Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
30 April 2025
March 2025
Quarterly Activities Report
Highlights
•
Antimony-Gold Exploration Success: new key findings received across the expansive Halls Peak project
area, significantly adds to recent sampling, desktop and geophysical findings, further enhancing the
Company’s multi-prospect geological model whilst identifying numerous additional Antimony-Gold
targets at the Mayview, Gibsons and the Amoco Grid prospects
•
Interpretation of Geophysical Survey Unlocks New Targets and Structural Corridors: Interpretation of
previously completed geophysical data has identified over 30 new targets across the Gibsons and
Amoco Grid prospect areas and revealed previously unrecognized structural corridors with the
potential to host significant gold-antimony mineralisation at the Hall Peak Project, significantly
enhancing exploration opportunities.
•
Potential for Multiple Mineralisation Styles: reinterpreted surveys suggest that the Gibsons prospect area
may host both Hillgrove-style gold-antimony mineralisation in addition to the mineralisation associated
with base metal systems.
•
Petrography Identified Widespread Veining & Brecciation: Mayview prospect samples (which previously
returned high-grade Antimony results of up to 52.3% Sb and 2.71 g/t Au) show significant hydrothermal
quartz veining, with textures characteristic of shallow mesothermal to epithermal environments,
indicating a structurally controlled mineralising system.
•
Comparison to Hillgrove Deposit: The Mayview textural and mineralogical characteristics of the quartz
infill in veins identified as similar to observed stibnite-bearing hydrothermal infill Sb-Au quartz at the LRV’s
Hillgrove mineralised system, reinforcing Mayview's potential for further exploration and development.
•
Tenure Extension: Halls Peak project exploration licenses 4474 and 7679 renewed for a further 6 and 4
years, respectively.
•
Exploration Advances: The Company, with the engagement of a highly experienced technical team,
continues its Antimony-Gold exploration efforts to delineate mineralisation, assess and prioritise target
areas and advance preparation for advanced exploration permit submissions at Mayview and Gibsons
target areas.
•
Board Appointment: Mr. Bilal Ahmad was appointed as Non-Executive Director and Chairman, Mr
Joshua Gordon appointed Non-Executive Director of the Company, bringing valuable experience to
the board.
•
Project Portfolio: The Company continues to evaluate potential gold and silver value-adding
opportunities in Tier-1 jurisdictions globally with the aim to expand its asset portfolio.
Overview
Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased to report
on its activities for the quarter ended 31 March 2025 (“the Quarter”). Throughout the period, the
Company focused on the highly prospective Halls Peak Project, located adjacent to Australia’s
reported largest antimony deposit, the Hillgrove Antimony-Gold Project, near Armidale in New
South Wales, as well as its Lithium asset in Ontario Canada.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
The Company remains committed to advancing exploration efforts across its highly prospective
portfolio, seeking to unlock value from critical mineral resources essential for a sustainable future.
Operational Activities
Halls Peak Project – New South Wales, Australia
During the Quarter, the Company announced the results of a comprehensive geophysical review
and airborne magnetic interpretation over the Gibsons and Amoco Grid prospects, together with
highly encouraging petrographic analysis conducted on eight high-grade rock samples collected
from the Mayview prospect, located southeast of Hillgrove.
New key findings received during the Quarter, across the expansive Halls Peak project area,
successfully enhances the Company’s multi-prospect geological model, has led to the
identification of numerous additional Antimony-Gold targets at the Mayview, Gibsons and the
Amoco Grid prospects and further supports the suggestion that the Halls Peak Project may host
both Hillgrove-style gold-antimony mineralisation in addition to the mineralisation associated with
base metal systems, significantly increasing the project's potential.
In addition to the activities highlight above, the Company, with the engagement of a highly
experienced technical team, continues its Antimony-Gold exploration efforts to delineate
mineralisation, assess and prioritise target areas and prepare for an advanced exploration permit
and drilling submissions at Mayview and Gibsons target areas.
The Mayview prospect is strategically located in the highly prospective New England Fold Belt,
notable for hosting Larvotto Resources Hillgrove Antimony-Gold Project, reported as Australia’s
largest antimony-gold system. CRR’s Mayview Prospect is contiguous to the southern and
southeastern boundaries and is situated approximately 2.7 km east of the Hillgrove project.
