Acquisition of New Zealand Gold-Antimony Projects
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
6 AUGUST 2025
Critical Resources secures strategic gold-antimony
footprint in Tier-1 jurisdiction - New Zealand.
Drill-ready Cap Burn project ~11km along strike from +10Moz Macraes Gold Operations.
-
Critical Resources executes two separate binding agreements to create a strategically
significant gold-antimony portfolio centred in the Otago Region of New Zealand’s South Island.
-
The established Otago gold region hosts New Zealand’s largest gold mine, OceanaGold
(TSX:OGC) +10Moz Macraes gold mine 1, and has seen a renewed exploration focus with the
modern discovery of Santana Minerals' (ASX:SMI) +2.3Moz Bendigo-Ophir Gold Project 2.
-
Gold-Antimony portfolio includes the advanced drill-ready Cap Burn exploration permit and
four prospecting permit applications - Silver Peaks, Lammerlaw, Tokomairiro and Croesus.
-
Cap Burn is located ~11km from Macraes on the same structural corridor and is drill-ready with
land access in place, enabling immediate exploration once the transaction is complete.
-
Previous exploration drilling targeted a highly elevated surface arsenic anomaly, confirming
gold mineralisation. A revised geological model analogous to Santana Minerals’ Rise and Shine
discovery remains untested.
-
Prospecting permits applications - Silver Peaks, Lammerlaw, Tokomairiro, and Croesus Projects
targeted due to historical gold and antimony mining activities and high-grade surface samples.
-
Critical has partnered with New Zealand-based geological group, with links to the early
discovery and resource growth period of Santana Mineral’s Rise and Shine discovery.
-
Creation of strategic land portfolio provides a low-cost entry into an established goldproducing region supported by New Zealand’s pro-investment “Fast-Track” reforms.
Critical Resources Limited (‘Critical Resources’ or the ‘Company’, ASX:CRR) is pleased to announce to
shareholders that it has entered into two separate binding agreements to acquire 100% of Cap Burn
exploration permit - EP60300 and acquire 90% ownership of four prospecting permit applications across the
Otago and Reefton regions in the South Island of New Zealand (Figure 1).
Critical Resources’ Chief Executive Officer, Mr. Tim Wither, commented ‘The Company is excited to execute
the New Zealand acquisitions, which deliver immediate geological upside, complementing our existing gold
and antimony portfolio with advanced drill-ready targets in a highly supportive jurisdiction. With gold and
antimony forming the core of our current commodity focus, we see the creation of the strategic goldantimony portfolio in New Zealand as a low-cost, high-impact growth lever for shareholders.
1 Based on OceanaGold Corporation - NI 43-101 Technical Report, Macraes Gold Mine, Otago, New Zealand - March 28, 2024
2 Santana Minerals Limited ASX:SMI Announcement – 4 March 2025 - RAS Mineral Resource Estimate Review.
Critical Resources Limited – www.critical resources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The Otago region has a rich mining history and is home to OceanaGold’s world-class +10M oz Au Macraes
Operations1. The drill-ready Cap Burn project is situated ~11 km along strike from Macraes on the same
structural corridor. Despite this rich gold production legacy, significant portions of the Otago Schist Belt remain
underexplored. The recent discovery of Santana Minerals’ +2.3 Moz Bendigo-Ophir Project2 has had a
substantial impact on the geological understanding of the Otago region, reaffirming it as one of the most
prospective yet overlooked gold provinces in the Southern Hemisphere.
‘The Company looks forward to progressing the New Zealand projects alongside our NSW Amoco and
Mayview projects. To fast-track the exploration programs across the Critical Resources New Zealand portfolio,
the Company has partnered with a New Zealand-based geological group, with links to the early discovery
and resource growth period of Santana’s Mineral Rise and Shine deposit.
‘Our strategy, once all transactions have been completed, will be to systematically drill test the Cap Burn
target while simultaneously undertaking early low-cost exploration programs across the Silver Peaks,
Lammerlaw, Tokomairiro, and Croesus permits to grow our pipeline of gold and antimony projects.’
Figure 1 - Location of acquired New Zealand projects (Green) with major gold mining projects
Strategic Fit and Shareholder Value
The proposed acquisition of Cap Burn and the broader Otago and Reefton permits (Figure 1) diversifies the
Company's gold and antimony project portfolio, providing immediate exploration opportunities. The projects
are technically robust and strategically located in fertile geology with encouraging exploration upside. For
shareholders, the low-cost acquisitions provide near-term workflow and long-term growth potential. It
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
provides a significant underexplored land position of 1,463 square kilometres with low-holding costs,
while reinforcing CRR’s technically driven approach to discovery and value creation.
