Investor Presentation
Released
Released
Announcement PDF
Lithium, Gold & Next-Generation
Battery Technology.
Investor Presentation - February 2026
ASX:CRR
1
Summary Information This document contains a summary of information about Critical Resources Limited
(“Critical Resources” or “the Company”) and its activities that is current as at the date of this document unless
otherwise stated. The information in this document is general in nature and does not contain all the information
which a prospective investor may require in evaluating a possible investment in Critical Resources or that would
be required in a prospectus or a product disclosure statement prepared in accordance with the Corporations
Act 2001 or the securities laws of any other jurisdiction. The information in this document should be read in
conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX.
No Liability. The information contained in this document has been prepared in good faith by the Company
however no guarantee, representation or warranty expressed or implied is or will be made by any person
(including the Company and its affiliates and their directors, officers, employees, associates, advisers and
agents) as to the accuracy, reliability, correctness, completeness or adequacy of any statements, estimates,
options, conclusions or other information contained in this document. No person other than the Company is
responsible for the preparation of this document. To the maximum extent permitted by law, the Company and its
affiliates and their directors, officers, employees, associates, advisers and agents each expressly disclaims any
and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from
the use of or reliance on information contained in this document including representations or warranties or in
relation to the accuracy or completeness of the information, statements, opinions, forecasts, reports or other
matters, express or implied, contained in, arising out of or derived from, or for omissions from, this document
including, without limitation, any financial information, any estimates, forecasts, or projections and any other
financial information derived therefrom. Statements in this document are made only as of the date of this
document unless otherwise stated and the information in this document remains subject to change without
notice. No responsibility or liability is assumed by the Company or any of its affiliates (or their directors, officers,
employees, associates, advisers and agents) for updating any information in this document or to inform any
recipient of any new or more accurate information or any errors or misdescriptions of which the Company and
any of its affiliates or advisers may become aware.
Forward-Looking Statements. Statements contained in this document, including but not limited to those
regarding the possible or assumed future costs, projected timeframes, performance, dividends, returns, revenue,
exchange rates, potential growth of Critical Resources, industry growth, commodity or price forecasts, or other
projections and any estimated company earnings are or may be forward-looking statements. Forward-looking
statements can generally be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘aim’,
‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, or similar expressions. Forward-looking statements, including all
statements in this presentation regarding the outcomes of preliminary and definitive feasibility studies,
projections, guidance on future earnings and estimates, are provided as a general guide only and should not be
relied upon as an indication or guarantee of future performance. These statements relate to future events and
expectations and, as such, involve known and unknown risks and significant uncertainties, many of which are
outside the control of the Company. Actual results, performance, actions and developments of the Company
may differ materially from those expressed or implied by the forward-looking statements in this document. Such
forward-looking statements speak only as of the date of this document. There can be no assurance that actual
outcomes will not differ materially from these statements. To the maximum extent permitted by law, the
Company and any of its affiliates and their directors, officers, employees, agents, associates and advisers
disclaim any obligations or undertaking to release any updates or revisions to the information in this document to
reflect any change in expectations or assumptions and do not make any representation or warranty, express or
implied, as to the accuracy, reliability or completeness of the information in this document, or likelihood of
fulfilment of any forward-looking statement or any event or results expressed or implied in any forward-looking
statement and disclaim all responsibility and liability for these forward-looking statements (without limitation,
liability for negligence). Nothing in this document will under any circumstances create an implication that there
has been no change in the affairs of the Company since the date of this document.
Not Financial Product Advice. This document does not constitute financial product advice or take into account
your investment objectives, taxation situation, financial situation or needs. This document consists purely of
factual information and does not involve or imply a recommendation of a statement of opinion in respect of
whether to buy, sell or hold a financial product. An investment in the Company is considered to be speculative in
nature and is subject to known and unknown risks, some of which are beyond the control of the Company.
Before making any investment decision in connection with any acquisition of securities, investors should consult
their own legal, tax and/or financial advisers in relation to the information in, and action taken on the basis of this
document.
Financial data. All amounts are in Australian Dollars (AUD) unless otherwise indicated. A number of figures,
amounts, percentages, estimates, calculations of values and fractions in this presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this
presentation.
JORC Code. It is a requirement of the ASX Listing Rules that the reporting of exploration results, ore reserves and
mineral resources in Australia comply with the Joint Ore Reserves Committee’s Australasian Code for Reporting of
Mineral Resources and Ore Reserves ("JORC Code"). Investors outside Australia should note that while reporting in
this document complies with the JORC Code, they may not comply with the relevant guidelines in other
countries. Information contained in this document describing mineral deposits may not be comparable to similar
information made public by companies subject to the reporting and disclosure requirements of Canadian or US
securities laws.
