Mavis Lake Exploration Target highlights scale potential
Released
Released
Announcement PDF
ASX Announcement
22 May 2024
Mavis Lake Exploration Target Highlights Potential for LargeScale Lithium Project in North-West Ontario
Highlights
•
New JORC compliant Exploration Target completed for the Mavis Lake Lithium Project.
•
Exploration Target excludes the current Mineral Resource Estimate of 8Mt @ 1.07% Li2O.
•
Exploration Target encompasses extensions to Mavis Lake Main Zone, as well as
introducing the potential of the Gullwing and Tot pegmatites (Northern Prospects).
•
Exploration Target incorporates 24 months of detailed and intensive exploration including
soil sampling, airborne magnetic survey, rock chip and channel sampling, mapping,
structural survey and extensive drill testing.
•
Field teams currently ground-truthing anomalies identified recently from the highresolution aeromagnetic survey.
•
Field teams also planning drill rig access and planning for drilling operations.
•
Drill pads fully permitted.
Lithium exploration and project development company, Critical Resources Limited ASX: CRR
(“Critical Resources” or “the Company”) is pleased to announce a JORC Code 2012 compliant
Exploration Target for the Company’s 100%-owned Mavis Lake Lithium Project (“the Project”), in
Ontario, Canada. The estimated range of potential mineralization is:
18 - 29 million tonnes at 0.8 - 1.2% Li2O* (see Table 1 below)
* The potential quantity and grade of the Exploration Target is conceptual in nature. There has
been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration
will result in the estimation of a Mineral Resource.
Exploration Target Summary
The Exploration Target excludes the current 8.0Mt @ 1.07% Li2O Inferred Mineral Resource Estimate
(MRE).
The Exploration Target is derived from exploration potential at the Mavis Lake Main Zone (where
the current MRE is located) while also introducing the exploration potential of the Northern
Prospects, centered on the Gullwing and Tot pegmatites.
The exploration potential of the entire Mavis Lake Project Area positions the Company with a
pathway to achieve a significant Resource base in North-western Ontario.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
With immediate access to road and rail infrastructure, as well as utilities, services and support from
the nearby city of Dryden, the Mavis Lake Project is positioned to become a key participant in
North America’s rapidly emerging hard rock-based lithium supply chain.
Table 1 provides a summary of the Exploration Target including tonnage and grade ranges of each
key Prospect ready to be drill tested.
Table 1 – Summary of Project Exploration Target
Prospect
Tonnes Range (Mt)
Li2O Range (%)
Minimum
Maximum
Minimum
Maximum
8
14
1
1.2
7
10
0.3
1.2
Tot Exploration Target
3
5
0.8
1.2
Project Exploration Target
18
29
0.8
1.2
Main Zone Extension Exploration
Target
Gullwing Exploration Target
Cautionary statement - The Exploration Target has been prepared and reported in accordance
with the 2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target
is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and
it is uncertain if further exploration will result in the estimation of a Mineral Resource.
Management Comment
Critical Resources Managing Director, Alex Cheeseman, said:
“The completion of this Exploration Target follows two years of intensive exploration and data
collection at Mavis Lake and represents a major milestone for the Project.
“Importantly, this gives shareholders and investors a clear line of sight to the huge potential of the
Project. The Exploration Target is supported by detailed scientific work and a comprehensive
analysis of a range of datasets. It gives us the first definitive picture of the upside potential across
the entire project area, building on the maiden MRE of 8Mt at 1.07% Li2O that we delivered last
year.
“Given the Mavis Lake Project’s proximity to world-class infrastructure and the emerging lithium
battery materials supply chain across North America, we are very excited to be able to quantify
the potential size and scale of the asset for the first time.
“We are also very pleased to have teams back in the field, planning and preparing for a future
drill program and also following up multiple new potential targets. The next step for us will be to
get back to site with drill rigs to convert this Exploration Target into reality!”