Unlocking Value in a Strategic Jurisdiction
New Zealand is rapidly emerging as a premier destination for critical mineral exploration, ranked 12th the Fraser
Institute 2025 Investment Attractiveness Index. The country offers low sovereign risk, a transparent regulatory
framework, excellent infrastructure and community support for responsible resource development. The New
Zealand Government recently passed the Fast-Track Approvals Bill is designed to streamline permitting for
strategic projects, potentially reducing timelines to drilling and discovery.
The Otago and Reefton Regions have a long-standing gold and antimony mining heritage, with modern
operations such as OceanaGold Corporation’s (TSX:OGC) Macraes gold operation and recent discoveries,
like Santana Minerals Limited's (ASX:SMI) Bendigo-Ophir project, reaffirming the geological potential. The New
Zealand Government has committed to doubling mineral exports within the next decade, underscoring its
support for the resource sector, making New Zealand a compelling jurisdiction for long-term investment.
Cap Burn Project
The Cap Burn Project (EP60300)(Cap Burn) is on the northern edge of the underexplored Otago Schist Belt,
situated ~11 km northwest along strike of OceanaGold’s +10 Moz Macraes Mine1 (Figure 2) and ~70 km
southeast of Santana Minerals’ +2.3 Moz Bendigo–Ophir Gold Project2.
Cap Burn is a drill-ready, advanced exploration permit that is underpinned by an established land-access
agreement with a supportive landowner. Regional mapping and airborne geophysics have delineated major
northwest-southeast shear corridors, which are thought to serve as primary conduits for orogenic gold–
antimony mineralising fluids, as seen at the Macraes and Bendigo–Ophir deposits.
Initial exploration across the Cap Burn project defined a >1 km² arsenic-in-soil anomaly (20–150 ppm As)
coincident with a strong EM boundary anomaly interpreted as the trace of the Cap Burn Fault (Figure 3).
Drilling completed in 2021 targeting the arsenic-in-soil anomaly confirmed gold mineralisation hosted in
foliation-parallel shear zones, validating an orogenic model analogous to both the Macraes and Bendigo–
Ophir’s deposits. Structurally, the Cap Burn Fault aligns with Macraes’ Footwall Fault and Bendigo–Ophir’s
Thompsons Gorge Fault.
Santana Minerals’ (ASX:SMI) Rise and Shine discovery (Rise and Shine), announced in April 2021 has emerged
as New Zealand’s most significant gold discovery in four decades, with the discovery drill interception of 16.5
m @ 8.9 g/t Au (incl. 3.2 m @ 24.3 g/t Au) at 111 m (MDD007) (ASX:SMI Announcement 28 April 2021).
The mineralisation at Santana’s Rise and Shine was encountered down-plunge along the Thompsons Gorge
Fault, targeting the down-plunge continuation of elevated arsenic-in-soil anomalies. The high-grade gold
mineralisation is located just below the Textual Zones (TZ) TZ4/TZ3 schist structural boundary, a key structural
and lithologic control on mineralisation. Initial drilling at Rise and Shine intersected shallow, low-grade gold
directly beneath arsenic-in-soil anomalies (Figure 4 lower image) within the TZ4 unit, closely resembling the
early-stage results from the Cap Burn Project.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Figure 2 – Cap Burn Project location ~11km from OceanaGold Macraes Gold Operations with major and minor interpreted
structures.
Figure 3 – Cap Burn Project – legacy drilling targeting arsenic-in-soil anomaly.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Legacy drilling at Cap Burn was completed in December 2020 and targeted an elevated arsenic-in-soil
anomaly (Figures 3 and 4), which shows similar mineralised characteristics to those intersected at the prediscovery at Rise and Shine. Completed drilling at Cap Burn included 9.0 m @ 0.24 g/t Au from 54.0 m
(CBN0003), 1.8 m @ 0.76 g/t Au from 14.2 m, incl. 0.8 m @ 1.28 g/t Au (CBN0004) and 6.0 m @ 0.45 g/t Au from
173.0 m, incl. 1.0 m @ 1.22 g/t Au (CBN0011) (Appendix A - Tables 1 and 2)(ASX:NPM Announcement 3 August
2021).