Acceptance By attending a presentation or briefing, or accepting, accessing or reviewing this document, you
acknowledge, accept and agree to the matters set out above.
Authorisation. This document has been authorised for release by the Company’s Board of Directors.
Refer to the Company’s ASX Announcements for JORC Table 1 and Table 2 for results and information contained
in this presentation.
Important Notices and Disclaimer
ASX:CRR
2
Overview of Critical Resources
Targeting the next High-Grade Critical Metals Discovery.
Capital Structure - ASX:CRR
$0.009 $29M
Share Price - 24 Feb 2026 Market Cap (A$)
$0 $0.96M
Debt ($A) Cash Position
as of 31st Dec 2025 before
$1.75M Capital Raise 29 Jan
2026
3.17B ~49%
Shares on Issue Top 20 Holders
3
- Multi-commodity exposure - lithium, gold and antimony
across Tier-1 geology and jurisdictions: Australia, Canada
and New Zealand.
- North American lithium resource – Mavis Lake, Ontario
Canada.
- High-impact gold portfolio in the Otago and Reefton
regions, New Zealand.
- Solid-state Lithium-ion battery evaluation – enhancing
optionality across partnerships and commercial pathways.
- Aligned, experienced leadership with ~11.0 % ownership.
ASX:CRR
Mavis Lake Project
Lithium Resource
Ontario - Canada
ASX:CRR
- Growing lithium resource with substantial expansion potential
– Northwest Ontario, Canada.
- Strategically located to support the North American lithium
supply chain.
- World-class Infrastructure – excellent access to multiple
road/rail/shipping transport corridors and hydro/gas power.
- Metallurgical recoveries up to 87 %2, with significant potential
to improve process flowsheet.
- Continuing low-cost value-adding workstreams in progress.
- Permitting & Regulatory Acceleration: Engagement of SLR
Consulting and Pathway Group to execute an integrated
permitting and government advocacy strategy.
1. ASX:CRR announcement - Maiden Mineral Resource at Mavis Lake - 5 May 2023
2. ASX:CRR announcement - Excellent Results from Metallurgical Test Work - 3 April 2023
3. ASX:CRR announcement - Corporate Presentation 2024 – 8 May 2024
Mavis Lake - Lithium
North American Lithium Resource
5
ASX:CRR
Mavis Lake – Main Zone – looking northeast.
6
MAVIS LAKE - LITHIUM
Infrastructure-advantaged
ASX:CRR
Gullwing
Tot
Mavis Lake
1. ASX:CRR announcement - Maiden Mineral Resource at Mavis Lake - 5 May 2023
7
Mavis Lake - Maiden Resource
Significant growth potential
- Maiden MRE - 8Mt @ 1.07 % Li2O1 included drilling results up
to 30 March 2023, substantial expansion potential.
- +57,000m drilling completed. Updated resource model
being developed.
- Thick, high-grade lithium mineralisation over a ~1.1km
strike, starting from surface.
- Drilling confirmed the discovery of lower mineralised stack,
which remains open up-dip and down-dip.
- Infrastructure Advantage: immediate access to highway
and rail, clean hydro power, providing a lower-cost
development pathway.
ASX:CRR
Mavis Lake main Zone Long Section3
- Exploration Target of 7–10 Mt at 0.3 -1.2% Li₂O1
- Extensive land holding with numerous drill-ready
targets identified - Tot, Gullwing and Corona.
- Exploration standout intercepts2:
• 74.4m @ 1.18 % Li₂O, incl. 32.9m @ 1.81 % Li₂O (MF23-207)
• 20.7m @ 1.21 % Li₂O (MF23-209)
• 41.3m @ 1.25 % Li₂O (MF23-210)
• 41.0m @ 1.18 % Li₂O (MF23-211)
• 50.2m @ 1.28 % Li₂O (MF23-213)
• 55.0m @ 0.95 % Li₂O, incl. 25.85m @ 1.39 % Li₂O (MF23-214)
- Northern Prospects potentially unlock resource growth
and development optionality beyond the Mavis Lake
Main Zone.
