
information is justified on the
basis that the information is not
Material and this exclusion does
not detract from the
understanding of the report, the
Competent Person should
clearly explain why this is the
case.
Data
aggregation
methods
In reporting Exploration Results, No data aggregation was carried out and no
weighting averaging
truncation or top cuts of results were employed.
techniques, maximum and/or
minimum grade truncations
(e.g., cutting of high grades)
and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts
incorporate short lengths of
high-grade results and longer
lengths of low grade results, the
procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are
particularly important in the
The geometry of any mineralized bodies is not known at this
reporting of Exploration Results. stage.
If the geometry of the
mineralisation with respect to
the drill hole angle is known, its
nature should be reported.
If it is not known and only the
down hole lengths are
reported, there should be a
clear statement to this effect
(e.g., ‘down hole length, true
width not known’).
Diagrams
Appropriate maps and sections Refer to images in the main document.
(with scales) and tabulations of
intercepts should be included
for any significant discovery
being reported These should
include, but not be limited to a
plan view of drill hole collar
locations and appropriate
sectional views.
Page 12 of 13
Criteria
JORC-Code Explanation
Balanced
reporting
Where comprehensive
All known and relevant geological data has been
reporting of all Exploration
reported.
Results is not practicable,
representative reporting of both
low and high grades and/or
widths should be practiced to
avoid misleading reporting of
Exploration Results.
Other exploration data, if
All known and relevant data has been reported.
meaningful and material,
should be reported including
(but not limited to): geological
observations; geophysical
survey results; geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test results; bulk
density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
Other
substantive
exploration
data
Further work
Commentary
• Field investigations of the recently identified anomalies
The nature and scale of
planned further work (e.g., tests presented in this report is planned.
for lateral extensions or depth
•Reconnaissance drilling is imperative to confirm
extensions or large-scale stepmodels/investigations and observations with the objective
out drilling).
of detecting bedrock lithium mineralisation.
Page 13 of 13
Share your feedback
Discover