Hillgrove South Antimony Sampling & Silver Geological Review
Released
Released
Announcement PDF
ASX Announcement
4 December 2024
Hillgrove South Antimony Samples Return Over Detection
Limit, Further Testing Underway & Geological Review
Identifies Exceptionally High Grade Silver at Halls Peak
Highlights
Mayview Antimony-Gold Prospect
•
ALS Laboratories has advised that recent Hillgrove South antimony samples sent for
assaying have returned results in excess of the upper detection limit (>10,000ppm) of the
assay method selected. Pending assays will be delayed by approximately two weeks
whilst further specialised tests for antimony (Sb) are conducted
•
19 Samples from the recent fieldwork program at the Mayview Prospect (located within
the Hillgrove South property) have been sent to ALS laboratories in mid-November for
assaying. Multiple historic antimony workings comprising pits/shafts and trenches have
been mapped and sampled
•
The Hillgrove South property, which is part of the broader 981 km2 Halls Peak Project, is
contiguous to the southern and southeastern boundaries of Larvotto Resources Ltd’s
(“LRV”) Hillgrove Antimony-Gold Project. The Mayview Antimony Prospect is situated
~2.7km east and contiguous to LRV’s Hillgrove Antimony-Gold Project
•
The Company will continue to expediate its exploration strategy seeking to identify
Hillgrove-style gold-antimony systems at Halls Peak in light of China’s recent antimony
ban to the U.S.1
Halls Peak Ag Desktop Study
•
Desktop study incorporating historical exploration work within the greater Halls Peak
Project has identified exceptionally high grade silver intercepted in previous drilling
including 3,780 grams per tonne, over 1.15m downhole in drill hole DDHA6
•
More than 130 drill core samples have returned silver assays greater than 100 grams per
tonne and 10 samples exceed 940 grams per tonne silver
•
Halls Peak Inferred Mineral Resource of 840,000 tonnes of 30 grams per tonne silver and
significant potential for resource expansion
•
Historical drilling also highlighted the presence of high-grade silver in black shales
indicating the potential to discover black shale-hosted silver mineralisation at Halls Peak
•
Results of field work programs will feed into the generation of further exploration and new
drilling programs planned for 2025
Critical minerals exploration and project development company Critical Resources Limited
ASX:CRR (“Critical Resources”, “CRR” or “the Company”) is pleased to provide an update of the
Company’s Mayview field work program results and recent studies on the exceptionally high
grade silver values discovered during a geological review on past drilling campaigns at the
Gibsons Project within CRR’s 100% owned broader Halls Peak Project.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
Nineteen samples from CRR’s Hillgrove South prospect field work campaign were dispatched to
ALS laboratories mid-November for express assaying. The Company has been informed there will
be a delay in receiving these as some results are in excess of the upper detection limit (10,000ppm
Sb) for antimony of the selected assay method ME-MS61. The Company expects to now receive
the result within the next 2 weeks.
This Gibsons Project is part of the Company’s considerable Halls Peak Project’s footprint (Figure 5)
located south-east of Armidale, New South Wales, covering an area of about 982km2 in the highly
prospective New England Fold Belt, that includes antimony, silver, gold, copper, zinc and lead.
This report outlines the significant findings of diamond drilling programs conducted under
Exploration Licence 4474, which is held by the Company at the Gibsons Open Cut project, located
in the Halls Peak area, New South Wales (NSW). The primary objective of these drilling campaigns
has been to identify and quantify high base metal and silver values within the project area.
Silver is a precious metal, however the majority of silver is used for industrial purposes, especially in
the expanding manufacturing of photovoltaic solar cells. Silver is currently US$30.47 per ounce (UBS
27 Nov. 2024), 30% above the 2024 average of US$23.40 per ounce.
The extensive exploration and drilling activities at the Gibsons Open Cut project have successfully
identified significant high silver values, alongside other valuable minerals.