In February, CRR provided an update of the Company’s Mayview program and recent
petrographic studies on the exceptionally high-grade antimony values discovered during the
earlier sampling program at the Mayview prospect, within CRR’s broader Halls Peak Project.
During the Quarter, the Company completed a detailed petrographic study on eight rock chip
samples from the Mayview prospect. The analysis, performed by Paul Ashley Petrographic and
Geological Services, confirmed the presence of extensive quartz-sulphide veining, hydrothermal
brecciation, and significant supergene antimony mineralisation.
These petrographic findings further build on the exceptional field work assay results announced on
16 December 2024, which confirmed high-grade antimony (Sb) and gold (Au) mineralisation at
the Mayview Prospect, part of the Halls Peak Project.
Earlier Key Assay Highlights include:
• 52.3% Sb – Sample MVS17
• 29.7% Sb – Sample MVS6
• 38.3% Sb – Sample MVS8
• 15.35% Sb & 2.71 g/t Au – Sample MVS11
• 31.8% Sb – Sample MVS14
• 12.45% Sb & 2.18 g/t Au – Sample MVS18
Page 2 of 13
Recent exploration results confirm the presence of high-grade antimony and gold mineralisation,
with some samples exceeding 50% Sb, along with notable gold grades. The assays, combined with
recent petrographic work, and historical data from the Geological Survey of New South Wales,
reinforce Mayview’s potential to host substantial mineralisation, similar to the Hillgrove Project.
Key findings from the petrographic study included:
(a) Widespread Veining & Brecciation: Evidence of a Structurally-Controlled Hydrothermal System;
that quartz veining and hydrothermal brecciation are extensive across the sampled areas.
These quartz veins display inequigranular to prismatic textures, comb textures, and crystal-lined
voids, which are characteristic of mineral deposition at shallow mesothermal to epithermal
depths.
(b) Strong Antimony (Sb) Mineralisation with Widespread Supergene Alteration Several samples
contain relic stibnite, a primary Sb-bearing sulphide, but most of it has been overprinted by
supergene alteration, resulting in the formation of Sb oxide minerals, including cervantite and
senarmontite. These oxides are typical of weathered antimony deposits and demonstrate
significant potential for primary sulphide mineralisation at depth.
(c) Presence of Primary Sulphides (Arsenopyrite, Pyrite, and Stibnite) Suggests Potential for Deeper,
Untested Sulphide Zones Although supergene oxidation has destroyed most primary sulphides,
traces of arsenopyrite, pyrite, and stibnite are still preserved in some samples, encapsulated
within vein quartz. These findings suggest potential that deeper, unweathered portions of a
system could contain preserved sulphide mineralisation
(d) Comparison to the Hillgrove Sb-Au System Strengthens Mayview’s Exploration Potential The
mineralogical and textural characteristics of the Mayview samples closely resemble the
Hillgrove Sb-Au deposit, a historically significant antimony-gold mining operation in New South
Wales. The presence of stibnite-rich veins with arsenopyrite and quartz textures typical of
mesothermal to epithermal systems aligns well with known mineralisation styles at the Hillgrove
site, located just some 2.7 km Northwest of the Mayview prospect
Page 3 of 13
Figure 1: Halls Peak Project Area including the Mayview Homestead showing located proximal to
Hillgrove Mine.
Figure 2: Sample locations at Mayview Homestead Prospect. Located proximal to Larvotto
Resources’ Hillgrove Mine Property and 2.7km from the mine site.
Page 4 of 13
In March, CRR provided an update of the Company’s Gibsons and Amoco Grid prospects
program announcing results of a successful comprehensive geophysical review and airborne
magnetic interpretation study on the high-grade antimony, gold and silver values discovered
during earlier geological reviews of the previous drilling and field work campaigns carried out at
these prospects, within CRR’s broader Halls Peak Project.
The study, conducted by Eureka Consulting Pty Ltd, covering exploration licences EL 4474, 7679
and 9293 (under agreement), has successfully identified significant structural features that are
highly prospective for gold-antimony mineralisation, aligning with a Hillgrove-style system.