Figure 4 – Cap Burn Project cross-section(top) – conceptual down-plunge target at Cap Burn with comparison to Santana
Minerals Rise and Shine cross-section (bottom)(Santana Minerals (ASX:SMI) August 2023 investor presentation. slide 9)(note:
cross sections are not to the same scale)
Previous exploration at Cap Burn has created a strong foundation for the ongoing refinement of the
geological model. The maiden drill program commenced in December 2020, targeting arsenic-in-soil
anomalies and structural features. The 2021 drill findings at Rise and Shine provided valuable insights into
structural and lithological controls on mineralisation that could have been applied to guide further exploration
at Cap Burn. However, no subsequent drilling was undertaken at Cap Burn after the Rise and Shine discovery
phase, and the Cap Burn tenement was returned to its vendors during the October 2022 Quarter (ASX:NPM
announcement, 31 October 2022).
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The Cap Burn Project exhibits a closely analogous structural setting to Bendigo-Ophir, with an arsenic-in-soil
anomaly exceeding 1 km² (>150 ppm As) adjacent to the Cap Burn Fault structure (Figures 3 and 5) and
confirmed gold mineralisation within the TZ4 unit. While untested at depth, Cap Burn’s revised geological
model leverages the Rise and Shine discovery approach, targeting down-plunge extensions beneath surface
arsenic-in-soil halos, positioning it as a compelling analogue with strong potential for high-grade mineralisation
down plunge (Figure 4).
Figure 5 – Cap Burn Project – looking northwest along the cap burn fault.
Figure 6 – Cap Burn Project – looking east towards the OceanaGold (TSX:OGC) Macraes gold mine with legacy alluvial
workings surrounding the Hyde township.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The Cap Burn Project is situated within Exploration Permit EP60300, covering approximately 10.5 square
kilometres, with an existing land access agreement in place with a supportive landowner. EP60300 was
granted on March 22, 2017, and expires on March 21, 2027. Under New Zealand’s Crown Minerals Act, the
Cap Burn permit can be extended for a further 4 years or converted to a mining permit following exploration
success. For shareholders, New Zealand's Crown Minerals Act offers stability and predictability, helping to
maintain resource tenure. It encourages responsible resource development and facilitates transitions from
exploration to mining, thereby fostering long-term investment confidence in New Zealand's mining industry.
The Cap Burn acquisition positions shareholders to unlock significant upside, combining a low‑cost, drill‑ready
asset with a compelling structural setting and a robust geochemical footprint. Early drill results have already
delivered encouraging results, warranting expanded exploration. Coupled with a refreshed geological
model—validated elsewhere along the belt—Cap Burn is ideally placed to generate meaningful value for
shareholders.
Figure 7 – Location map of Silver Peaks, Lammerlaw, Tokomairiro prospecting permit applications and the Cap Burn
Exploration Permit in the Otago region.
Silver Peaks Project – Otago Region
The Silver Peaks Project (Silver Peaks) comprises of a single Prospecting Permit Application covering
approximately 499 square kilometres of highly prospective ground in Central Otago, New Zealand, within the
Otago Schist belt — a region globally recognised for its structurally controlled orogenic gold systems. The
permit area encompasses the on-strike extensions of the historic Mt Stoker and Lamb Hill gold–antimony lodes
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
and is strategically located immediately south of the Hyde–Macraes Shear Zone, which hosts OceanaGold’s
Macraes gold mine.
The Silver Peaks Project is underlain by Otago Schist of greenschist facies (TZ4), exhibiting favourable structural
and metamorphic conditions for mesothermal mineralisation. Key geological features within the permit area
include northwest-trending shear zones, sulphide-bearing breccia zones, and quartz veining — all typical of
gold-bearing systems elsewhere in the region.
Historical mining activity and regional geochemical sampling have yielded anomalous gold and antimony
values (BHP Minerals NZ Ltd (1987–1989) MR2515, MR2312); however, large portions of the project remain
untested by modern exploration methods. In addition, prospectivity modelling has highlighted the TZ3–TZ4
contact and associated structures as priority target areas. The Silver Peaks project presents a rare, districtscale opportunity to explore for high-grade orogenic gold deposits within a proven gold belt, using a modern,
multi-disciplinary targeting approach across a largely underexplored tenure.