This report highlights the substantial progress made in understanding the mineral potential of the
Gibsons Open Cut project and sets the stage for future exploitation and development
opportunities in the Halls Peak area.
High Silver Values
• More than 130 drill core samples have silver assays greater than 100g/t.
•
Of these, 10 samples exceed 940 grams per tonne (30 ounces per tonne) silver (Table 1)
including:
-
3,780 g/t (121.5 ounces per tonne) silver over 1.15m downhole in drill hole DDHA6
-
1,900 g/t (61.1 ounces per tonne) silver over 1.38m downhole in drill hole PMR027
-
1,750 g/t (56.3 ounces per tonne) silver over 1.6m downhole in drill hole PMR027
Hole ID
CRR21DD_04
DDHA6
PMR027
CRR21DD_01
SG03
CRR21DD_04
SG03
SG03
CRRDD_14
CRR21DD_01
From (m)
150.6
17.37
62.5
102.6
14.15
77.65
9.9
12.88
261.5
10.75
Interval (m)
1.38
1.15
1.6
1.24
0.85
0.45
0.85
1.27
2
0.85
Silver Assay (g/t)
>1,500
3,780
1,900
1,750
1,180
1,165
1,150
1,145
1,085
945
Silver Ounces
>48.2
121.5
61.1
56.3
37.9
37.5
37.0
36.8
34.9
30.4
Table 1: Significant Silver values from Halls Peak drill campaigns. CRR21DD_04 was an overlimit and was not
retested.
Page 2 of 17
•
Up to 9 mineralised horizons have been identified at the Gibsons Project, all have sections
with high silver (>100g/t Ag) assays.
•
Three of these horizons contain zones with exceptionally high (>900ppm, Table 1) grade
silver (see figure 2).
•
The lowest of the three lodes is characterised by low base metal values, silver being present
in the mineral tetrahedrite, which is disseminated throughout an intensely altered and
deformed black shale unit, rather than being associated with massive base metal sulphide
horizons.
•
High silver values also characterise the near-surface parts of the lodes, possibly owing to
supergene enrichment.
The occurrence and distribution of high silver values in the Gibsons Open Cut deposit is illustrated
in cross sections, which are located in the surface plan of the area (Figures 1, 2 & 3), below.
Black Shale Hosted Mineralisation
The drilling has discovered a new type of silver-rich mineralisation up to 1,900 grams per tonne at
Halls Peak. The presence of high grade silver in altered and deformed black shales distinct from
the high grade silver in the Zn-Pb-Cu massive sulphide lodes, e.g. drill hole PMR027 intercepted
1.6m downhole of black shale with 1,900 g/t (61.1 ounces per tonne) silver and very low base
metals.
This discovery indicates there is potential for black shale-hosted silver mineralisation.
Drilling Campaigns
The Gibsons Open Cut project has seen extensive exploration efforts spanning several decades. A
total of 6,921 metres of drilling has been completed across 47 holes in various campaigns from
1969 until the most recent efforts in 2023. The following details provide an overview of the drilling
activities:
•
Initial Campaigns: Early drilling efforts commenced in 1969 by Allstate Exploration, focusing
on identifying the mineral potential of the Gibsons Open Cut area.
•
Subsequent Campaigns: Continued exploration activities took place periodically by
Precious Metal Resources and Sovereign Gold Ltd, building a comprehensive geological
understanding of the site.
•
Recent Campaign by CRR (2021-2023): The latest campaign conducted by Critical
Resources Limited from 2021 until 2023, aimed to further delineate the mineral resources and
confirmed the presence of high silver values.
The drill holes interrogated to identify high grade silver intercepts are detailed in the JORC 2012
tables appended. The resource estimate based on this suite of drill holes was presented in CRR ASX
release of 30 June 2023 Maiden Mineral Resource Estimate for the Halls Peak Zn-Pb-Cu-Ag-Au
Project based on a JORC 2012 report produced by: Principal Consultant and Managing Director,
H&S Consultants Pty. Ltd., A. Van der Heyden 2023. Halls Peak Mineral Resource Estimate – April
2023, H&S Consultants Pty. Ltd.
