Highlights
•
31 new LCT pegmatites discovered to the east of the Mavis Lake Main Zone, including
multiple spodumene-bearing pegmatites1.
•
Discoveries reinforced with the extension of multiple mapped outcrops – increasing the
known outcrop of spodumene-bearing pegmatites up to 250m along strike.
•
83 grab and channel samples collected across the broader Mavis Lake Project Area.
•
Muscovite samples gathered for Laser Induced Breakdown Spectroscopy (LIBS) analysis,
enhancing knowledge on the fractionation trends.
•
Advanced planning completed for the positioning of drill pad locations targeting known
spodumene-bearing pegmatites within the Northern Prospects (Gullwing and Tot).
•
Planning and permits in place to undertake mechanical stripping and channel sampling
of the Tot Pegmatite.
Lithium exploration and project development company Critical Resources Limited ASX:CRR
(“Critical Resources” or “the Company”) is pleased to advise that it has discovered multiple
additional spodumene-bearing pegmatites at the Company’s 100%-owned Mavis Lake Lithium
Project (“the Project”) in Ontario, Canada.
The discoveries, made just weeks into the Company’s 2024 Summer Field Exploration Campaign,
highlight the outstanding potential of the Mavis Lake Project to yield further significant lithium
discoveries. The exciting results also provide further validation of the JORC compliant Exploration
Target announced last week for Mavis Lake (see ASX announcement, 22 May 2024).
Detailed Field Work Delivers Outstanding Initial Results
A field work program comprising prospecting, mapping and sampling began in early May,
designed to identify new spodumene-bearing pegmatites, determine fractionation trends at
the Northern Prospects and conduct drill pad reconnaissance throughout the Mavis Lake Lithium
Project.
A total of 83 samples were collected from pegmatite outcrops across the broader Project Area.
A total of 31 new pegmatite discoveries have been made. The discoveries include a ~250m
extension of a known spodumene-bearing pegmatite (Pegmatite 20) and 100m extension of the
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
Main Zone spodumene-bearing pegmatite cluster (Pegmatites 7 and 24). Samples have been
prepared and will be dispatched to an independent analytical laboratory in the coming weeks,
with full results expected in July/August 2024.
Critical Resources Managing Director, Alex Cheeseman said:
“It’s great to see field teams directly following up our Exploration Target and making further
significant discoveries at Mavis Lake at the start of the new field season. The field program has
already increased our confidence in our ability to deliver on the recently published Exploration
Target, paving the way for drill testing a number of high-quality targets. We look forward to
continuing our dual-track strategy of targeting resource growth while progressing our project
development and permitting workstreams for Mavis Lake.”
Discoveries at Main Zone and East of Main Zone
Field crews spent three weeks prospecting across the Mavis Lake Project Area, resulting in the
discovery of 31 new LCT-Type pegmatites. Most of these discoveries are located proximal to and
to the east of the Main Zone.
Notable finds include a ~250-metre extension of spodumene-bearing pegmatite 20, a ~100-metre
extension of spodumene-bearing pegmatites 7 and 24, and the identification of spodumenebearing pegmatite 25.
Figure 1 – Plan map of Mavis Lake Main Zone and East of Main Zone showing locations of grab
samples and discovery reference areas
Page 2 of 18
Pegmatite 20 Extension
Historical exploration results within the Company’s database, including litho-geochemical
assessments of both mafic volcanic host rock and pegmatite, identified a number of areas with
elevated lithium values. This data was used to vector field teams onto previously un-mapped
pegmatite structures.
Field teams subsequently discovered spodumene-bearing pegmatites measuring up to 2 metres
wide, which were mapped and channel sampled. Field teams noted that the newly discovered
pegmatites exhibited mineralogical similarities to Pegmatites 11, 12, and 20.
The most recent drill testing of Pegmatites 11 and 12 was completed in early 2023, with key
intercepts (refer to ASX Announcement released 27 March 2023) including:
-
Drill-hole SZ23-002 with 6.08m @ 1.66% Li2O from 73.12m down-hole;
Drill-hole SZ23-004 with 9.45m @ 1.22% Li2O from 111.85m down-hole; and
Drill-hole SZ23-010 with 6.45m @ 1.53% Li2O from 208.05m down-hole.