The reinterpretation of aeromagnetic data, which was initially designed to target massive base
metal sulphide mineralisation, has highlighted structural complexities that provide ideal conditions
for gold-antimony mineralisation. These systems are believed to have been superimposed onto the
existing Permian sedimentary package, which hosts high-grade Zn-Pb-Cu-Ag-Au mineralisation, as
evidenced by previously discovered massive sulphide lodes.
This finding significantly expands the exploration potential at this prospect area by introducing a
secondary mineralisation style beyond the established base metal systems.
Identification of Major Fault Structures and New Gold-Antimony Targets
The aeromagnetic survey has outlined a network of major fault structures interpreted as key
conduits for hydrothermal activity responsible for Hillgrove-style gold-antimony mineralisation.
These faults, trending NE-SW and NW-SE, align with historical mineralised trends and known goldantimony occurrences, closely resembling the structural framework at the Hillgrove deposit.
The reinterpretation has refined the location and orientation of previously known faults while
identifying secondary and splay faults. Cross-cutting relationships between major and minor faults
suggest zones of increased deformation and fluid interaction, prime areas for gold-antimony vein
systems. Advanced filtering techniques (First Vertical Derivative, Tilt Derivative, and Edge
Detection) have also identified magnetic discontinuities indicative of deeply rooted structures,
potentially associated with major lithological contacts or intrusive events influencing
mineralisation.
Up to 36 high-priority exploration targets have emerged from the study within faulted zones that
likely served as mineralising conduits. Structural intersections, known to host gold-antimony
mineralisation in similar settings, display intense magnetic variations, suggesting alteration zones.
Additionally, underexplored fault blocks with magnetic anomalies indicative of hydrothermal
activity have been identified for ground-truthing, geochemical sampling, and potential drill
testing. Some faults extend beyond previously mapped limits, expanding the prospective ground
at Halls Peak and warranting further structural mapping and surface sampling.
Page 5 of 13
Figure 3: RTP Magnetics with known mineralisation overlaid as red symbols.
Page 6 of 13
Figure 4: Location of 36 exploration targets over RTP magnetics.
Enhanced Geological Understanding of the Gold-Antimony System at Halls Peak
Recent geological and geophysical studies at Halls Peak have significantly advanced the
understanding of its gold-antimony mineralisation. Reprocessed aeromagnetic data and structural
interpretations suggest that the mineralisation is strongly controlled by deformation events, with
key fault structures playing a crucial role in metal deposition. Additionally, the recognition of an
alternative mineralisation style highlights the potential for late-stage Hillgrove-style gold-antimony
systems, further expanding the exploration model for the area.
Improved Structural Interpretation
Reprocessed aeromagnetic data has provided a clearer geological framework, enhancing
the understanding of mineralisation at Halls Peak.
•
The Hillgrove-style gold-antimony system is now recognized as being strongly structurally
controlled, with mineralisation linked to key deformation events.
•
The alignment of historically mapped gold-silver-antimony occurrences within interpreted
fault zones further validates the aeromagnetic interpretation.
•
Page 7 of 13
Recognition of Alternative Mineralisation Style
A key development from this recent study is the recognition of a different style of mineralisation,
indicating the potential for late-stage Hillgrove-style gold-antimony systems. These systems are
thought to have been superimposed onto the Permian sedimentary package that hosts highgrade Zn-Pb-Cu-Ag-Au mineralisation, as evidenced by massive sulfide lodes already discovered
by the Company. The proposed system comprises large orogenic gold-antimony fault vein and
quartz stockwork-breccia mineralisation, believed to have formed within deep-seated fault
structures extending for hundreds of meters.
Interpreted Structures Coincident with Anomalous Au and Sb Discovered in the Amoco Grid
Geochemical data for gold rock chip samples have been overlayed on the interpreted structures.