Page 3 of 17
Figure 1: Cross section illustrating the occurrence and distribution of high silver values in the Gibsons Open Cut deposit. High (>100ppm silver) grade silver
zones are identified by silver coloured ellipses within the brown stacked massive sulphide lodes (Zn-Pb-Zn).
Page 4 of 17
Figure 2: Cross section illustrating the occurrence and distribution three silver-rich lodes (>100ppm silver) within the Gibsons Open Cut deposit.
Page 5 of 17
Figure 3: Surface plan of the Gibsons Open Cut deposit showing locations of the crosssections.
Page 6 of 17
Figure 4: Location of Gibsons Open Cut prospect and other base and precious metal mines within EL4474.
Figure 5: Halls Peak Project Location map showing proximity to significant Antimony-Gold projects in the
region.
Page 7 of 17
References
1. “China bans export of key minerals to U.S. as trade frictions escalate”, By A.Lv and
T.Munroe; Reuters 3 December 2024 (
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact;
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future. The Company’s Mavis Lake Lithium Project in Ontario, Canada,
where it has completed over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07%
Li2O. Recent exploration success has demonstrated substantial potential to expand this resource and make new
discoveries in the surrounding area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource
growth in parallel with multiple permitting and project development workstreams.
The Company’s Hall Peak Base Metals Project is located 87km south-east of Armidale New South Wales, Australia, a
reginal hub in New South Wales. The Company has defined a maiden Inferred Mineral Resource of 884,000t grading
3.7% zinc, 1.5% lead, 0.4% Copper, 30ppm Silver and 0.1ppm Gold has been estimated following numerous drilling
campaigns. Modelling has shown that mineralisation is still open along strike to the east/north-east and west/southwest, providing immediate potential to increase the MRE with follow-up drilling.
COMPETENT PERSON, COMPLIANCE STATEMENT The information in this ASX Announcement that relates to Exploration
Results is based on information compiled by Mr Michael Leu, a Competent Person who is a member of Australian
Institute of Geoscientist (AIG) and the Australian Institute of Mining and Metallurgy (AusIMM) and a consultant of Critical
Resources. Mr Leu has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Leu consents to
the inclusion in this Announcement of the matters based on his information in the form and context in which it appears.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from
ASX market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available
for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
Halls Peak Project
Zn Cut-Off
Tonnage
JORC
Zn (%)
Pb (%)
Cu (%)
Ag ppm
Au pm
SG (calc)
grade (%)
(Mt)
Classification
Inferred
2.0
0.84
3.7
1.5
0.44
30
0.1
2.80
Total*
Inferred
0.84
3.7
1.5
0.44
30
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated
block model, with blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to ASX
announcement 30 June 2024.
This announcement contains information on the Halls Peak Project extracted from ASX market announcements dated
22 November 2021, 30 June 2023, 28 August 2024, 12 September 2024 and 3 October 2024 and 8 November 2024
reported in accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the information included
in any original ASX market announcement.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Page 8 of 17
JORC Code, 2012 Edition – Table 1
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling Allstate Exploration Diamond Drilling, 1969-1970
• Core stored by the Geological Survey of N.S.W. at WB
(e.g., cut channels, random
Clarke Geoscience Centre Londonderry Core Library
chips, or specific specialised
was
re-sampled.
industry standard measurement
• 1,120metres from 14 drill holes .
tools appropriate to the
minerals under investigation,
• Complete core and half core were halved using a
such as down hole gamma
diamond saw, with a half core from complete core and
sondes, or handheld XRF
quarter core from half core sent for assay and
instruments, etc). These
remainder core retained.
examples should not be taken
Precious Metal Resources Limited diamond drilling, 2014
as limiting the broad meaning
• 382metres from 5 holes
of sampling.