The ~250 metre extension of Pegmatite 20 identified along strike has resulted in a total strike length
of approximately 535m. The Mavis Lake Mineral Resource Estimate does not include any ore
shapes originating from this area of Mavis Lake. The newly discovered pegmatites have been
designated as Pegmatite 20 extension (P20 ext) and are shown in Figure 2.
Figure 2 – Plan map of the newly discovered Pegmatite 20 extension, with a strike length of
approximately 535m from Pegmatites 11 and 12 through to the extension of Pegmatite 20
Page 3 of 18
The Pegmatite 20 extension consists of multiple steeply-dipping veins. Visual identification has
confirmed the presence of spodumene ranging from 5% to 10%, presented as fine to mediumgrained mint green lathes (refer to Figure 3) with assay results pending1. Visual mineral mapping
indicates a connection to Pegmatites 11, 12, and 20. Details of all samples and visual estimates
can be seen in Appendix 1 – Exploration Results Table 1.
Figure 3 – Medium to fine-grained spodumene within channel sample of the Pegmatite 20
extension
1In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of
mineral abundance should never be considered a proxy or substitute for laboratory analysis where
concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant
to valuations. Refer to Cautionary Note – Visual Estimates.
Pegmatite 7 and 24 Extension
Pegmatites 7 and 24 were previously mapped as relatively small pegmatite occurrences, hidden
beneath thick till overburden. Following the 2023 drilling program, drill pad and drill trail
construction exposed a number of pegmatite occurrences at surface.
Field teams completed prospecting and clearing around Pegmatites 7 and 24 and were able to
successfully expose both pegmatites towards the east and west.
Page 4 of 18
Pegmatite 7, trending roughly east-west, is up to 4 metres thick with a known strike length of 100
metres and the mineralisation appearing to be open at each end as shown in Figure 4. Notably,
Pegmatite 7 exhibits surface features of megacrystic quartz and spodumene, indicating significant
mineralisation potential as seen in Figure 5. Multiple samples were taken, with assay results pending.
Figure 4 – Plan map showing the extensions of Pegmatites 7 and 24
Figure 5 – Left image: very coarse spodumene (Spd) laths up to 30cm in length. Right image: flat
lying outcrop, hosting coarse spodumene as distinct from Quartz (Qtz)1.
Page 5 of 18
The surface contacts of these pegmatites revealed structural deviations, contrary to previous
understanding. Pegmatite 7 exhibited a near-vertical dip, while Pegmatite 24 dips shallowly
towards the south, contrasting with the typical shallow northward dip of the Main Zone.
This structural divergence is now better understood the newly defined structural trend of these
pegmatites have unveiled new additional drill targets for possible immediate high-grade success,
near surface.
Pegmatite 25 Extension
Field crews completed prospecting around previously mapped Pegmatite 25. Discoveries of
additional pegmatite veins were made 100m south and 30m east of Pegmatite 25. One of the
newly mapped veins, crossing a well-established logging trail, shares similar characteristics with
Pegmatite 25, suggesting it could be an extension of Pegmatite 25 as shown in Figure 6.
Figure 6 - Plan map of Pegmatite 25/Pegmatite 25 extension
Structurally, Pegmatite 25 appears as an undulating, amorphous intrusive body, relatively flat-lying
with a northward dip along its northern flank. Several offshoots or limbs were observed and
sampled along the south-west foot of the outcrop, with assay results pending.
Prospecting the Northern Prospects
The Northern Prospects comprises pegmatites that form an East-North-East trending cluster
spanning approximately 2km wide and extending over an 8km strike. This highly prospective area
encompasses various pegmatite dykes, including the Gullwing spodumene pegmatite swarm, Tot
Page 6 of 18
spodumene pegmatite, Coates beryl-molybdenite pegmatite, and a further 15 LCT pegmatite
dykes.
The primary objective of the prospecting program at the Northern Prospects was to investigate
geochemical anomalies and explore potential structural breaks highlighted by recent airborne
magnetic survey (refer to ASX Announcement dated 17 April 2024).