This has provided a number of focused targets to be examined and sampled on the ground where
Amoco gold anomaly data plots on major structures. These intersections could potentially host
gold clustering, along structures, and especially when structures intersect. The Amoco Grid hosts
highly anomalous rock chip and soil samples, over a length of over 1,000 metres from east to west,
with elevated gold mineralisation at 17.9g/t, 12.9 g/t and 10.4 g/t, antimony at 0.53% and silver at
80g/t.
Figure 5: Project Location map showing proximity to significant Antimony-Gold projects in the
region.
Mavis Lake Lithium Project – Ontario, Canada
Recent drilling at the Mavis Lake Main Zone has continued to confirm thick, high-grade
spodumene mineralisation, continuing to add and build on the Company’s highly successful earlier
drilling campaigns. Following on from the conclusion of the Company’s outstanding exploration
programs completed in 2024, the Company focused on the compilation and review of its
exploration and resource growth drilling in and around the Mavis Lake Project (“Mavis Lake”),
Ontario Canada. Limited exploration activities were conducted on the ground during the Quarter.
Located in immediate proximity to utilities, services and transport infrastructure essential to support
a future mining operation, Mavis Lake is well positioned to become a long-term supplier of lithium
products to North America’s rapidly growing battery minerals and electric vehicle sector.
Page 8 of 13
Notably assay results from the recent drilling campaign at Mavis Lake Main Zone area delivered
significant intercepts including of 34.9 meters grading 1.02% Li₂O from a depth of 131.55m in
spodumene-bearing pegmatite (MF24-248). Alongside its successful results, additional drilling
during 2024 confirmed southern extensions of Pegmatites 7 and 24 through MF24-249 and MF24256, confirming that spodumene-bearing pegmatites extend further southward and remain open
for future exploration, highlighting the growth potential of these zones. A particularly recent
notable result include MF24-261, which tested the down-dip extension of the South Zone and
delivered 10m @ 1.56% Li₂O down-hole. This intercept was significant because it provides
suggestion that pegmatites increase in thickness at depth. Additionally, this result extends the strike
length of the South Zone mineralisation towards the north, making it a high-priority target for future
drilling
The continued discovery of near-surface, high-grade lithium mineralisation is expected to have a
positive impact on future development studies. With a growing resource base, expanding
exploration targets, and multiple new discoveries, Mavis Lake is positioned as a leading lithium
project in northwestern Ontario, with strong potential for future resource growth and development.
Figure 6: Plan Map of the Mavis Lake Lithium Project Precinct.
Vermillion Bay Project – Ontario, Canada
With the Company focusing on the Halls Peak Project, limited exploration activities were
conducted during the Quarter.
Graphic Lake Lithium Project – Ontario, Canada
With the Company focusing on the Halls Peak Project, limited exploration activities were
conducted during the Quarter.
Page 9 of 13
Sohar Block 4 and 5 Project – Sultanate of Oman
No field exploration activities were completed during the Quarter. As previously advised, the
Company was advised by the Ministry of Energy and Minerals, Sultanate of Oman, (Ministry) that
the Block 5 mining licences (Mining Licences had been extended to early September and requiring
the Company to provide additional reports with respect to the mining licenses. The Company
indirectly retains a majority shareholding and associated asset interests in Al Fairuz Mining (AFM)
LLC and Al Thuraya Mining (ATM) LLC, the Company will engage in discussions with the in-country
management regarding the future of the projects
Schedule of mineral tenements
The Company’s tenement and claim schedule can be seen in Appendix 1.
Finance
Exploration Expenditure
The Company invested approximately AUD552k (unaudited) in exploration activities across its
project portfolio during the Quarter, the majority applied focused on previous years drilling
activities at Mavis Lake and Hall Peak exploration programs.
Cash Position
The Company held cash and cash equivalents of AUD2.1m (unaudited) as at 31 March 2025.
Capital Raising
On 31 March 2025, the Company announced a capital raising of $1.1 million (before costs) through
the placement of 275 million ordinary shares at an offer price of $0.004 per share (“New Shares”),
together with a 1-for-4 free attaching option exercisable at $0.008, with a three-year expiry (“New
Options”) (“the Placement”).
Tranche 1 of the Placement settled on 24 April 2025 raising $600,000 (before costs), with the
remaining tranche to raise $500,000 (before costs), to be issued subject to shareholder approval
at the annual general meeting of shareholders to be held on 30 May 2025.