• Oriented HQ core was cut in half using a diamond
saw, with a half core sent for assay and half core
retained.
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
Sovereign Gold Limited diamond drilling, 2016
• 637metres from 6 holes
• Oriented HQ core was cut in half using a diamond
saw, with a half core sent for assay and half core
retained.
Critical Resources Limited diamond drilling, 2021- 2022
Aspects of the determination of • 4,782metres from 22 holes
mineralisation that are Material • Diamond Core drilling, NQ size, was used to recover
core in a 3m length barrel. The core is placed in 1m core
to the Public Report. In cases
trays with the drillers' core blocks indicating depth
where ‘industry standard’ work
measurement,
drilled length and core recovered. Core
has been done this would be
trays
are
then
marked
up in 1 metre lengths based on
relatively simple (e.g., ‘reverse
the driller's blocks.
circulation drilling was used to
• Oriented core was placed on a V-rail and fitted
obtain 1 m samples from which
together; a consistent cut-line was drawn along the
3 kg was pulverised to produce
core to ensure cutting (halving) of representative
a 30 g charge for fire assay’). In
samples.
other cases more explanation • Oriented core was cut in halves using a diamond saw;
one half of the core was sent for assay and the other half
may be required, such as
retained.
where there is coarse gold that
• Core sample intervals were based on geological logging
has inherent sampling
and the occurrence of visible mineralisation.
problems. Unusual commodities
• High resolution, scaled photographs were taken of the
or mineralisation types (e.g.,
core as a physical record for later analysis.
submarine nodules) may
• No other measurement tools other than
warrant disclosure of detailed
directional survey tools have been used in the
information.
holes at this stage.
Samples were dispatched to an accredited laboratory (ALS)
in Brisbane, Australia for sample preparation and analysis.
Page 9 of 17
Criteria
JORC-Code Explanation
Commentary
Drilling
techniques
Diamond drill core was recovered in all drilling campaigns,
Drill type (e.g., core, reverse
circulation, open-hole hammer, refer to above.
rotary air blast, auger, Bangka,
Critical Resources Limited diamond drilling, 2021- 2022 NQ2
sonic, etc) and details (e.g.,
diamond
double tube coring by Sandvik DE710 rig was used
core diameter, triple or
throughout
the program.
standard tube, depth of
diamond tails, face-sampling
bit or other type, whether core
is oriented and if so, by what
method, etc).
Drill sample
recovery
Method of recording and
Lithological logging, photography
assessing core and chip sample
recoveries and results assessed.
Core samples were measured with a standard tape within
the core trays. Length of core was then compared to the
interval drilled, and any core loss was attributed to individual
rock units based on the amount of fracturing, abrasion of
core contacts, and the conservative judgment of the core
logger.
Measures taken to maximise
Results of core loss are discussed below.
sample recovery and ensure
representative nature of the
Experienced driller contracted to carry out drilling.
samples.
In broken ground the driller produced NQ core from short
runs to maximise core recovery.
Core was washed before placing in the core trays.
Whether a relationship exists
between sample recovery and Core was assessed by eye before cutting to ensure
grade and whether sample
representative sampling.
bias may have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
Core samples were not geotechnically logged.
Core samples have been geologically logged to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
The core logging was qualitative in nature, recording
features such as lithology, structure, oxidation and
alteration and sulphide mineralisation. The orientation of
planar features such as bedding and cleavage was
determined and recorded where possible.
Page 10 of 17
Criteria
JORC-Code Explanation
Commentary
The total length and
percentage of the relevant
intersections logged.
All core was photographed
100% of the relevant intersections were logged.
Sub-sampling If core, whether cut or sawn
Oriented core was placed V-rail and a consistent cut-line
techniques and and whether quarter, half or all drawn along core to ensure cutting (halving) of
sample
core taken.
representative samples
preparation
If non-core, whether riffled,
tube sampled, rotary split, etc
and whether sampled wet or
dry.