Drill pad locations and access routes for exploratory drilling of the Gullwing and Tot pegmatites
were also identified during prospecting.
Previously mapped LCT pegmatites may have been underestimated for their spodumene
mineralisation potential. Each previously mapped pegmatite was revisited, exposed and
thoroughly sampled. Muscovite/biotite samples have been taken on most outcrops to determine
degree of fractionation by utilizing Laser Induced Breakdown Spectroscopy (LIBS) analysis.
Future Work
The pending assays will inform and support priorities for future drill testing. The Company’s current
assessment is that the Tot pegmatite presents as the highest priority for immediate follow-up
exploration effort. This is due to the high-grade and consistent nature of the mineralisation found
throughout the outcrop.
Extensional drilling to the east and south of the Main Zone as well as drill testing of the Gullwing
Pegmatite remain as secondary priorities to occur within the Company’s CY2024 drilling program.
The Tot pegmatite contains metacystic spodumene throughout the entire 50m outcrop surface. A
mechanical stripping and channel sampling program is currently being designed to expose the
outcrop’s surface extensions and provide channel sample results for future resource definition
drilling.
The Company has approved drill permits to allow all potential target areas to be tested as well as
stripping and channel sampling permits for immediate testing of the Tot Pegmatite.
The Company expects a stripping and channel sampling program at Tot to commence in early
July 2024.
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada
which are ideally positioned to participate in the rapidly growing North American battery materials supply chain.
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
Page 7 of 18
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPETENT PERSONS STATEMENT / COMPLIANCE STATEMENT The information in this ASX Announcement that relates to
Exploration Results is based on information compiled by Mr. Troy Gallik (P. Geo), a Competent Person who is a Member
of the Association of Professional Geoscientists of Ontario. Troy Gallik is a full-time employee of Critical Resources. Mr.
Gallik has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Gallik consents to
the inclusion in this Announcement of the matters based on his information in the form and context in which it appears.
This announcement contains information on the Mavis Lake Lithium Project extracted from ASX market announcements
dated 27 March 2023 and 22 May 2024 reported in accordance with the 2012 JORC Code and available for viewing
at www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original ASX market announcement.
This information in this ASX Announcement regarding that relates to the Mavis Lake Mineral Resource Estimate is
extracted from ASX market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code
and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that all material
assumptions and technical parameters underpinning the estimates in the original market announcement continue to
apply and have not materially changed.
JORC Classification
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
Inferred
0.3
8.0
1.07
Total*
Inferred
8.0
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by
inverse distance weighting. Classification is according to JORC Code Mineral Resource categories. Refer to
ASX announcement 5 May 2023, 8.0 Mt at 1.07% Li2O Maiden Mineral Resource at Mavis Lake.
CAUTIONARY NOTE – VISUAL ESTIMATES in relation to the disclosure of visual mineralisation, the Company cautions that
visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analysis where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations. The presence of pegmatite