ASX:CRR
8
Mavis Lake - Unlocking District Scale
North American Lithium Resource
1. ASX announcement - Mavis Lake Exploration Target Highlights Potential for Large-Scale Lithium Project in North-West Ontario - 22 May 2024
2. ASX:CRR announcement - 2026 Mavis Lake Exploration Programs – 19 January 2026
ASX:CRR
9
- Mineralogy has identified predominantly large spodumene crystals.
- Coarse spodumene mineralisation streamlines processing pathways.
- Heavy Liquid Separation (HLS) delivered spodumene concentrate up to
6.4 % Li2O with very low Fe2O3.
- Test work with HLS and flotation delivered recoveries up to 87 %1.
- Ore sorting amenability trials completed: 150 % Li2O increase for UV sorting
and 98 % waste rock rejection from XRT sorting.
- Bulk ore sorting and DMS test work to strengthen flowsheet design and
economic parameters.
- Hybrid DMS – staged project approach to minimise upfront CAPEX
requirement.
Mavis Lake - Metallurgy
Ready to move to DFS studies
1. ASX:CRR announcement - Exceptional Results From Metallurgical Test Work – up to 87.3% - 3 April 2023
Solid-State Lithium-Ion Battery
Evaluation program
South Dakota - US
ASX:CRR
- Exclusive option with South Dakota School of Mines & Technology
(SDM) to evaluate next-generation solid-state lithium-ion battery
technology.1
- Low-Cost, High-Leverage R&D Model with evaluation program
supported by the American National Science Foundation CEPS.2
- High-temperature solid-state electrolyte delivering improved
stability & thermal resilience for data centres, industrial storage
and defence.3
- Materials and manufacturing workstreams progressing in parallel.
- Integrated value-chain connect with a global network seeking to
secure battery-grade lithium supply. Enhancing optionality across
partnerships, IP generation and commercial pathways.
ASX:CRR
EXCLUSIVE ACCESS TO U.S. SOLID-STATE IP
Advancing the next evolution of lithium-ion batteries.
11
1. ASX:CRR announcement - CRITICAL RESOURCES SECURES EXCLUSIVE OPTION TO EVALUATE NEXT-GENERATION SOLID STATE LITHIUM-ION BATTERY TECHNOLOGY – 18 November 2025
2. ASX:CRR announcement - CRITICAL RESOURCES ACCEPTED INTO U.S. SOLID-STATE BATTERY INNOVATION CENTER – CEPS – 2 February 2026
3. ASX:CRR announcement - SOLID-STATE LITHIUM-ION BATTERY EVALUATION PROGRAM – 11 February 2026
Safer.
No flammable liquid electrolyte.
Higher energy density.
Better power-to-weight performance.
Superior performance.
High-temperature environments - data centres,
defence and industrial grids.
Longer cycle life.
Reduced degradation provides enhanced
reliability.
Faster charging/discharging.
ASX:CRR
Why Solid-State Batteries
Solid-state batteries are safer, higher-energy, and built for high-temperature performance.
12
ASX:CRR
Evaluation Program
Pathway to Validation and Prototypes development
13
Program Framework - Low cost and high-impact
Access world-class solid-state battery researchers and advanced
infrastructure. Guide early prototype validation.
ASE Program - Solid-State Electrolytes
Replacing flammable liquid electrolytes with stable solid-state materials,
expands safety and performance across wide operating temperatures.
DSD Program – Advanced Materials Manufacturing
‘3D Printing’ manufacturing removes the use of toxic solvents providing a
cleaner, more scalable pathway for solid-state batteries.
Application Focus
Improved safety, energy density and cycle reliability, supporting growing
demands from data centres, defence, mining and other high-temperature,
high-reliability applications.
ASX:CRR
High Temperature Electrolytes (ASE)
Expands safety and performance at elevated temperatures
14
CRR Opportunity:
Problem:
High Thermal Sensitivity
Performance and lifespan deteriorate
at elevated operating temperatures.
Thermal Risk
Flammable liquid electrolytes
introduce fire and safety exposure in
high-reliability applications.
High Energy Demands
Ineffective use of energy. ~40 % of data
centre energy is consumed by cooling.1
High Thermal Stability
Engineered for stable electrochemical
performance at temperatures exceeding 60°C.
Non-Fire Hazard
Non-flammable solid-state electrolyte
architecture materially reduces fire and thermal
runaway risk.
Lower Energy Demands
Reduced dependence on active cooling
infrastructure, supporting improved energy
efficiency.