Project Area Exploration Target
The Mavis Lake Project Area is a single contiguous claim area, covering a massive ~23,000
hectares. The Project Area has known spodumene-bearing pegmatites throughout its entirety,
many of which are yet to be drill tested.
Page 2 of 17
To date, exploration efforts have focused on the Mavis Lake Main Zone and the Northern
Prospects. These key areas have not yet been explored to the fullest potential and provide
excellent opportunities for significant resource growth. Figure 1 shows the entire project area and
the Prospects for continued Resource growth.
Tot 3-5Mt @ 0.8-1.2% Li2O
Exploration Target
Gullwing 7-10Mt @ 0.3-1.2% Li2O Exploration
Target
Main Zone 8-14Mt @ 1-1.2% Li2O Exploration Target
(exclusive of 8Mt @ 1.07% Li2O Inferred MRE)
Figure 1 - Mavis Lake Project Area with Exploration Targets by Prospect
Main Zone Exploration Potential
The Main Zone hosts an Inferred MRE of 8 million tonnes @ 1.07% Li2O with a pending resource
upgrade following drilling completed from April to November 2023.
The Company anticipates both a resource increase and for a large portion of increased resource
to fall into the upgraded Indicated category (due to tight drill spacing observed throughout the
Main Zone).
The Main Zone remains open and requires further drill testing. In addition to the Main Zone, multiple
spodumene-bearing pegmatite dykes adjacent to the Main Zone have yet to be drill tested or
have had minimal drill testing and present as immediate opportunities to further test and extend
known resource shapes.
Through preliminary modelling with previous mapped outcrops, grab samples, structural
measurements and drilling, an exploration target of the Mavis Lake Main Zone area is 8-14 million
tonnes at 1% to 1.2% Li2O.
This is exclusive of the current MRE of 8Mt @1.07% Li2O.
Page 3 of 17
Figure 2 – Pegmatite wireframes (pink) illustrate further resource potential of the Main Zone both
laterally and at depth.
Northern Prospects Exploration Potential
The Exploration Target for the Northern Prospects is currently limited to only two spodumenebearing pegmatites - Gullwing and Tot1.
The spodumene-bearing Gullwing pegmatite has an exposed width of up to ~80m and exposed
strike length of ~425m and is interpreted to be dipping near vertical. The Gullwing pegmatite has
an exploration target of 7-10 million tonnes within its exposed strike length. The interpreted structure
can be seen in Figure 3.
Previous rock chip sampling has identified very high-grade mineralisation from spodumene, up to
6.78% Li2O (refer to ASX Announcement dated July 16, 2024), however given varying degrees of
fractionation within the pegmatite, a wide-ranging grade target has been applied from 0.3% Li2O
to 1.2% Li2O.
The spodumene-bearing Tot pegmatite has exceptional spodumene mineralisation and an
exposed strike length of ~50m. Recent MMI Soils results (refer to ASX Announcement dated
18 March 2024) provide high confidence of an ~1.25km strike length.
Interpreting historical exploration results, the Tot Pegmatite area has an Exploration Target of
approximately 3-5 million tonnes at 0.8-1.2% Li2O, the interpreted structure can be seen in Figure 4.
1 Recent geophysics results (refer to ASX Announcement dated April 17, 2024) identified a number of additional potential
pegmatite structures across the Northern Prospects. These early stage targets present as an exciting opportunity for
grassroots exploration but the Company does not have sufficient exploration data/results for these targets for them to
be included in this Exploration Target. Successful exploration between the Gullwing and Tot pegmatite may uncover
further pegmatite systems that may add to the Project Exploration Target.
Page 4 of 17
Figure 3 - Wireframe model of Gullwing Pegmatite using outcrop mapping and historical
exploration data
Figure 4 – Wireframe model of Tot Pegmatite using outcrop mapping and
historical exploration data
Summary of Exploration Target Data and Methodology
The Exploration Target is based on interpretation of exploration completed to date (see summary
of ASX releases below) and includes:
• 287 diamond drill holes throughout the entirety of the Mavis Lake Project Area, including:
44,179m of drill data generated by Critical Resources;
6,829m of drilling data generated by other parties; and
9,454m of drill core samples.