The proceeds from the Placement will be used towards advancing exploration activities at the
Company’s existing projects, working capital, and evaluating potential complementary mineral
projects. There is no certainty that current activities will result in new acquisitions.
Other Disclosure
As disclosed under item 6 in the Appendix 5B, the Company made payments to related parties for
a total consideration of AUD$8k. This consideration relates to payments attributable to routine
Director fees, salaries and statutory superannuation
Business Development
The Company continues to evaluate multiple gold and silver opportunities globally. As it looks to
increase its exposure to other asset classes, the Company looks forward to updating the market as
any discussion progress. There is no certainty that current discussions will result in new project
acquisitions.
Page 10 of 13
Corporate Activity
During the Quarter, the Company announced a number of changes to its Board of Directors
strengthening the Company’s leadership. Mr Bilal Ahmad was appointed as Non-Executive
Director and Chairman (effective 28 February 2025) and Mr Joshua Gordon was appointed NonExecutive Director of the company (effective 12 March 2025).
Messer’s Ahmad and Gordon bring extensive leadership experience across the mining, resources,
and corporate sectors, with proven track record of driving strategic growth and delivering
shareholder value. Their appointment strengthens the Company’s leadership framework and
enhances its ability to navigate the next phase of exploration and project development,
particularly as Critical Resources advances the Halls Peak Project and other key assets.
At the same time, the Company announced the resignation of Mr. Robert Martin as Chairman and
Non-Executive Director (effective 28 February 2025). Throughout his tenure, Mr Martin has been a
valued member of the Board providing valuable insights and guidance to the Company as a nonexecutive chairman, and we wish him all the best in his future endeavours.
These Board changes position Critical Resources with a refreshed leadership team, aligned to
support its strategic focus on advancing its critical minerals portfolio.
A General Meeting of Shareholders of Critical Resources was held in Perth on 16 January 2025. All
Resolutions put to the General Meeting of the Company were passed by a poll.
The Company continues to canvas the market for candidates to fill the position of Chief Executive
Officer. The Company’s board will continue to assume day-to-day management functions until a
suitable candidate is found.
Key ASX Announcements during the Quarter and since
24 April 2025
14 April 2025
8 April 2025
31 March 2025
31 March 2025
20 March 2025
12 March 2025
28 February 2025
14 February 2025
12 February 2025
16 January 2025
Capital Raising Completed & Section 708A(5) Notice
Strategic Engagements to Advance NSW Gold Antimony Project
2025 AGM Details
Annual Report to shareholders
Successful Placement to raise $1.1 million
Geophysical Survey Identifies Multiple Gold-Antimony Targets
Appointment of Director
Board changes
Capital Raising Completed & Section 708A(5) Notice
Encouraging Petrographic Results from the Mayview Prospect, NSW
Results of Meeting
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Page 11 of 13
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future. The Company’s Mavis Lake Lithium Project in Ontario, Canada,
where it has completed over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07%
Li2O. Recent exploration success has demonstrated substantial potential to expand this resource and make new
discoveries in the surrounding area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource
growth in parallel with multiple permitting and project development workstreams.
The Company’s Hall Peak Base Metals Project is located 87km south-east of Armidale New South Wales, Australia, a
reginal hub in New South Wales. The Company has defined a maiden Inferred Mineral Resource of 884,000t grading
3.7% zinc, 1.5% lead, 0.4% Copper, 30ppm Silver and 0.1ppm Gold has been estimated following numerous drilling
campaigns. Modelling has shown that mineralisation is still open along strike to the east/north-east and west/southwest, providing immediate potential to increase the MRE with follow-up drilling.
