Half Year Accounts
Released
Released
Announcement PDF
and its Controlled Entities
ABN 12 145 184 667
Half Year Financial Report
30 JUNE 2024
CRITICAL RESOURCES LIMITED AND CONTROLLED ENTITIES
CORPORATE INFORMATION
DIRECTORS
Mr Robert Martin
Mr John Markovic
Mr Nigel Broomham
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
COMPANY SECRETARY
Mr Harry Spindler
REGISTERED AND PRINCIPAL OFFICE
Level 45, 108 St Georges Terrace
Perth WA 6000
Telephone (08) 9465 1024
Website www.criticalresources.com.au
POSTAL ADDRESS
PO Box 1024
West Leederville WA 6007
AUDITORS
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
SHARE REGISTER
Computershare Investor Services Pty Limited
GPO Box 2975
Melbourne, VIC 3001
Telephone 1300 850 505
(03) 9415 4000
Critical Resources Limited shares are listed on the Australian Securities Exchange (ASX)
ASX Code
CRR
ACN
145 184 667
ABN
12 145 184 667
In this report, the following definitions apply:
“Board” means the Board of Directors of Critical Resources Limited
“Critical” or the “Company” means Critical Resources Limited ABN 12 145 184 667
“Group” means Critical Resources Limited and its controlled entities
CRITICAL RESOURCES LIMITED AND CONTROLLED ENTITIES
TABLE OF CONTENTS
AUDITOR’S INDEPENDENCE DECLARATION ....................................................................13
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME ..14
CONSOLIDATED STATEMENT OF FINANCIAL POSITION ...................................................15
CONSOLIDATED STATEMENT OF CASH FLOWS ...............................................................16
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ....................................................17
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS ...............................................18
INDEPENDENT AUDITOR’S REVIEW REPORT ..................................................................28
1
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
The directors of Critical Resources Limited, (”Critical Resources”, “CRR” or “the Company”) submit the
financial report of the Company and its controlled entities (“the Group”) for the half year ended 30 June
2024.
DIRECTORS
The names and details of the Directors of Critical Resources in office during the half year and until the date
of this report are set out below. Each director was in office for the entire period unless stated otherwise.
The names and particulars of directors who are in office at the date of this report:
Mr Robert Martin
Mr John Markovic
Mr Nigel Broomham
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
The names and particulars of directors who are not in office at the date of this report but who held office
during the period:
Mr Alex Cheeseman
Managing Director (resigned 7 June 2024)
COMPANY SECRETARY
Mr Harry Spindler
PRINCIPAL ACTIVITIES
The principal activity of the Group during the financial period was mineral exploration and development
across a range of projects but with particular emphasis on the Company’s flagship Mavis Lake Lithium
Project in Ontario, Canada.
FINANCIAL RESULTS
The loss for the Group for the six months ended 30 June 2024 amounted to $1,091,219 (30 June 2023: loss of
$3,416,862). As of 30 June 2024, the Group had cash and cash equivalents of $2,256,750 (31 December
2023: $5,496,159) and net assets of $25,012,978 (31 December 2023: $26,810,183).
REVIEW OF OPERATIONS
Critical Resources is an ASX listed company focused on the advancement and development of critical
metals projects.
LITHIUM PROJECTS – CANADA
Mavis Lake Lithium Project, Ontario
Following on from the Company’s outstanding exploration programs completed in 2023 and
announcement of its maiden mineral resource estimate in 2023, Critical Resources remained focused on
the continued exploration and development of its primary asset in Ontario Canada, the Mavis Lake Project
(“Mavis Lake”).
Located in immediate proximity to utilities, services and transport infrastructure essential to support a future
mining operation, Mavis Lake is well positioned to become a long-term supplier of lithium products to North
America’s rapidly growing battery minerals and electric vehicle sector.
Exploration Target During the half year, the Company released a JORC Code 2012 compliant Exploration
Target (“the Target”) for the Mavis Lake Lithium Project. The estimated range of potential mineralisation is:
18 - 29 million tonnes at 0.8 - 1.2% Li2O* (see Table 1 below) (excludes current Mineral Resource Estimate of
8Mt@1.07% Li2O).
This new Target is based upon the exploration potential of the Mavis Lake Main Zone (where the current
MRE is located), along with the precinct’s Northern Prospects, focused on the Gullwing and Tot pegmatites.
The Target, aimed at achieving a significant Resource base in North-western Ontario, excludes the current
8.0Mt @ 1.07% Li2O Inferred Mineral Resource Estimate (MRE).