1. Cooling Systems in Data Centers: State of Art and Emerging Technologies -
https://doi.org/10.1016/j.egypro.2015.12.168
Dry-Supersonic Deposition (DSD)
Solvent-free manufacturing pathway for scalable solid-state batteries.
15
Early successful tests of dry-supersonic-deposition (DSD) of Lithium-Iron-Phosphate (LFP)
cathode material onto battery pouch cell aluminium foil substrate.
Core challenge.
Scaling the manufacture of solid-state batteries.
Solvent-free dry deposition.
Supersonic particle deposition creating dense layers.
Eliminates toxic solvents.
Solvent-free processing reduces energy use and supports
scalable manufacturing.
Successful Trials.
Advancing into a structured evaluation program.
Strategic outcomes.
Results to inform prototype development, partnerships
and strategic pathways.
1. ASX:CRR announcement - SOLID-STATE LITHIUM-ION BATTERY EVALUATION PROGRAM – 11 February 2026
ASX:CRR
Evaluation to Prototype Validation
Timeline and milestones for the next phase of development and strategic decisions.
16
Evaluation Phase (Q1-Q2 2026)
Active program at SDM under the NSF-supported
CEPS framework focused on material refinement
and trial validation.
Technical Validation
Completion of electrolyte selection to support trial
cell development and independent third-party
assessment.
Prototype Assembly
Integration of the ASE (chemistry) and DSD (manufacturing)
workstreams into initial prototype solid-state cell assemblies for
laboratory and independent evaluation.
Commercial Positioning
Enhancing optionality across partnerships, IP
generation and future commercial pathways.
The above activities are limited to technical evaluation and do not imply commercial manufacturing.
Outcomes will inform future prototype development and strategic decisions.
ASX:CRR
New Zealand
Gold
Otago & Reefton – South Island
The New Zealand Opportunity
Diverse gold-antimony portfolio to create momentum
- Outstanding exploration potential across a Large-scale gold
portfolio.
- Significant scale opportunity: OceanaGold’s +10 Moz Macraes
operation1. ‘Power of distribution law’ potential with multiple +1 Moz
deposits yet to be discovered within the Otago region.
- Breakthrough discovery at Santana Minerals (ASX:SMI) Rise & Shine
gold deposit has renewed the exploration strategy and materially
upgraded regional targeting models.
- In-Country Support - New Zealand-based geological group, with links
to the discovery and resource growth of the Rise and Shine deposit.
- Extensive landholding: 1,795 km² package covers the underexplored
gold-antimony belts of Otago and Reefton. Low-holding costs.
- Tier-1 jurisdiction: Ranked 12th in the 2025 Fraser Institute Investment
Attractiveness Index, with New Zealand’s ‘Fast Track’ permitting
processes.
ASX:CRR
18
1. Based on OceanaGold Corporation - NI 43-101 Technical Report, Macraes Gold Mine, Otago, New Zealand - March 28, 2024
Cap Burn
Otago Region
- Advanced gold project ~11 km from OceanaGold’s Macraes operation.
- Confirmed gold mineralisation coincident with a large arsenic-in-soil anomaly.
- Structurally analogous to Santana Minerals Rise and Shine - untested at depth.
Silver Peaks
Otago Region
- Large-scale prospect near Macraes, historic Au-Sb structures.
- Underexplored with district-scale potential.
Lammerlaw
Otago Region
- Located on major structural boundary.
- Analogous to Macraes gold system with mapped gold and tungsten trends.
Tokomairiro
Otago Region
- Historical goldfield - high-grade rock chip samples up to 135 g/t Au.
- Multiple reef systems along a broader mineralised trend.
Croesus
Reefton Goldfields
- Located near the Reefton Goldfield, with high-grade gold-antimony veins and
tungsten-rich greisen systems.
- Multiple untested structural targets across a 5 km mineralised corridor.
ASX:CRR
New Zealand Projects
Diverse gold-antimony portfolio to create momentum
19
Silver Peaks
Lammerlaw
Tokomairiro
Cap Burn
Croesus
- Located on a major NW–SE shear corridor. Next to
OceanaGold’s Macraes +10 Moz Au operations.
- Underexplored - Legacy drilling targeted a large
arsenic-in-soil anomaly, validating an orogenic
gold system.
- Multiple historic alluvial gold workings along strike,
highlight prospectivity of the area.
- New structural model leverages Santana Minerals’
Rise and Shine discovery in 20211.
- Multiple drill targets ~10km of strike potential.
- Initial phased drill program completed Dec-20252.
Assay results expected late February 2026.