Lammerlaw Project – Otago Region
The Lammerlaw Project (Lammerlaw) comprises a single Prospecting Permit Application
covering approximately 493 square kilometres, situated on the southern limb of a broad regional
antiform in the southwestern Otago Schist belt. The permit straddles the boundary between the Caples
and Torlesse-derived protoliths, a major tectonic contact that traverses the northern part of the Lammerlaw
application area. This structural break is associated with deformation partitioning, metamorphic contrasts,
and reactivation during multiple tectonothermal events — factors that elsewhere in Otago have
played a key role in localising orogenic gold mineralisation.
Recent studies suggest that the block of Caples Terrane schist on the southwestern side of the Otago Schist is
analogous to the block of Torlesse Terrane schist that hosts the Macraes gold deposits on the northeastern
margin (MacKenzie et al. 2017) (Figure 8). Both blocks underwent lower greenschist facies metamorphism
during the Jurassic and were subsequently uplifted through the brittle–ductile transition in the Early
Cretaceous — a period coinciding with the first and most significant phase of gold mineralisation at Macraes.
Importantly, mineralisation at Macraes is focused along a discrete, low-angle ductile shear zone developed
on the lower limb of a kilometre-scale, late-metamorphic fold. Within and adjacent to the shear, pre-existing
quartz rods and metamorphic fold axes were rotated into parallelism with the structure — a key control on
fluid flow and gold deposition.
The Lammerlaw permit encompasses structurally analogous features, including folded metamorphic foliation,
mapped low-angle shears, and rheological boundaries across greenschist facies schist. The presence of these
structural elements, combined with regional conductivity anomalies and geophysical trends, indicates a
permissive environment for shear zone–hosted mineralisation.
Historical records document hard rock mining within and near the permit area, including antimony and
scheelite (Lime and Marble Ltd (1972; MR2102)), suggesting a polymetallic system with prospectivity for highgrade gold. Despite this, the region remains underexplored by modern methods, with only limited surface
sampling and reconnaissance to date. Together, Lammerlaw’s structural setting, metamorphic history, and
historic mineralisation suggest that the Lammerlaw Project may represent an untested analogue to the
Macraes system, offering a rare opportunity to explore a geologically favourable corridor in one of New
Zealand’s most prospective gold provinces.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Figure 8 – Location exploration permit applications showing blocks of different metamorphic facies and locations of the
major orogenic gold trends (orange), OceanaGold’s Macraes Operations on the northeastern margin. A simplified
geological cross-section (x-x’) shows the general symmetry of the belt and the potential for shear-hosted gold in the
block of lower greenschist facies schist on the southwestern side.
Tokomairiro Project – Otago Region
The Tokomairiro Project (Tokomairiro) comprises of a single Prospecting Permit Application covering
approximately 276 square kilometres located in the southern Otago region, within a geologically favourable
part of the Lower Greenschist Facies Otago Schist. Despite its position within a proven orogenic gold province
and strong gold mining legacy, the Tokomairiro area remains significantly underexplored by modern methods.
Historical mining records document a phase of hard rock gold mining on the Tokomairiro permit between
1874 and 1909, targeting several prominent quartz reef systems, including the Canada Reef (Last Chance
Quartz Mine), Ocean View Reef, and Try Again Reef (Figure 9). Reported grades from these operations ranged
between 2.3 and 25 g/t Au, with total production amounting to approximately 25.7 Koz Au — including 3.54
Koz from the Canada and Ocean View reefs, and 22.2 Koz from the Try Again Reef. (Annual Technical Report
PP60674, Tokomairiro Project. Unpublished Mineral Report MR584) (Figure 9).
These quartz reef systems occur along a northeast-trending deformation corridor defined by shearing, folding,
and metamorphic layering within variably pelitic and quartzofeldspathic schist. Nuggety Gully,
Canada/Ocean View, and Lawson’s reefs lie along strike from one another, indicating the presence of a
laterally continuous mineralised trend (Figure 9). This structural corridor, which has seen limited historical
mining and virtually no modern exploration, represents a high-priority target area.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Recent fieldwork has confirmed the presence of steeply dipping, sulphide-bearing quartz reef structures, with
rock chip assays returning values up to 135 g/t Au (TKRO007) (Appendix A - Table 3). These results highlight
the potential for bonanza-grade mineralisation and reinforce the importance of advancing systematic
exploration into untested parts of the Tokomairiro structural trend.