Oriented HQ or NQ core was cut in half using a diamond saw,
with a half core sent for assay and half core retained.
For all sample types, the nature, Core sample intervals were based in logged mineralisation
quality and appropriateness of
the sample preparation
No duplicates or second half-sampling
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in situ material collected,
including for instance results for
field duplicate/second-half
sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Assays methods appropriate for style of mineralisation: MEQuality of assay The nature, quality and
data and
appropriateness of the assaying MS61 0.25g sample for 48 Elements and Gold by method AuAA25 30g sample. Samples have been sent to accredited
laboratory tests and laboratory procedures
Australian Laboratory Services (ALS)
used and whether the
technique is considered partial
or total.
ALS conducted appropriate quality assurance according to
Australian Standards. ALS issued QC Certificates for each
batch of samples assayed. This included control procedures
For geophysical tools,
spectrometers, handheld XRF adopted viz: standards, blanks and duplicate assays.
instruments, etc, the
parameters used in determining Variations were within acceptable limits. Acceptable levels
the analysis including
of accuracy and precision were confirmed.
instrument make and model,
reading times, calibrations
Page 11 of 17
Criteria
JORC-Code Explanation
Commentary
factors applied and their
derivation, etc.
Nature of quality control
procedures adopted (e.g.,
standards, blanks, duplicates,
external laboratory checks)
and whether acceptable levels
of accuracy (i.e., lack of bias)
and precision have been
established.
Verification of
sampling and
assaying
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
No independent verification completed at this stage
Hole CRR21DD_01 was drilled to twin hole SG_03. It confirmed
the occurrence and tenor of the mineralisation encountered
in SG_03.
Documentation of primary
data, data entry procedures, Core measured, photographed and logged by geologists.
data verification, data storage Digitally recorded plus back-up records.
(physical and electronic)
protocols.
Assay data presented in this report
Discuss any adjustment to assay
data.
Location of
data points
Accuracy and quality of
The CRR hole collars were picked up by a registered surveyor
surveys used to locate drill holes at the completion of the drill program.
(collar and down-hole surveys),
trenches, mine workings and
Historical drill holes were located using old maps and/or tape
other locations used in Mineral
and compass surveys. The collar elevation of these holes was
Resource estimation.
derived by projecting them onto the current topographic
Specification of the grid system surface. The accuracy of the old hole collars is estimated to
used.
be within 1-5m.
Quality and adequacy of
topographic control.
MGA94 (Zone 56)
Topographic control based on Department of Lands digital
terrain model.
Data spacing Data spacing for reporting of
and distribution Exploration Results.
Not relevant to current drilling.
Whether the data spacing, and
Core sample intervals were based in logged mineralisation
distribution is sufficient to
and no sample composting applied. Reporting of final results
establish the degree of
includes many weighted average- composting of assay data.
geological and grade
continuity appropriate for the
Mineral Resource and Ore
Reserve estimation
procedure(s) and classifications
applied.
Page 12 of 17
Criteria
JORC-Code Explanation
Commentary
Whether sample compositing
has been applied.
Orientation of Whether the orientation of
The orientation of the mineralisation is unknown. The drilling
data in relation sampling achieves unbiased
program is aimed at determining orientation of the base of
to geological sampling of possible structures mineralisation by drilling three holes.
structure
and the extent to which this is
known, considering the deposit
It is uncertain whether sampling bias has been introduced,
type.
or whether the thickness drilled is a true thickness.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and
reported if material.
Sample security The measures taken to ensure
sample security.
Audits or
reviews
Core samples were stored at the Gibsons core yard before
express overnight freight to Australian Laboratory Services Pty.
Ltd. (ALS) Brisbane. Sample movements and security
documented by ALS Chain of Custody.