ASX:CRR
20
1. ASX:CRR announcement 6 August 2025
2. ASX:CRR announcement 22 December 2025
Cap Burn Gold Project
On strike from +10Moz Macraes Operations
Breakthrough factors.
Santana Minerals’ Rise and Shine discovery came from a renewed
structural model, stepping down plunge from surface arsenic-in-soil
anomalies and low-grade mineralisation.
Persistence Pays.
Rise and Shine was discovered (MDD007) in the third exploration
phase1. Committed to drilling through barren cover (TZ3 unit).
Untapped Potential.
Macraes +10 Moz endowment suggests multiple +1 Moz deposits; only
Rise and Shine has been discovered. ‘Power of distribution law’.
Shareholder Opportunity.
Leveraging learnings from Rise and Shine discovery, testing new
geological models through systematic exploration.
TZ3 SCHIST UNIT
TZ4 SCHIST UNIT
Cap Burn Project
2020 drilling
ASX:CRR
Cap Burn – Rise & Shine Analogue
New structural model leverages Santana Minerals’ Rise and Shine discovery
21
1. Santana Minerals Limited (ASX: SMI) Announcement 28 April 2021
Cap Burn Project cross-section(top) – conceptual down-plunge target at Cap Burn with comparison to Santana Minerals Rise and Shine
cross-section (bottom)(Santana Minerals (ASX:SMI) August 2023 investor presentation. slide 9)(note: cross sections are not to the same
scale)
- Multiple priority gold-antimony targets.
- Antimony reported in quartz lodes at several
localities in the Croesus Knob Reefs.
- Modern mining resurgence in Reefton with
Federation Mining Snowy River operations, Rua
Gold (TSX-V: RUA) and Siren Gold (ASX:SNG).
- Proven potential with several historic gold and
antimony mines within the permit area:
- Croesus Reef / Taffy
- Roaring Meg / Garden Gully
- High-grade confirmed with rock chip samples up
to 28.9 g/t Au and 33.8 % WO3
1.
- Long history of mining with established
infrastructure and strong community support.
ASX:CRR
CROESUS – Reefton Region
High Impact Exploration Target
22
1. ASX:CRR announcement 6 August 2025
Halls Peak Project
Gold - Antimony - Base metals
NSW - Australia
ASX:CRR
- Scale potential. ~2 km mineralisation corridor1.
- High-grade surface rock samples - 17.9 g/t Au,
0.7 % Sb and 53.2 g/t Ag2.
- ~19 km SE of Larvotto’s (ASX:LRV) Hillgrove
antimony-gold operations and ~14 km E of
Koonenberry Gold (ASX:KNB) Enmore Project -
same structural corridor.
- Orogenic Au/Sb system potential – Petrographic
identified structurally controlled quartz–sulphide
veining3.
- Airborne mag identified multiple structures.
Strong correlation with soil-geochemistry.
- Maiden drill program confirmed orogenic
system with strong multi-element, gold up to 0.38
g/t Au, silver up to 22.7 g/t Ag.
Amoco – Au/Sb
High-grade orogenic gold-antimony system potential
ASX:CRR
24
1 ASX:CRR announcement 18 September 2025
2 ASX:CRR announcement 4 June 2025
3 ASX:CRR announcement 2 July 2025
4 ASX:CRR announcement 18 September 2025
- Located adjacent to Larvotto Resources Limited (ASX:LRV)
Hillgrove antimony-gold operations.
- Depressed antimony markets and extended ownership have
resulted in a lack of modern exploration activity in the area.
- Numerous historical antimony workings, defining a structural
corridor and an immediate exploration target.
- High-grade rock samples from old antimony workings
demonstrate a fertile corridor 1:
- 52.3 % Sb (MVS17)
- 38.3 % Sb (MVS8)
- 31.8 % Sb (MVS14)
- 15.35 % Sb, 2.71 g/t Au (MVS11)
- 12.45 % Sb, 2.18 g/t Au (MVS18)
- Close to infrastructure and an established mining-friendly
community.
- Applications for soil mapping and a maiden drill program are
advancing, with active discussions for a land access agreement
ongoing.
1. ASX:CRR announcement 16 December 2024 ASX:CRR
Mayview – Au/Sb
Emerging target - Potential Hillgrove-style orogenic antimony-gold system
25
ASX:CRR
Investment Proposition
26
01 04
03
02
Large, low-cost land holdings
of early-stage gold-antimony
projects in Tier-1 geology
and jurisdictions.