• 2,032 samples taken at surface, from bedrock throughout the Mavis Lake Project Area;
Page 5 of 17
•
•
•
•
•
1,346 Mobile Metal Ion (MMI) Soil samples;
Regional and detailed geological mapping;
Airborne magnetics, radiometrics, very-low frequency (VLF) surveys;
Wireframing of inferred resource shapes at the Main Zone; and
Internal 3D geological modeling and wireframing for projection purposes.
The Exploration Target includes the entirety of the Mavis Lake Project Area, but its primary focus is
on known pegmatites that have proven significant lithium mineralisation from spodumene.
Geological modelling and wireframing of the pegmatites included in the exploration model
derived from inferred resource shapes, outcropping pegmatites including structural measurements
and detailed geological interpretations.
Tonnage was estimated by calculating the volume of the wireframes and multiplying by a density
of 2.7 tonnes/m3. The weighted average grade was calculated from lithium assays from previous
drilling and geochemical samples from the outcropping pegmatites at surface.
The technical details outlined in this announcement have been previously disclosed to the market
through releases dated:
20th December 2022 - Strategic acquisition increases Mavis Lake Lithium Project footprint 324%;
5th May 2023 - 8.0Mt at 1.07% Li2O Maiden Mineral Resource at Mavis Lake;
27th June 2023 – Strong assay results sets path for Resource upgrade at Mavis Lake Project;
16th July 2023 - Rock chips up to 3.2% Li2O at Gullwing and Tot Prospects;
24 July 2023 – Assay results confirm 74.4m at 1.18% Li2O at Mavis Lake;
21 August 2023 – High-grade intercepts extend recently discovered “Swell Zone” at Mavis Lake;
19 September 2023 – Exceptional results with 65.45m up to 1.39% Li2O and 50.2m at 1.28% Li2O;
19 October 2023 – Outstanding assays extend the Mavis Lake Swell Zone:
2nd November 2023 - District Scale Potential at Mavis Lake Northern Prospects;
15 November 2023 - Assay results extend Swell Zone - starting from surface and extending over
1km in Strike;
• 13th February 2024 - Strong assay results continue to extend Mavis Lake;
• 18th March 2024 - 1.25km Lithium Trend at Tot confirms district-scale at Mavis Lake; and
• 17th April 2024 - 8km of highly prospective anomalies identified at Gullwing and Tot.
•
•
•
•
•
•
•
•
•
•
Future Work
The 2024 summer field programs have recently commenced and are designed with the primary
objective of testing and supporting the Exploration Target, with a secondary objective to provide
the information necessary to plan the Company’s next drilling campaign.
Numerous spodumene-bearing pegmatites have yet to be drill tested. These pegmatites include
the Northern Zone’s Gullwing and Tot pegmatite areas and a number of pegmatites proximal to
the Mavis Lake Main Zone.
Exploratory drilling is likely to commence in H2 CY2024, targeting multiple spodumene-bearing
pegmatites including Tot, Gullwing, Pegmatites 11, 18, and 19 (adjacent to the Main Zone), as well
as extensions (laterally and at depth) to the Main Zone. These drilling targets are all within the
defined Exploration Target.
The primary objective of the Company’s next drilling campaign is twofold.
Page 6 of 17
Firstly, exploration style drilling will enhance the understanding of known pegmatite thickness,
trends, mineralization and structural relationships.
Secondly, drilling will focus on resource definition and resource expansion employing appropriate
drill spacing for Inferred and/or Indicated classification. Future drilling requirements to test the
Exploration Target can be seen in Table 2.
The Company is currently considering a 10,000–15,000-meter drilling program for H2 CY2024.
Subsequent drilling (total meterage and timeline) will be influenced by the results of this next drilling
program. It is feasible that the entirety of the work required to test the Exploration Target could be
achieved by H2 CY2025.