The results of any audits or
No independent audits or reviews have been undertaken
reviews of sampling techniques on this Mineral Resource Estimate
and data.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC-Code Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number,
location and ownership
The Hall Peak Project comprises granted Exploration Licences
including agreements or
EL4474, EL7679, EL9293, EL9428, EL9429 and EL9430 located in
material issues with third parties north-eastern NSW and covering an area of about 982km2.
such as joint ventures,
There are no known impediments to operate in the key areas of
partnerships, overriding
interest within the tenements
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
The security of the tenure held Tenure is current and in good standing
at the time of reporting along
with any known impediments to
obtaining a licence to operate
in the area.
Page 13 of 17
Criteria
JORC-Code Explanation
Exploration
Acknowledgment and
done by other appraisal of exploration by
parties
other parties
Geology
Commentary
Exploration for base metals and gold have been conducted at
Halls Peak since 1896 when massive sulphide deposits were
discovered by prospectors. There was some small-scale mining of
deposits of copper, lead, zinc and silver ore on the east side of the
Chandler River until 1916. According to Report 52 – The Geological
Survey of New South Wales “In 1965, 1,600 tons of ore were mined
to give 263 tons of lead, 450 tons of zinc, 46.3 tons of copper and
12523 oz of silver”. Following this several exploration campaigns
were conducted until the mid-1980’s for massive sulphides and
silver by major mining companies such as BHP Co. Ltd., Mt. Isa
Mines Ltd., The Zinc Corporation Ltd., Halls Peak Australia Limited
and Allstate Exploration N.L. but most work was hindered as none
were able to secure tenure to the whole area. All of these work
programs comprising drilling, geochemistry and geophysics have
resulted in an immense body of data.
Deposit type, geological setting Halls Peak is in the southern part of the New England Orogen, a
belt of continental crust uplifted to form a mountainous region.
and style of mineralisation.
Mineralisation is hosted in the Permian Halls Peak Volcanics, a
sequence of felsic volcanic, volcaniclastic and sedimentary
rocks that have been deformed and metamorphosed due to
their formation in a rift setting. Sulphide mineralisation is
stratiform with several massive sulphide bodies within broad
zones of disseminated and stockwork sulphides. Massive
sulphide bodies are generally moderate to steeply dipping and
up to tens of metres across. The massive sulphides are often
associated with sulphidic shale and siltstone within zones of
stockwork and disseminated sulphides in sericite-quartz altered
rocks. Sulphide mineralisation is dominated by sphalerite and
galena, with minor amounts of chalcopyrite, pyrite and
tetrahedrite. The key metals in relative order of abundance are
Cu, Pb, Zn, Ag and Au.
Page 14 of 17
Criteria
JORC-Code Explanation
Drill hole
Information
A summary of all information
material to the understanding
of the exploration results
including a tabulation of the
following information for all
Material drill holes:
Commentary
Easting and northing of the drill
hole collar
Elevation or RL (Reduced Level
– elevation above sea level in
metres) of the drill hole collar
Dip and azimuth of the hole
down hole length and
interception depth
hole length.
If the exclusion of this
information is justified on the
basis that the information is not
Material and this exclusion does
not detract from the
understanding of the report,
the Competent Person should
clearly explain why this is the
case.
Data
aggregation
methods
In reporting Exploration Results, Exploration results are not being reported
weighting averaging
techniques, maximum and/or
minimum grade truncations
(e.g., cutting of high grades)
and cut-off grades are usually
Material and should be stated.
Page 15 of 17
Criteria
JORC-Code Explanation
Commentary
Where aggregate intercepts
incorporate short lengths of
high-grade results and longer
lengths of low grade results, the
procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are
True width not currently known. All lengths are down-hole
particularly important in the
lengths and not true width.
reporting of Exploration Results.
Diagrams
Appropriate maps and sections Refer to diagrams in body of text.
(with scales) and tabulations of
intercepts should be included
for any significant discovery
being reported These should
include, but not be limited to a
plan view of drill hole collar
locations and appropr
Share your feedback
Discover