Multiple drill targets - High
discovery potential.
Strategically located lithium
resource in Ontario, Canada
with immediate access to
world-class infrastructure
and simple metallurgy.
Low-cost workstreams
underway to de-risk and
add long-term value.
Evaluation of next-generation
solid-state lithium-ion battery
IP in the U.S. Access to
low-cost, high-leverage R&D
model.
Enhancing optionality across
partnerships, IP generation
and commercial pathways.
North American Lithium
Resource.
Shareholder alignment.
Exposure to upstream
lithium battery technology.
Exceptional pipeline of gold
and antimony projects.
Proven leadership, creating
shareholder value across
multiple commodities and
industries.
Directors and Management
hold 11.0 % of CRR.
COMPLIANCE STATEMENT
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project, extracted from the Company’s ASX announcement dated 5 May 2023. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply. The Mavis Lake MRE
includes all applicable drilling results up to and including 29 March 2023. The Mavis Lake MRE has been reported at a cut-off grade of 0.3% Li2O and an open-pit mining scenario. A Bulk Density of 2.8 has been used for mineralised pegmatite.
Estimation has been completed using inverse distance weighting. Resource classification is according to the JORC Code Mineral Resource categories.
This document contains information relating to the Mineral Resource estimate for the Halls Peak Project, which is extracted from the Company’s ASX announcement dated 30 June 2023. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply. The Halls Peak MRE has
been reported at a cut-off grade of 2% zinc and an open-pit mining scenario. This yields a total metal value that is potentially economically viable for open-pit mining. The MRE incorporates the reasonable prospects for eventual economic extraction
assumed for open-pit mining. Resource classification is according to the JORC Code Mineral Resource categories.
This document contains information on the Cap Burn, Silver Peaks, Lammerlaw, Tokomairiro, Croesus and Rock and Pillar Projects extracted from ASX market announcements dated 6 August 2025, 8 September 2025, 10 September 2025, 4 December
2025 and 22 December 2025 reported in accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original ASX market announcement.
This document contains information on the Halls Peak Project extracted from ASX market announcements dated 22 November 2021, 30 June 2023, 28 August 2024, 12 September 2024, 3 October 2024, 8 November 2024, 19 November 2024, 4
December 2024, 16 December 2024, 12 February 2025, 20 March 2025, 4 June 2025, 2 July 2025, 18 September 2025, 1 October 2025, 13 October 2025 and 5 December 2025 reported in accordance with the 2012 JORC Code and available for
viewing at www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in any original ASX market announcement.
This document contains information on the Mavis Lake Project extracted from ASX market announcements dated 25 October 2021, 16 June 2022, 21 July 2022, 13 September 2022, 24 October 2022, 25 October 2022, 31 October 2022, 20 December
2022, 29 December 2022, 23 January 2023, 9 February 2023, 27 March 2023, 3 April 2023, 18 May 2023, 16 June 2023, 27 June 2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023, 24 October 2023, 2
November 2023, 15 November 2023, 13 February 2024, 18 March 2024, 17 April 2024, 2 May 2024, 22 May 2024, 29 May 2024, 2 July 2024, 8 July 2024, 24 July 2024, 22 August 2024, 28 October 2024, 30 October 2024, 2 December 2024, 27 June 2025, 25
August 2025, 3 November 2025 and 27 November 2025 reported in accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original ASX market announcement.
All announcements are available for viewing at the Company’s website www.criticalresources.com.au.
Mineral Resource Statement
27
Halls Peak Project
JORC Classification
Zn Cut-Off grade (%) Tonnage (Mt) Zn (%) Pb (%) Cu (%) Ag ppm (g/t) Au ppm (g/t)
Indicated - - - - - - -
Inferred 2.0 0.84 3.7 1.5 0.44 30 0.1
Total* - 0.84 3.7 1.5 0.44 30 0.1
Mavis Lake -Lithium Project
JORC Classification
Li2O Cut-Off grade (%) Tonnage (Mt) Li2O (%)
Inferred 0.3 8.0 1.07
Total* 8.0 1.07
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated block model, with blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to the ASX:CRR
announcement 30 June 2023.
Mavis Lake Lithium Project - Mineral Resource Estimate
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting. Classification is according to JORC Code Mineral Resource categories. Refer to ASX:CRR announcement 5 May 2023.
Halls Peak – Gibson Base Metals Project - Mineral Resource Estimate
ASX:CRR
www.criticalresources.com.au
Share your feedback
Discover