Although historical antimony workings occur in nearby districts, no targeted exploration for antimony has
been undertaken within the Tokomairiro area, presenting an opportunity to evaluate a polymetallic mineral
system with potential for both gold and antimony. The combination of favourable structural settings with
confirmed high-grade surface mineralisation and a coherent mineralised trend supports the Tokomairiro
Project as a compelling and drill-ready target within one of New Zealand’s most prospective but
underexplored gold provinces.
Figure 9 – Tokomairiro permit application showing location of historic gold working and recent rock samples.
Croesus – Reefton Region
The Croesus Project (Croesus) comprises a single Prospecting Permit Application covering approximately
184 square kilometres, located on the southwestern flank of the Reefton Goldfield in the southern Paparoa
Range — a Tier-1 orogenic gold province within New Zealand’s South Island, with over 2 Moz of historical
production. The Croesus permit area covers a geologically diverse terrain of Greenland Group
metasedimentary rocks intruded by granitic bodies, cut by regionally significant shear zones and fold
structures, and hosting two distinct but spatially associated mineral systems.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
A structurally controlled gold–antimony lode style within the Greenland Group hosts several historical hard
rock workings at Croesus, Garden Gully, Taffy, and Minerva, producing over 4,500 oz of gold at grades up to
17 g/t Au (Appendix A - Table 3). Recent fieldwork has confirmed quartz–sulphide vein systems up to 3 metres
wide, with rock chip assays returning both gold and antimony grades of up to 12 g/t Au and 7.4 % Sb
(Appendix A - Table 3), reinforcing the potential for high-grade orogenic mineralisation along shear zones
and fold hinges (Figure 10).
Gold assay results across the broader Croesus area have returned values up to 28.9 g/t Au (Appendix A - Table
3), with associated anomalous base and high-temperature pathfinder metals. The broader Greenland Group
exposure defines a mineralised corridor exceeding 5 km in length across both areas, with historical workings
and new geochemical anomalies. The best results were recorded at Minerva, Moonlight, Fiddes, and Garden
Gully, with the Upper Moonlight area (including the Fiddes and Moonlight prospects) highlighting multiple
untested structural targets and considered to have significant potential for a gold deposit and has been
defined as a priority target for follow-up exploration.
Figure 10 – Location Map of Croesus prospecting permit applications in the Reefton Goldfields region.
Within the Croesus Permit, a second geological system, characterised by greisen-hosted tungsten
mineralisation is associated with granitic intrusions and their margins. Work completed by Mineral Resources
NZ Ltd (1988) identified extensive scheelite mineralisation, with all rock samples assayed reporting elevated
tungsten values. Standout grades include up to 33.8 wt % W (337,642 ppm) in scheelite-rich quartz rubble from
Granite Creek, and float samples grading up to 21.1 wt % W at Little Granite Creek (Appendix A - Table 3).
Greisenised granites containing thin quartz veinlets returned up to 0.71 wt % W, supporting the presence of a
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
high-grade, intrusion-related tungsten system. Elevated arsenic (up to 1,320 ppm As) was also recorded,
consistent with zoned polymetallic alteration halos (Appendix A - Table 3).
More broadly, greisen-style systems in similar geological settings globally are known to host significant
tungsten, tin, molybdenum, and gold mineralisation, forming through late-stage hydrothermal alteration of
granitic intrusions. These systems typically develop along cupola zones, fracture corridors, and granite–
country rock contacts, offering large-scale, multi-element exploration potential. The presence of altered
granite with confirmed tungsten grades at Croesus highlights an underexplored but highly prospective mineral
system with potential for scale.
The Croesus Project is ideally positioned within an increasingly active exploration corridor. Federation Mining
is developing the nearby Snowy River Project — a revival of the historic Blackwater Mine — while Siren Gold
and Rua Gold continue to advance gold–antimony targets along the Reefton trend. These activities highlight
both the geological fertility and commercial momentum in the region. With two distinct mineral systems —
structurally hosted gold–antimony and high-grade greisen-hosted tungsten — Croesus represents a rare, multicommodity exploration opportunity in one of New Zealand’s most prospective yet underexplored mineral
belts.
Summary of Transactions
The Company’s wholly owned New Zealand subsidiary, Goldfire Resources Limited, has entered into two
separate binding purchase agreements. Under the agreements, the Company proposes to acquire 100%
legal and beneficial ownership of the Cap Burn Exploration Permit (EP 60300) and will acquire 90% legal and
beneficial ownership of the permits 61275.01 – Silver Peaks, 61276.01 - Lammerlaw, 61277.01 - Croesus, and
61278.01- Tokomairiro (Koura Permits). The material terms of the separate transactions are set out below.