Table 2: Exploration Target Proposed Drilling Program
Estimated Drill
Meters
(Inferred category)
Minimum
Maximum
Minimum
Maximum
5,600-10,000
8
14
1
1.2
7,800-13,000
7
10
0.3
1.2
Tot Exploration Target
7,600-12,000
3
5
0.8
1.2
Project Exploration Target
N/A
18
29
0.8
1.2
Prospect
Main Zone Extension
Exploration Target
Gullwing Exploration Target
Tonnes Range (Mt)
Li2O Range (%)
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada
which are ideally positioned to participate in the rapidly growing North American battery materials supply chain.
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPETENT PERSONS STATEMENT The information in this ASX Announcement that relates to Exploration Results and the
Exploration Target is based on information compiled by Mr. Troy Gallik (P. Geo), a Competent Person who is a Member
of the Association of Professional Geoscientists of Ontario. Troy Gallik is a full-time employee of Critical Resources. Mr.
Gallik has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Gallik consents to
the inclusion in this Announcement of the matters based on his information in the form and context in which it appears.
This information in this ASX Announcement regarding that relates to the Mavis Lake Mineral Resource Estimate is
extracted from ASX market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code
and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new
Page 7 of 17
information or data that materially affects the information included in any original announcement and that all material
assumptions and technical parameters underpinning the estimates in the original market announcement continue to
apply and have not materially changed.
JORC Classification
Inferred
Total*
Li2O Cut-Off grade (%)
0.3
Inferred
Tonnage (Mt)
8.0
8.0
Li2O (%)
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by
inverse distance weighting. Classification is according to JORC Code Mineral Resource categories. Refer to
ASX announcement 5 May 2023, 8.0 Mt at 1.07% Li2O Maiden Mineral Resource at Mavis Lake.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Page 8 of 17
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling Diamond Drill Holes
(e.g., cut channels, random
•Oriented NQ core was cut in half using a diamond saw,
chips, or specific specialised
with a half core sent for assay and half core retained.
industry standard measurement
tools appropriate to the
•No other measurement tools other than directional survey
minerals under investigation,
tools have been used in the holes at this stage.
such as down hole gamma
• Oriented core was placed V-rail and a consistent cut-line
sondes, or handheld XRF
drawn along core to ensure cutting (halving) of
instruments, etc). These
examples should not be taken representative samples.
as limiting the broad meaning
of sampling.
• Sampling is conducted based on core logging, 100% of
drill hole core is logged. The core logger is a geologist, has
experience in lithium mineralisation, and determines the
intervals of samples. All pegmatite intersections are
Include reference to measures sampled regardless of the visual presence of lithium
minerals/spodumene. Host rock is typically not sampled as
taken to ensure sample
lithium mineralisation is localized to pegmatites
representivity and the
appropriate calibration of any (spodumene mineral) or their alteration halos (holmquistite
measurement tools or systems mineral) within mafic volcanic host rock.
used.
• Determination of mineralisation has been based on
Aspects of the determination of geological logging and photo analysis.
mineralisation that are Material
• Diamond Core drilling was used to obtain 3m length
to the Public Report. In cases
where ‘industry standard’ work samples from the barrel which are then marked in one
metre intervals based on the drillers core block
has been done this would be
relatively simple (e.g., ‘reverse measurement.
circulation drilling was used to
• Assay samples are selected based on geological logging
obtain 1 m samples from which
boundaries or on the nominal metre marks.
3 kg was pulverised to produce
a 30 g charge for fire assay’). In • Samples were dispatched to an accredited laboratory
other cases more explanation (ActLabs) in Dryden, Ontario, Canada for sample
may be required, such as
preparation and shipment to analysis.
where there is coarse gold that
Bedrock Grab Samples
has inherent sampling
problems. Unusual commodities
• Sampling was conducted on the surface of exposed
or mineralisation types (e.g.,
outcrops or float rocks via pick, hammer, or another
submarine nodules) may
handheld tool.
warrant disclosure of detailed
information.
• Samples only represent a direct point on the surface and
may not be representative to the entire rock body.