rock does not necessarily indicate the presence of lithium, caesium, tantalum (LCT) mineralisation. Laboratory
chemical assays are required to determine the grade of mineralisation.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Page 8 of 18
Appendix 1 – Exploration Results
Figure A1-1 - Project area map highlighting field program locations. Target 1 shows
the location of the Main Zone program and Target 2 shows the location of the
Northern Prospects program
Page 9 of 18
Table 1: Grab samples with lithology and visual estimates of Spodumene mineralisation
Sample ID
Easting
Northing
UTM
Date
Type
Lithology
Spd (%)
846868
524679
5517902
UTM_Z15N
2024-05-09
Outcrop
Spd-bearing
<50
846831
524661
5517907
UTM_Z15N
2024-05-09
Outcrop
Spd-bearing
<50
846787
524670
5517898
UTM_Z15N
2024-05-09
Outcrop
Spd-bearing
50
846832
524690
5517914
UTM_Z15N
2024-05-09
Outcrop
Spd-bearing
50
846761
526403
5519213
UTM_Z15N
2024-05-03
Proximal Float
Spd-bearing
25
846751
526343
5518601
UTM_Z15N
2024-05-01
Outcrop
Spd-bearing
15
846802
526344
5518608
UTM_Z15N
2024-05-01
Outcrop
Spd-bearing
10
846803
526233
5518362
UTM_Z15N
2024-05-01
Float
Spd-bearing
10
846785
525039
5517842
UTM_Z15N
2024-05-08
Outcrop
Spd-bearing
10
846824
525040
5517842
UTM_Z15N
2024-05-08
Channel
Spd-bearing
10
846823
525043
5517843
UTM_Z15N
2024-05-08
Channel
Spd-bearing
5
846786
525039
5517830
UTM_Z15N
2024-05-09
Channel
Spd-bearing
5
846827
525036
5517835
UTM_Z15N
2024-05-09
Channel
Spd-bearing
5
846788
524873
5517479
UTM_Z15N
2024-05-19
Outcrop
Spd-bearing
5
846773
525026
5517855
UTM_Z15N
2024-05-06
Outcrop
Spd-bearing
3
846819
525036
5517809
UTM_Z15N
2024-05-07
Outcrop
Spd-bearing
2
846834
524868
5517459
UTM_Z15N
2024-05-19
Outcrop
Spd-bearing
2
846855
526408
5519214
UTM_Z15N
2024-05-03
Proximal Float
Spd-bearing
1
846814
525976
5517951
UTM_Z15N
2024-05-05
Outcrop
Spd-bearing
1
846778
525044
5517881
UTM_Z15N
2024-05-07
Proximal Float
Spd-bearing
1
846779
524959
5517669
UTM_Z15N
2024-05-07
Outcrop
Spd-bearing
1
846826
525036
5517833
UTM_Z15N
2024-05-09
Channel
Spd-bearing
1
846757
526770
5518786
UTM_Z15N
2024-05-03
Float
Pegmatite
0
846758
526955
5518685
UTM_Z15N
2024-05-03
Float
Pegmatite
0
846762
526406
5519212
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846763
526409
5519215
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846764
526472
5519056
UTM_Z15N
2024-05-04
Float
Pegmatite
0
846765
526446
5519102
UTM_Z15N
2024-05-04
Outcrop
Pegmatite
0
846766
526326
5519362
UTM_Z15N
2024-05-04
Outcrop
Pegmatite
0
846808
526408
5519234
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846809
526439
5519117
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846854
526950
5518319
UTM_Z15N
2024-05-03
Float
Pegmatite
0
846856
526411
5519216
UTM_Z15N
2024-05-03
Proximal Float
Pegmatite
0
846857
526409
5519212
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846858
526412
5519132
UTM_Z15N
2024-05-03
Outcrop
Pegmatite
0
846862
526450
5519220
UTM_Z15N
2024-05-04
Outcrop
Pegmatite
0
846863
526446
5519219
UTM_Z15N
2024-05-04
Outcrop
Pegmatite
0
846767
527983
5518199
UTM_Z15N
2024-05-05
Float
Pegmatite
0
846768
526167
5517917
UTM_Z15N
2024-05-05
Float
Pegmatite
0
846769
526083
5517976
UTM_Z15N
2024-05-05
Proximal Float
Pegmatite
0
846771
525668
5518411
UTM_Z15N
2024-05-05
Float
Pegmatite
0
846866
526036
5517675
UTM_Z15N
2024-05-05
Float
Pegmatite
0
846867
524958
5517811
UTM_Z15N
2024-05-06
Float
Pegmatite
0
846816
525040
5517842
UTM_Z15N
2024-05-06
Outcrop
Pegmatite
0
846774
525026
5517855
UTM_Z15N
2024-05-06
Outcrop
Pegmatite
0
846776
524953
5517851
UTM_Z15N
2024-05-06
Float
Pegmatite
0
846753
526207
5517980
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846754