Table 1 provides a summary of the Exploration Target including tonnage and grade ranges of each key
Prospect ready to be drill tested.
2
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
Table 1 – Summary of Project Exploration Target (refer announcement 22 May 2024)
Prospect
Tonnes Range (Mt)
Li2O Range (%)
Minimum
Maximum
Minimum
Maximum
Main Zone Extension Exploration Target
8
14
1
1.2
Gullwing Exploration Target
7
10
0.3
1.2
Tot Exploration Target
3
5
0.8
1.2
Project Exploration Target
18
29
0.8
1.2
Cautionary statement - The Exploration Target has been prepared and reported in accordance with the
2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target is conceptual
in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
The Mavis Lake Project Area is a single contiguous claim area, covering a massive ~23,000 hectares. The
Project Area has known spodumene-bearing pegmatites throughout its entirety, many of which are yet to
be drill tested.
The Exploration Target highlights the potential for a large-scale lithium project. It includes the entirety of the
Mavis Lake Project Area, with a primary focus on known pegmatites that have proven significant lithium
mineralisation from spodumene.
Geological modelling and wireframing of the pegmatites included in the exploration model derived from
inferred resource shapes, outcropping pegmatites including structural measurements and detailed
geological interpretations.
Main Zone Final assay results received during the period from the 2023 main zone drilling program includes
key intercepts that extends the known mineralisation in the Main Zone, successfully delineates the newly
identified Lower Zone, and also provided in-fill results that should support a category upgrade as part of a
future Resource upgrade.
Outstanding new results, which sit outside the current Mineral Resource Estimate (MRE), such as drillhole
MF23-230 which returned an intercept of 18.35m @ 1.46% Li2O from 160.65m down-hole, demonstrate the
potential to expand the Mavis Lake Resource. An additional significant intercept in drill-hole MF23-226,
which returned 20.7m @ 1.44% Li2O from 339.3m down-hole, and drill-hole MF23-228, which intercepted
14.85m @ 1.25% Li2O from 333.25m down-hole, have confirmed the discovery of a lower pegmatite stack.
These results, together with previously released assays, have delineated a thick, very high-grade mineralised
‘Lower Zone’ at depth as shown in Figure 1. The entirety of this Lower Zone sits outside the current MRE and
presents an opportunity to add high-grade tonnage to a future Resource upgrade as well as an exciting
exploration target which remains open both down-dip and also trends to surface.
Figure 1: Long Section, looking SSE, illustrating the current projection of known (assayed) ~1000m strike of lithium
mineralisation within the Swell Zone (purple) relative to the MRE resource shapes (pink).
3
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
The shallow intercepts recorded in drill-holes MF23-237, MF23-238 and MF23-242, such as MF23-238’s 11m @
1.13% Li2O from 5.6m down-hole, have confirmed the Company’s interpretation of the pegmatite trends
surrounding the Main Zone.
UAV-Borne Magnetic and MMI Soil Programs Identifies New Drill Targets In addition to the positive
exploration results reported from drilling completed in late CY2023, highly encouraging results were returned
from a comprehensive Mobile Metal Ion (MMI) soil geochemistry program and UAV-borne magnetic survey
completed late last year, which focused on the Northern Prospects and particularly the high-grade Tot
pegmatite, located in the northern part of the Mavis Lake Lithium Project area.
The MMI soil geochemistry program was designed to provide early-stage planning for secondary drill
targets, trending from the known high-grade outcrops with known, thick overburden surrounding the
outcrop. The program was completed over an expansive area of 7km by 1.25km, with 1,356 soil samples
collected. The MMI soil sampling was conducted on a line spacing of 100m. Sample spacing varied, starting
from 25m, progressing to 50m and finally extending to 100m, radiating outward from the Tot Pegmatite
prospect.
The MMI soil analysis results highlight strong anomalies in lithium, caesium and rubidium, extending in both
a north-north-west and south-south-east orientation from the exposed Tot outcrop. These anomalies
collectively contribute to the delineation of significant anomalies including a prominent lithium anomaly
extending over a geochemical strike length of 1.25km, indicating the possible extension of mineralisation
well beyond the visible surface exposure of the Tot pegmatite. The aeromagnetic survey has delineated
linear magnetic lows in the Northern Prospects, indicating potential extensions of known spodumenebearing pegmatites like Gullwing and Tot, as well as newly identified trends suggestive of proximal
pegmatite emplacement zones correlated with geochemical surface samples, notably MMI soils.