COMPLIANCE STATEMENT This announcement contains information on the Halls Peak Project extracted from ASX market
announcements dated 22 November 2021, 30 June 2023, 28 August 2024, 13 September 2024, 3 October 2024, 8
November 2024, 19 November 2024, 4 December 2024, 16 December 2024, 12 February 2025 and 20 March 2025
reported in accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the information included
in any original ASX market announcement.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from
ASX market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available
for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
Halls Peak Project
Zn Cut-Off
Tonnage
JORC
Zn (%)
Pb (%)
Cu (%)
Ag ppm
Au pm
SG (calc)
grade (%)
(Mt)
Classification
Inferred
2.0
0.84
3.7
1.5
0.44
30
0.1
2.80
Total*
Inferred
0.84
3.7
1.5
0.44
30
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated
block model, with blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to ASX
announcement 30 June 2024.
This announcement contains information on the Mavis Lake Lithium Project extracted from ASX market announcements
dated 25 October 2021, 21 July 2022, 25 October 2022, 31 October 2022, 20 December 2022, 27 March 2023, 16 June
2023, 27 June 2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023
24 October 2023, 15 November 2023, 13 February 2024, 18 March 2024, 17 April 2024, 2 May 2024, 22 May 2024, 29 May
2024, 2 July 2024, 8 July 2024, 22 August 2024, 28 October 2024, 30 October 2024 and 2 December 2024 reported in
accordance with the 2012 JORC Code and available for viewing at www.criticalresources.com.au.
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012
JORC Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and
have not materially changed.
JORC Classification
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
Inferred
Total*
0.3
Inferred
8.0
8.0
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting.
Classification is according to JORC Code Mineral Resource categories. Refer to ASX announcement 5 May 2023, 8.0 Mt at 1.07% Li2O
Maiden Mineral Resource at Mavis Lake.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied,
as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this announcement.
Page 12 of 13
Appendix 1 – Schedule of mineral tenements at 31 March 2025
Claim Number
Project /
Location
Acquired
Interest
during
quarter
Disposed
interest
during
quarter
Interest at
end of
Quarter
101034, 101215-101218, 101616-101619, 101758, 102759, 103512,
107330-107331, 107432, 107452-107454, 109871, 110434, 110703,
116242-116243, 116376, 116481, 116833, 117689-117690, 121130,
122424, 123068, 124332, 126738, 128065, 128770, 129509, 130111,
130299-130330, 135026, 135728, 138331, 138446, 139468-139470,
139609-139610, 140299, 141103, 141801, 143041, 143046-143047,
144330, 144441, 145544-145546, 145568, 145570-145572, 151583151585, 151642,157160- 157161, 158448, 158546, 158921, 160267,
160902, 166897, 167079-167080, 167677, 168187-168188, 168229,
168328-168329, 170252, 174132-174134, 174153, 176105, 176198,
179416-179418, 179741-179743, 180192, 108489, 181000, 181037,
182187, 183051-183052, 186194, 187649, 188359, 189624, 190960190961, 191576, 192111-192112, 192114-192115, 192814, 195537,
196153- 196154, 196277 – 196278, 197591, 198244-198246, 199857,
201802, 203140-203142, 203594, 203763, 204202, 204223-204224,
205589, 205676, 207864, 209134-209136, 210239, 210345-210347,
210370, 210372-210374, 210439, 211060-211061, 212294-212295,
214215, 215413, 215824, 216365-216366, 217064, 218430, 227456227457, 228108, 228777-228778, 229375, 229402-229404, 230161230162, 231619-231620, 233613-233614, 233867, 234258 ,234948,
235582, 239067, 240149, 240258, 240281, 240947, 246549, 247620,
248263- 248265, 248968, 253509-253510, 254970, 256451-256452,
256960, 257849, 257852, 259169, 259285, 262170, 262949, 264260,
264285, 266452, 267141, 268289, 270261, 270910, 271534, 271591,
272225-272226, 273079, 273609, 274526, 275823-275825, 278758,
280340, 281841, 282015, 282234-282235, 283653-283655, 284320284321, 285690- 285691, 286761-286763, 287377, 287379, 287408,
289910, 290059- 290060, 290357, 290972, 291666-291667, 292149,
295414-295418, 296097, 296098, 302230, 303032, 303733-303734,
305020-305022, 306990, 307466- 307467, 308112, 308122, 308140308141, 310379- 313380, 312334, 314170-314171, 314748, 314826314827, 316293- 316294, 316
Share your feedback
Discover