526173
5517965
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
Page 10 of 18
846755
526406
5518054
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846756
526461
5518073
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846801
526842
5518382
UTM_Z15N
2024-05-01
Float
Pegmatite
0
846851
526198
5517990
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846852
526204
5517991
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846805
526232
5517965
UTM_Z15N
2024-05-02
Outcrop
Pegmatite
0
846818
525048
5517910
UTM_Z15N
2024-05-07
Outcrop
Pegmatite
0
846821
525028
5517804
UTM_Z15N
2024-05-07
Outcrop
Pegmatite
0
846822
525028
5517797
UTM_Z15N
2024-05-07
Outcrop
Pegmatite
0
846777
525044
5517882
UTM_Z15N
2024-05-07
Outcrop
Pegmatite
0
846782
524972
5517685
UTM_Z15N
2024-05-07
Outcrop
Pegmatite
0
846789
524870
5517581
UTM_Z15N
2024-05-19
Outcrop
Pegmatite
0
846759
526957
5518354
UTM_Z15N
2024-05-03
Float
Other
0
846806
526922
5518845
UTM_Z15N
2024-05-03
Float
Other
0
846807
526901
5518244
UTM_Z15N
2024-05-03
Float
Other
0
846853
526834
5518744
UTM_Z15N
2024-05-03
Float
Other
0
846772
525740
5518506
UTM_Z15N
2024-05-05
Outcrop
Other
0
846866
525755
5518512
UTM_Z15N
2024-05-05
Outcrop
Other
0
846813
528095
5518261
UTM_Z15N
2024-05-05
Float
Other
0
846815
525772
5518835
UTM_Z15N
2024-05-05
Outcrop
Other
0
846861
526454
5519220
UTM_Z15N
2024-05-04
Outcrop
Host
0
846817
525041
5517825
UTM_Z15N
2024-05-06
Outcrop
Host
0
846781
524959
5517669
UTM_Z15N
2024-05-07
Outcrop
Host
0
846825
525041
5517837
UTM_Z15N
2024-05-08
Channel
Host
0
846828
525035
5517835
UTM_Z15N
2024-05-09
Outcrop
Host
0
846829
525037
5517830
UTM_Z15N
2024-05-09
Outcrop
Host
0
846811
526449
5519106
UTM_Z15N
2024-05-04
Outcrop
Barren Peg
0
846812
526367
5519337
UTM_Z15N
2024-05-04
Outcrop
Barren Peg
0
846859
526429
5519114
UTM_Z15N
2024-05-04
Outcrop
Barren Peg
0
846864
527958
5518198
UTM_Z15N
2024-05-05
Float
Barren Peg
0
846775
524977
5517830
UTM_Z15N
2024-05-06
Outcrop
Barren Peg
0
846804
526230
5517971
UTM_Z15N
2024-05-02
Outcrop
Barren Peg
0
846783
524908
5517689
UTM_Z15N
2024-05-07
Outcrop
Barren Peg
0
846784
524941
5517687
UTM_Z15N
2024-05-07
Outcrop
Barren Peg
0
846752
526202
5517971
UTM_Z15N
2024-05-02
Outcrop
Aplite
0
Page 11 of 18
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling Bedrock Grab Samples
(e.g., cut channels, random
• Sampling will be conducted on the surface of exposed
chips, or specific specialised
outcrops or float rocks via pick, hammer, or another
industry standard measurement
handheld tool.
tools appropriate to the
minerals under investigation,
• Samples only represent a direct point on the surface and
such as down hole gamma
may not be representative to the entire rock body.
sondes, or handheld XRF
• All rock samples collected were shipped to Actlabs
instruments, etc). These
examples should not be taken Laboratories in Dryden, ON, for trace and rare earth
as limiting the broad meaning elements by sodium peroxide fusion ICP-OES/ICP-MS 58
elements. The Company submitted standards and blanks
of sampling.
while Actlabs also provided internal lab QAQC.
• All grab samples will have NAD83 15N coordinates.
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material
to the Public Report. In cases
where ‘industry standard’ work
has been done this would be
relatively simple (e.g., ‘reverse
circulation drilling was used to
obtain 1 m samples from which
3 kg was pulverised to produce
a 30 g charge for fire assay’). In
other cases more explanation
may be required, such as
where there is coarse gold that
has inherent sampling
problems. Unusual commodities
or mineralisation types (e.g.,
submarine nodules) may
warrant disclosure of detailed
information.