High-resolution magnetic data collected by UAV survey late last year has identified prospective new drill
targets along the highly promising 8km, East-West trend between the spodumene-bearing Gullwing and
Tot Pegmatites within the Northern Prospects of the Mavis Lake project.
The survey has identified multiple North-South linear trends exhibiting magnetic lows, analogous to the
trends observed in the Gullwing and Tot pegmatites. These magnetic anomalies are interpreted as either
being the extension of known pegmatites, the presence of additional pegmatites, or previously
undiscovered significant structural features.
Prospective structures have been identified within areas that contain anomalies with elevated levels of
lithium, caesium, and rubidium.
Building on previous exploration results, incorporating historical rock-chip and channel sampling data, lithogeochemical sampling and the multiple Li, Cs, Rb Mobile Metal Ion (MMI) results across the Northern
Prospects, the Company is increasingly confident that significant LCT-Type mineralisation is associated with
the magnetic low structures identified from the airborne magnetic survey.
4
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
Figure 2: The residual magnetic intensity (RMI) of the Northern Prospects identifying numerous North-South magnetic
breaks (depicted by dashed black lines) assessed as being caused by possible LCT pegmatite occurrences.
Figure 3: Priority targets identified through overlaying MMI soil survey lithium results with the Aero-magnetic survey results
– illustrating geochemical relationships with magnetic low structures.
Prospecting Summer Program The recommencement of the prospecting programs during the summer
months successfully resulted in the discovery of 31 new LCT pegmatites to the east of the Main Zone,
including multiple spodumene-bearing pegmatites were discovered during the period.
5
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
Following the commencement of a field work program comprising prospecting, mapping and sampling in
May, a total of 83 grab samples were collected to assess lithium mineralisation from spodumene, as well as
fractionation and concentrations of Lithium, Rubidium, Caesium and Tantalum. Key results are shown in
Table 2 and Figure 4.
Results from this program were received subsequent to the half year end. Highlights include:
-
High-grade lithium results ranging from 2.07% to 5.12% Li2O in grab samples across the ~100-metre
extensions of spodumene-bearing Pegmatites 7 and 24.
Up to 1.17% Li2O at the ~250-metre extension of spodumene-bearing Pegmatite 20.
Up to 2.76% Li2O in grab samples from Pegmatite 19.
Figure 4 – Plan map showing locations of grab samples and discovery reference areas.
Table 2: Significant Assay Results from the May 2024 Summer Prospecting Program
Sample ID
Easting
Northing
Li (ppm)
Li2O (%)
Cs (ppm)
Rb (ppm)
Ta (ppm)
Pegmatite
Type
846868
524679
5517902
23800
5.12
254
738
52.4
Pegmatite 7ext
Outcrop
846831
524661
5517907
19800
4.26
81.9
486
14.4
Pegmatite 7ext
Outcrop
846751
526343
5518601
12800
2.76
658
5000
200
Pegmatite 19
Outcrop
846832
524690
5517914
12800
2.76
61.4
830
186
Pegmatite 7ext
Outcrop
846782
524972
5517685
10200
2.20
101
1930
60.2
Pegmatite 20
Outcrop
846803
526233
5518362
10000
2.15
370
3070
168
Pegmatite 19
Float
846787
524670
5517898
9610
2.07
204
538
50.1
Pegmatite 7ext
Outcrop
846788
524873
5517479
8800
1.89
175
2240
89.2
Pegmatite 20
Outcrop
846834
524868
5517459
7370
1.59
189
2780
96.9
Pegmatite 20
Outcrop
846829
525037
5517830
5420
1.17
15.1
53.4
2.4
Pegmatite 20ext
Outcrop
846817
525041
5517825
5290
1.14
24.8
105
5.2
Pegmatite 20ext
Outcrop
Mechanical Stripping Program Commences at Tot Pegmatite Prospect Following on from the success of the
summer field work activities completed during the half year, the Company post 30 June, commenced a
mechanical stripping and channelling program at the Tot pegmatite in support of future resource
interpretations.
6
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
This program successfully extended known footprint of the Tot Pegmatite to a strike length of approximately
50 meters, with an average width of 8 meters demonstrating substantial high-grade spodumene
mineralisation throughout. Although the pegmatite’s strike is anticipated to continue further, its surface
expression is covered by thick glacial lacustrine clay overburden, which has halted further exposure along
strike by the excavator. The Tot Pegmatite's strike aligns with the previously reported ~1.25 km MMI survey
Lithium anomaly (refer above).