• All rock samples collected were shipped to AGAT
Laboratories in Thunder Bay, ON, for trace and rare earth
elements by sodium peroxide fusion ICP-OES/ICP-MS 58
elements. The Company submitted standards and blanks
while AGAT also provided internal lab QAQC.
• All grab samples are located in Table 1 with NAD83 15N
coordinates.
Page 9 of 17
Criteria
JORC-Code Explanation
Commentary
Soils Samples
• Soils were taken at 40-50cm below the O-A soil horizon
• A total of 1356 samples were taken
• Sample spacing ranges from 25m, 50m and 100m
• Each Individual sample was ~500g
Drilling
techniques
• NQ2 diamond double tube coring by Cyr EF-50 rig was
Drill type (e.g., core, reverse
circulation, open-hole hammer, used throughout the hole.
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g.,
core diameter, triple or
• Core orientation was carried out by the drilling
standard tube, depth of
contractor.
diamond tails, face-sampling
bit or other type, whether core
is oriented and if so, by what
method, etc).
Drill sample
recovery
• Lithological logging, photography
Method of recording and
assessing core and chip sample
• Core samples were measured with a standard tape
recoveries and results assessed.
within the core trays. Length of core was then compared to
the interval drilled, and any core loss was attributed to
individual rock units based on the amount of fracturing,
abrasion of core contacts, and the conservative judgment
of the core logger. Results of core loss are discussed below.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Experienced driller contracted to carry out drilling.
•In broken ground the driller produced NQ core from short
runs to maximise core recovery.
• Core was washed before placing in the core trays.
• Core was visually assessed by professional geologists
before cutting to ensure representative sampling.
Whether a relationship exists
• See “Aspects of the determination of mineralisation that
between sample recovery and are Material to the Public Report” above.
grade and whether sample
bias may have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
Page 10 of 17
Criteria
JORC-Code Explanation
Commentary
The total length and
percentage of the relevant
intersections logged.
Diamond Drilling
• Core samples were not geotechnically logged.
• Core samples have been geologically logged to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• The core logging was qualitative in nature.
• All core was photographed
Bedrock and Soil Samples
• Sample site description and basic nature of the
sample medium was routinely collected and at times
photographed for reference.
Sub-sampling If core, whether cut or sawn
Diamond Drilling
techniques and and whether quarter, half or all •Oriented core was placed V-rail and a consistent cut-line
sample
core taken.
drawn along core to ensure cutting (halving) of
preparation
representative samples
If non-core, whether riffled,
tube sampled, rotary split, etc •Oriented NQ core was cut in half using a diamond saw,
and whether sampled wet or
with half core sent for assay and half core retained.
dry.
•Core sample intervals were based in logged mineralisation
For all sample types, the nature, •No duplicates or second half-sampling
quality and appropriateness of
• Appropriate method: oriented NQ core cut in half using a
the sample preparation
diamond saw, with a half core sent for assay and half core
technique.
retained
Soil Samples
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
• All samples were prepared and Analysed by SGS
Laboratory, Lakefield, Ontario
• Sample protocols were followed according to SGS
guidelines
Measures taken to ensure that
the sampling is representative
of the in situ material collected,
including for instance results for
field duplicate/second-half
sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Quality of assay The nature, quality and
Diamond Drilling
data and
appropriateness of the assaying • Assays methods appropriate for style of mineralisation will
laboratory tests and laboratory procedures
be used: UT-7 (Li up to 5%) QOP Sodium Peroxide (Sodium
used and whether the
Peroxide Fusion ICPOES + ICPMS.
technique is considered partial • Either standards or blanks are inserted every 10th sample
or total.
interval as a part of a QAQC process. Standard and blank
Page 11 of 17
Criteria
JORC-Code Explanation
Commentary
results from recent drilling are within acceptable margins of
For geophysical tools,
spectrometers, handheld XRF error.