Cap Burn Permit (100% CRR)
Under the terms of the agreements with Western Wood NZ Limited, Western Mathew NZ Limited, and Mineral
Rangahau Limited (Cap Burn Vendors), CRR (via Goldfire Resources Limited) will acquire 100% legal and
beneficial interest in the Cap Burn Permit (Table 1) in consideration for granting the Cap Burn Vendors a 1.5%
Net Smelter Royalty (NSR) (0.5% NSR for each Cap Burn Vendor) on future production under industry standard
conditions (Cap Burn Royalty).
Completion of the acquisition of the Cap Burn Permit will be subject to CRR completing due diligence on the
Cap Burn Permit, the parties entering into a royalty deed in relation to the Cap Burn Royalty, the parties
obtaining relevant approvals under Crown Minerals Act in New Zealand and the parties entering into a deed
of covenant in relation to an access agreement.
The agreement with the Cap Burn Vendors otherwise contains other rights and obligations that are considered
standard for a transaction of this nature.
Koura Permits (90% CRR)
Under the terms of the binding sale and purchase agreement with Koura Resources Limited (Koura), CRR has
agreed to acquire a 90% legal and beneficial interest in the Koura Permits (Table 1) in consideration for paying
Koura the following:
-
-
cash consideration of $60,000 within 30 days of completion; and
deferred milestone payments contingent on exploration outcomes and permit conversions as follows:
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
•
•
$150,000 in cash or 37,500,000 CRR shares at the Seller’s election upon the conversion of one of
the Koura Permits into an exploration permit; and
$300,000, in cash or 37,500,000 CRR shares at the Seller’s election, upon CRR announcing to the
ASX, a JORC Mineral Resources Estimate of greater than 250,000 oz of gold (Au) equivalent at a
cut of grade of at least 0.5 g/t Au eq, across the Koura Permits combined.
Completion of the acquisition of the Koura Permits will be subject to CRR completing due diligence on the
Koura Permits, the parties obtaining relevant approvals under Crown Minerals Act in New Zealand and the
parties obtaining all necessary third-party consents and approvals.
CRR is required to incur exploration expenditure of not less than $300,000 across the Koura Permits in the twoyear period following completion.
On completion of the transaction with Koura, a Joint Venture will be formed with CRR (via Goldfire Resources
Limited) holding a 90% interest in the Koura Permits and Koura holding the remaining 10%. Koura will be free
carried until a final investment decision (FID) has been made by CRR to proceed with mine development
after all studies and permits are complete (Free Carried Period). During the Free Carry Period, CRR will be
required to fund all exploration expenditure and will control all Joint Venture activities. At FID, Koura may elect
to convert their interest to a 1.5% NSR royalty or proportionally contributed to joint venture costs.
The agreement with Koura otherwise contains rights and obligations that are considered standard for an
agreement of this nature.
The Company confirms that Western Wood NZ Limited, Western Mathew NZ Limited, Mineral Rangahau
Limited and Koura Resources Limited are not a related party of Critical Resources.
CRR expects to commence field activities following the transfer of the permits and engagement with local
stakeholders and will be updating Shareholders as the transactions progress. CRR expects to complete the
transactions in September 2025.
Table
1 - Critical Resources
New Zealand
gold and antimony tenement
schedule.
Project Name
Region
Permit type
Permit
Size (sq Km)
CRR Ownership
Cap Burn
Otago
Exploration Permit - Granted
EP60300
10.5
100%
Silver Peaks
Otago
Prospecting Permit under application
PPA61275.01
499.0
90%
Lammerlaw
Otago
Prospecting Permit under application
PPA61276.01
493.0
90%
Tokomairiro
Otago
Prospecting Permit under application
PPA61278.01
276.5
90%
Croesus
West Coast
Prospecting Permit under application
PPA61277.01
184.0
90%
1,463.0
Investor Webinar
Critical Resources’ Chief Executive Officer, Mr Tim Wither, will be hosting an Investor Webinar to discuss the
New Zealand acquisitions and the forward strategy, plus discuss upcoming activities across the Company’s
portfolio. If you would like to joi
Share your feedback
Discover