Six channels were cut perpendicular to strike, for a total of 56 meters, and 56 samples were collected, with
high-grade lithium oxide assay results of up to 3.79% Li2O over 1m. Highlights of significant mineralisation
are shown below:
Table 3: Highlights from Tot Channel Intercepts
Hole ID
From (m)
To (m)
Down Hole
Interval (m)
Li2O (%)
True Width (m)
CH002
3
10
7
1.21
7.0
CH003
1
7
6
1.57
6.0
including
3
6
3
2.80
3.0
CH004
2
5
3
1.16
3.0
CH006
2
8
6
1.33
6.0
Highly Encouraging Ore Sorting Testwork Results Metallurgical test work programs were continued during
the half year, with outstanding results reported in early May and early July 2024.
The Company has been working closely with Saskatchewan Research Council (SRC) and STARK Resources
to complete mineralogy and ore sorting investigations to assess the amenability of Mavis Lake ore to preconcentration by ore sorting.
A 150kg sample was chosen to focus on the range of lithologies evident at Mavis Lake. Excellent results
have shown that Mavis Lake ore is highly amenable to both waste rock separation and pre-concentration
using ore sorting technologies, warranting further test work.
X-Ray Transmission (XRT) ore sorting amenability test work was completed by SRC on all Mavis Lake
lithologies which were crushed and screened to +10mm -25mm sizing. The first stage of test work was a
static scan of crushed ore to capture the ore response to XRT scanning.
A second stage dynamic XRT sorting trial was successful in separating waste rock from pegmatite - 98% of
waste rock reported to rejects, while 99% of spodumene was recovered to sorter product.
Test work results show a clear distinction in the XRT response of the waste rock compared to pegmatite,
indicating high amenability of Mavis Lake ore to pre-concentration by XRT ore sorting. Waste ore sorting
can be integrated into the Mavis Lake flowsheet to upgrade mined ore in the coarse, dry phase, reducing
feed contaminants and increasing spodumene concentrate production.
Figure 5 - Dynamic XRT ore sorting results showing separation of pegmatites (left) from waste rock (right).
7
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
Table 4 - Dynamic XRT Sorting Trial - Mineral Balance
Stream
Mass
Distribution (%)
kg
%
Spodumene
Quartz
Albite
Muscovite
Biotite
Orthoclase
Holmquistite
Hornblende
XRT Product
20.3
71
99.3
68.2
95.7
93.7
22.6
79.4
1.2
2.0
XRT Waste
8.2
29
0.7
31.8
4.3
6.3
77.4
20.6
98.8
98.0
Feed (calc.)
28.5
100
100
100
100
100
100
100
100
100
UV-laser based spodumene ore sorting exploits the unique response of spodumene to UV light and is the
only sorting technology that targets spodumene directly. A static, stage one amenability study was
completed by Stark Resources on all Mavis Lake lithologies, which were crushed and screened to +10mm
-25mm sizing.
The UV sorter clearly identified spodumene within all pegmatites, indicating high amenability of Mavis Lake
ore to pre-concentration by UV-laser based sorting.
A second stage dynamic UV sorting trial on a 28kg composite sample incorporated all Mavis Lake
lithologies and comprised 25% waste rock to reflect worst case dilution from full scale mining.
The trial successfully produced a high-grade spodumene ore concentrate, lithia grade increased by a
factor of 2.5, from 0.65% Li2O in the feed to 1.63% Li2O in the ore concentrate. Furthermore 96% of Fe2O3
was rejected. The lithia content of the waste rejects was low at 0.28% Li2O.
Figure 6 - Dynamic UV ore sorting trial results showing spodumene ore concentrate with its characteristic UV response
(top) and waste minerals with no response (bottom).
8
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
Table 5 - Dynamic UV Sorting Trial – Lithia and Iron Balance
Grade
Mass
Distribution
Li2O
Fe2O3
Li2O
Fe2O3
Stream
kg
%
%
%
%
%
UV Product
7.8
28
1.63
0.59
69
4
UV Waste
20.4
72
0.28
6.12
31
96
Feed (calc.)
28.2
100
0.65
4.59
100
100
The results show the promising potential of UV-laser based spodumene direct sorting to produce coarse
spodumene ore concentrates from mined ore.
This provides opportunities to reduce the capital cost, operating cost and total impact (footprint and
energy intensity) of hard rock lithium processing operations through increasing spodumene concentrate
production and reducing tailings volume.