Drilling
techniques
• Not applicable as no drilling was undertaken
Drill type (e.g., core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g.,
core diameter, triple or
standard tube, depth of
diamond tails, face-sampling
bit or other type, whether core
is oriented and if so, by what
method, etc).
Page 12 of 18
Criteria
JORC-Code Explanation
Commentary
Drill sample
recovery
• Not Applicable
Method of recording and
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample
bias may have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Bedrock
• Sample site description and basic nature of the
sample medium was routinely collected and at times
photographed for reference.
Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
The total length and
percentage of the relevant
intersections logged.
Sub-sampling If core, whether cut or sawn
• Not Applicable
techniques and and whether quarter, half or all
sample
core taken.
preparation
If non-core, whether riffled,
tube sampled, rotary split, etc
and whether sampled wet or
dry.
For all sample types, the nature,
quality and appropriateness of
the sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in situ material collected,
including for instance results for
field duplicate/second-half
sampling.
Page 13 of 18
Criteria
JORC-Code Explanation
Commentary
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Quality of assay The nature, quality and
data and
appropriateness of the assaying Bedrock Grab Samples
•All rock samples collected will be shipped to Actlabs
laboratory tests and laboratory procedures
Laboratories in Dryden, ON, Canada
used and whether the
technique is considered partial • Samples were analysed for trace and rare earth elements
by sodium peroxide fusion ICP-OES/ICP-MS 58 elements.
or total.
• The Company submitted standards and blanks while
Actlabs also provided internal lab QAQC
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in determining
the analysis including
instrument make and model,
reading times, calibrations
factors applied and their
derivation, etc.
Nature of quality control
procedures adopted (e.g.,
standards, blanks, duplicates,
external laboratory checks)
and whether acceptable levels
of accuracy (i.e., lack of bias)
and precision have been
established.
Verification of
sampling and
assaying
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
Bedrock Grab Samples
• No independent verification completed at this stage.
• No assay results are provided.
• No adjustments to the assay data.
• No assay cut off grades are applied.
Documentation of primary
• The data regarding sampling location and sample
data, data entry procedures, information is stored in tabular format and is appended to
data verification, data storage this report.
(physical and electronic)
protocols.
Discuss any adjustment to assay
data.
Location of
data points
Accuracy and quality of
Bedrock Grab Samples
surveys used to locate drill holes • Samples will be recorded with Garmin GPS that has an
(collar and down-hole surveys), accuracy in the order of ±3 metres for location.
trenches, mine workings and
• WGS 1984 UTM Zone 15N.
other locations used in Mineral
• No specific topography survey has been completed over
Resource estimation.
the project area.
Specification of the grid system
used.
Quality and adequacy of
topographic control.
Data spacing Data spacing for reporting of
and distribution Exploration Results.
Page 14 of 18
Criteria
JORC-Code Explanation
Commentary
Whether the data spacing, and
distribution is sufficient to
Bedrock Grab Samples
establish the degree of
geological and grade
• The samples are considered random taken directly from
continuity appropriate for the outcropping spodumene-bearing pegmatite.
Mineral Resource and Ore
• The data spacing, and distribution are not sufficient to
Reserve estimation
establish the degree of geological and grade continuity.
procedure(s) and classifications
applied.
Whether sample compositing
has been applied.
Orientation of Whether the orientation of
Bedrock Samples
data in relation sampling achieves unbiased
• ESE-WNW oriented grids are used to cover the
to geological sampling of possible structures
majority of known geological and structural trends.
structure
and the extent to which this is
known, considering the deposit • Samples were spaced to provide a first pass test of as
many geological/geophysical targets as possible in the
type.
time available.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and
reported if material.
Sample security The measures taken to ensure
sample security.
Audits or
reviews
Bedrock Grab Samples
•All rock samples collected were shipped to Actlabs
Laboratories in Dryden, ON by transport trailer. All sample
bags had security tags and were confirmed upon arrive to
the lab.
The results of any audits or
• Assay results were checked and validated by
reviews of sampling techniques competent persons in Thunder Bay, Ontario.
and data.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC-Code Expl