• Activation Laboratory performs internal QA/QC
instruments, etc, the
parameters used in determining measures. Results are released once all internal QA/QC is
verified and confirmed to be acceptable.
the analysis including
instrument make and model,
Bedrock Grab Samples
reading times, calibrations
•All rock samples collected were shipped to AGAT
factors applied and their
Laboratories in Thunder Bay, ON, Canada
derivation, etc.
• Samples were analysed for trace and rare earth elements
Nature of quality control
by sodium peroxide fusion ICP-OES/ICP-MS 58 elements.
procedures adopted (e.g.,
• The Company submitted standards and blanks while
standards, blanks, duplicates,
AGAT also provided internal lab QAQC
external laboratory checks)
and whether acceptable levels
Soil Samples
of accuracy (i.e., lack of bias)
• Samples were prepared and analysed at SGS Laboratory
and precision have been
at Lakefield, Ontario
established.
• SGS applied industry best practice for QAQC
•SGS employed internal standards and checks as part of
the analytical process as per standard industry practises
Verification of
sampling and
assaying
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
Diamond Drilling
• No independent verification completed at this stage.
• No holes are twins of previous holes.
• Core measured, photographed and logged by
geologists. Digitally recorded plus back-up records.
•No adjustments to the assay data.
Documentation of primary
data, data entry procedures, • No assay cut off grades are applied.
data verification, data storage Bedrock Grab Samples
(physical and electronic)
• No independent verification completed at this stage.
protocols.
• All assay results are provided.
Discuss any adjustment to assay
• No adjustments to the assay data.
data.
• No assay cut off grades are applied.
• The data regarding sampling location and sample
information is stored in tabular format and is appended to
this report.
Soil Samples
• MMI Soil data was checked by Critical Resources
personnel and checked by a third party (Coast Mountain
Geological Consulting).
• All data received from the laboratory and securely stored
in digital format the Company’s database.
Location of
data points
Accuracy and quality of
Diamond Drill Core
surveys used to locate drill holes • Drill collars recorded with Garmin GPS that has an
(collar and down-hole surveys), accuracy in the order of ±3 metres for location. A
trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system
used.
Page 12 of 17
Criteria
JORC-Code Explanation
Commentary
Quality and adequacy of
topographic control.
registered surveyor will be contracted to accurately survey
all drill collars at completed of drill program.
• WGS 1984 UTM Zone 15N.
• No specific topography survey has been completed over
the project area.
Bedrock Grab Samples
• Samples were recorded with Garmin GPS that has an
accuracy in the order of ±3 metres for location.
• WGS 1984 UTM Zone 15N.
• No specific topography survey has been completed over
the project area.
Soil Samples
• Soil sample sites were located by handheld Garmin
GPS 64s accurate to +/- 3m. This is adequate for the
type of exploration program.
• All location data are recorded and reported in WGS 1984
Zone 15N
Data spacing Data spacing for reporting of
and distribution Exploration Results.
Diamond Drilling
•Core sample intervals were based in logged mineralisation
and no sample composting applied. Reporting of final
Whether the data spacing, and results includes many weighted average- composting of
assay data.
distribution is sufficient to
establish the degree of
geological and grade
Bedrock Grab Samples
continuity appropriate for the
• The samples are considered random taken directly from
Mineral Resource and Ore
outcropping spodumene-bearing pegmatite.
Reserve estimation
procedure(s) and classifications • The data spacing, and distribution are not sufficient to
applied.
establish the degree of geological and grade continuity.
Whether sample compositing
has been applied.
Soil Samples
• All sampling was carried out on a grid spacing of 100m
x 25m, or 50m, or 100m, which is considered appropriate for
this style of early project evaluation.
• The data is not being used for the purpose of
resource/reserve calculations.
• No sample compositing was undertaken. Results includes
many weighted average- composting of assay data.
Orientation of Whether the orientation of
Diamond Drilling
data in relation sampling achieves unbiased
• The orientation of the mineralisation is unknown. The
to geological sampling of possible structures drilling program is aimed at determining orientation of th
Share your feedback
Discover