Critical Resources has developed a comprehensive metallurgical test work program to support the
development of the Mavis Lake Project.
Encompassing the full beneficiation flowsheet, the program is being conducted in three phases. SRC has
been engaged to complete the Phase 1 scope, with over 1,600kg of drilled core delivered during the
period to the SRC facility in Saskatoon, which was completed subsequent to the period end.
A total of 1,650kg of drill core was submitted to Saskatchewan Research Council (SRC) for feasibility level
testing. The sample suite of drill core represents 11 pegmatite intercepts totalling 196m across four HQ drill
holes, from a range of spatial locations within the current mineral resource estimate (MRE) at Mavis Lake.
The sample suite included ore from depths ranging from 52.7m – 249.3m below surface. The sample suite
also comprised waste rock intended to be representative of typical dilution expected from conventional
mining methods
The samples were separated into two lithology composites. The Standard Pegmatite composite consists of
pegmatites more than 0.5m from the host rock contact zone. These pegmatite samples comprised zero (0)
waste rock dilution and are generally coarser grained. This is the predominant pegmatite mineralogy at
Mavis Lake.
The Contact Zone Pegmatite composite consists of pegmatites within 0.5m of the host rock contact zone.
These pegmatite samples are generally finer grained and more altered. The Contact Zone Pegmatite
composite also comprised ~40% waste rock to reflect worst case mining dilution.
Although Contact Zone pegmatites are a minority within the Mavis Lake deposit, their distinct mineralogy
and increased likelihood of mining dilution warrant in depth metallurgical investigation. Ore sorting has
become increasingly adopted in hard rock lithium mining to effectively pre-treat contact zone pegmatites.
Ore sorting is employed to reject waste rock and mining dilution from ROM feed, pre-concentrating the ore
prior to downstream processing. This has the advantage of increasing feed grades to the processing plant,
de-bottlenecking dense medium separation (DMS) and flotation circuits, increasing spodumene
production and improving concentrate quality.
The phase I bulk testwork results was successful in showing that ore sorting achieved 40% mass rejection to
waste, removing 100% of iron bearing waste minerals ferrohornblende and holmquistite.
Spodumene recovery to sorter product was 100%. Lithia grades increased by 30%, from 1.00% Li2O in sorter
feed to 1.30% Li2O in sorter product. Iron was effectively reduced from 7.52% Fe2O3 in sorter feed to 0.49%
Fe2O3 in sorter product.
The bulk ore sorting testwork results confirm the findings of amenability studies completed earlier. Mavis
Lake ore is highly amenable to preconcentration by XRT sorting in the coarse, dry phase of the flowsheet.
9
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
The ability to reject mining dilution prior to processing helps unlock the full potential of the Mavis Lake
resource. By removing iron bearing minerals early in the beneficiation flowsheet, the performance of both
dense medium separation (DMS) and flotation processes can be optimised. This facilitates higher plant
throughout rates, increased spodumene recoveries and an improved spodumene concentrate quality.
Studies During the half year, multiple workstreams continued to advance permitting as well as the technical
and financial aspects of the Company’s study efforts. Logistics planning and engagement with potential
service providers has advanced export logistics concepts. With multiple export ports accessible from
existing Road and Rail networks, the Company will advance a number of potential export options in formal
studies. Optionality will allow for detailed cost/benefit analysis and inform pricing strategies and
considerations for future negotiations with potential customers.
Graphic Lake, Plaid and Whiteloon Lake Lithium Projects
With the Company focusing its working capital on the Mavis Lake project, no fieldwork was undertaken at
either the Graphic Lake, Plaid or Whiteloon Projects during the period. Desktop work and assessment was
carried out to evaluate the prospectivity of the Plaid and Whiteloon Lake project. An independent review,
supported by internal assessment, concluded that there was no prospectivity for lithium mineralisation
across the Plaid and Whiteloon project area, driven principally by the underlying geological setting not
being conducive for the formation of LCT pegmatites. The Company relinquished the Plaid and Whiteloon
project claims in February 2024.
Vermillion Bay Project
During the period, the Company through its subsidiary group staked additional land in Canada comprising
of 50 claim cells of ~1,000 hectares near the towns of Vermillion Bay, Dryden and the city of Kenora. The
Project is located proximal to nearby projects such as Beyond Lithium’s Victory Project and Pioneer Lithium’s
Benham projects.
The Vermillion Bay Project is also located only ~70km east of Critical Resources' Mavis Lake Project Area. The
project is overall under explored and yields potential for future spodumene-bearing pegmatite discoveries.
The Vermillion Bay Project is located on the boundary between the Winnipeg River and Wabigoon
subprovinces in the Medicine Lake area. This area was first explored in 1949 by E. Sobiski, who identified it
as a beryl-beryllium prospect. Later, in 1976, Pryslak delineated the Medicine Lake Pluton. This pluton,
approximately 0.5 by 1.5 km in size, is recognized as a fertile pluton based on analysis of highly fractionated
potassium feldspar samples conducted by Breaks and Tindle in 1997. According to Ontario Geological
Survey mapping, the main geological formations in the area encompass metasediments and
metavolcanics, with granitic intrusions in the vicinity of the two defined projects.
The Vermillion Bay Project area is located ~50 km east of Kenora and ~60 km west of Dryden with nearby
infrastructures including Pacific Railway (CP Rail) and network along the within the claim boundaries of the
Project, access via Trans-Canada Highway and Highway 17 that connect to Kenora and Thunder Bay 20minute commute time from the nearest town of Vermilion Bay, and Power line along Highway 17.
The Company considers this to be a Greenfield exploration opportunity.
OTHER PROJECTS
Halls Peak Base Metals Project – Australia (NSW)
During the period, all field work was constrained to rehabilitation and environmental inspections post the
2022 drilling program. With the Company focusing its working capital on the Mavis Lake Project, only
desktop activities were completed.
Subsequent to the period end, further targeted desktop works at the Hillgrove South Prospect (“the
Prospect”) at the Company’s Halls Peak Project (“Project”), located in NSW, Australia. This initiative will focus
on the Hall Peak tenements staked in 2021, strategically located ~6km southeast of Larvotto Resources Ltd’s
(“LRV”) Hillgrove deposit, which currently hosts a total resource of 7.264Mt @ 1.3% Sb for 93kt of contained
antimony (refer LRV announcement 5 Aug 2024). Given recent discoveries and the global shift in antimony
supply dynamics, the Company is moving to review the Halls Peak project for additional critical mineral
discoveries.
10
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 30 JUNE 2024
In light of recent developments in the global antimony market, particularly China's announced export
restrictions, the strategic importance of identifying new antimony sources has never been greater.
China accounted for 48% of global mined output of antimony which is used in military applications as
well as batteries and photovoltaic equipment.
Copper Project – Oman (Sohar)
The Company was advised by the Ministry of Energy and Minerals, Sultanate of Oman, (Ministry) that the
exploration licences over Block 4 and Block 5 had expired and would not be renewed as they had reached
the end of their stated renewal period. The Company submitted applications for the extension of the Block
5 mining licences (Mining Licences). The Company has received a letter from the Ministry advising that the
Mining Licences have been extended for a further 12 months and requiring the Company to provide
additional reports with respect to the mining licenses. The Company indirectly retains a majority
shareholding and associated asset interests in Al Fairuz Mining (AFM) LLC and Al Thuraya Mining (ATM) LLC,
the Company will engage in discussions with the in-country management regarding the future of the
projects.
ESG and Sustainability
During the period, the Company continued its regular engagement with First Nations Communities through
deliberate meetings and engagements at both the annual PDAC conference as well as subsequent
management visits to the Mavis Lake Project. The Company also engaged with local communities and the
Dryden Citizens Committee Meeting.
Additionally, the Company initiated a number of project introduction meetings to Ontario Government
departments that have been involved with the permitting process for the Mavis Lake Project. Specifically,
the Company met with and provided project updates to operational members of the Ministry of Natural
Resources and Forestry in Dryden, and the Ministry of Transport in Thunder Bay.
Corporate
In June, Managing Director Mr Alex Cheeseman tendered his resignation.
In August 2024, the Company announced a capital raising of $1.2 million before costs via the issue of 200
million ordinary shares at an offer price of $0.006 per share (“New Shares”), together with a 1-for-2 free
attaching option exercisable at $0.015 each and three years expiry (“New Options”) (“the Placement”)
Compliance Statement
This report contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX market
announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for viewing at
criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original announcement and that all material assumptions and technical
parameters underpinning the estimates in the original market announcement continue to apply and have not materially
changed.
This report contains information on the Mavis Lake Lithium Project extracted from ASX market announcements dated 25
October 2021, 21 July 2022, 25 October 2022, 31 October 2022, 20 December 2022, 27 March 2023, 16 June 2023, 27 June
2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023 24 October
2023, 15 November 2023, 13 February 2024,
Share your feedback
Discover