Exceptional 52.3% Antimony Discovery at Mayview
Released
Released
Announcement PDF
ASX Announcement
16 December 2024
Exceptional 52.3% Antimony Discovery at Mayview:
Significant Exploration Breakthrough
Highlights
•
Rock chip samples from the Mayview Homestead Prospect within the Halls Peak
Project have returned high-grade antimony and gold assay results, including:
- 52.3% Sb Sample MVS17
- 38.3% Sb– Sample MVS8
- 31.8% Sb– Sample MVS14
- 29.7% Sb– Sample MVS6
- 20.8% Sb– Sample MVS15
- 15.35% Sb and 2.71 g/t Au – Sample MVS11
- 12.45% Sb and 2.18 g/t Au – Sample MVS18
- 11.2% Sb and 1.13 g/t Au – Sample MVS19
•
Potential Hillgrove-Style System: Located just 2.7 km southeast of Australia's largest
antimony-gold system, the Hillgrove Mine, Mayview is emerging as a potential
Hillgrove-style orogenic antimony-gold system with significant exploration upside.
•
The Company is planning a targeted drilling campaign in 2025 to test extensions of
mineralisation along strike and at depth.
Critical minerals exploration and project development company Critical Resources Limited
ASX:CRR (“Critical Resources”, “CRR” or “the Company”) is pleased to announce the receipt of
high-grade assay results from its recent sampling program at the Mayview Homestead Prospect,
part of the Halls Peak Project.
These results confirm the presence of significant antimony and gold mineralisation, emphasizing
the potential of this prospect to host a Hillgrove-style orogenic antimony-gold system. The
Company remains committed to advancing exploration efforts across its highly prospective
tenement portfolio, unlocking value from critical mineral resources essential for a sustainable
future.
Strategic Location
The Mayview Homestead Antimony Prospect is strategically located within the Company’s
extensive Halls Peak Project, in the highly prospective New England Fold Belt of New South Wales.
This region is notable for hosting Larvotto Resources Ltd’s Hillgrove Antimony-Gold Project, reported
as Australia’s largest antimony-gold system. Situated approximately 2.7 km east of Hillgrove,
Mayview presents an exciting exploration opportunity, with early indications suggesting it could
represent a continuation of the Hillgrove-style orogenic antimony-gold system.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
Significant Assay Results
Historical data from the Geological Survey of New South Wales highlights significant stibnite (Sb₂S₃)
occurrences within fault or shear zones at Mayview, with early assays recording up to 1.55% Sb and
0.13 ppm Au. Recent fieldwork by Critical Resources focused on sampling old workings and waste
piles left by 19th-century miners, uncovering previously overlooked mineralisation. These samples
revealed a system of multi-phase quartz and antimony veins, with visual evidence of oxidized
stibnite (Sb₂S₃) and antimony trioxide (Sb₂O₃) in silicified pelite.
These findings align closely with the assay results from Critical Resources, which confirm high-grade
antimony and gold mineralisation in multiple samples including up to 52.3% Sb in sample MVS17
and 2.71g/t Au in sample MVS11. The strong grades recorded reinforce the potential for Mayview
to host substantial mineralisation similar to the Hillgrove Project. Further exploration, including
trenching and drilling, is planned to define the scale and continuity of these promising zones.
Figure 1: Halls Peak Project Area including the Mayview Homestead showing located proximal to Hillgrove
Mine
Page 2 of 13
Figure 2: Sample locations at Mayview Homestead Prospect. Located proximal to Larvotto Resources’
Hillgrove Mine Property and 2.7km from the mine site.
Next Steps:
The Company plans to undertake further exploration activities, including:
1.
Geochemical Sampling: Additional rock and soil sampling to define the mineralised zones
more clearly.
2.
Mapping and Trenching: Detailed structural mapping and trenching to understand vein
orientation and distribution.
3.
Drilling Campaign: A targeted drilling program in 2025 to test extensions of mineralisation
along strike and at depth.
Nigel Broomham, Non-Executive Director of Critical Resources stated:
"These exceptional assay results from the Mayview Homestead Prospect reaffirm the significant
potential of the Project to host a high-grade, Hillgrove-style orogenic antimony-gold system,"
"With antimony grades of up to 52.3% and gold grades as high as 2.71 g/t, we are excited by the
high-grade mineralisation already evident. These findings position Mayview as a key focus for our
exploration strategy, and we are eager to advance the project in 2025 to unlock its full potential."
Page 3 of 13
References
*1. Open File, DIGS Records, Geological Survey of New South Wales Report: Gilligan, L.B., Brownlow, J.W.,
Cameron R. G., Henley, H. F. & Degeling, P. R., 1992. Dorrigo-Coffs Harbour 1:250,000 metallogenic map SH/5610, SH/56-11: metallogenic study and mineral deposit data sheets, 509pp., Geological Survey of
N.S.W., Sydney.
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact;
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future. The Company’s Mavis Lake Lithium Project in Ontario, Canada,
where it has completed over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07%
Li2O. Recent exploration success has demonstrated substantial potential to expand this resource and make new
discoveries in the surrounding area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource
growth in parallel with multiple permitting and project development workstreams.
The Company’s Hall Peak Base Metals Project is located 87km south-east of Armidale New South Wales, Australia, a
reginal hub in New South Wales. The Company has defined a maiden Inferred Mineral Resource of 884,000t grading
3.7% zinc, 1.5% lead, 0.4% Copper, 30ppm Silver and 0.1ppm Gold has been estimated following numerous drilling
campaigns. Modelling has shown that mineralisation is still open along strike to the east/north-east and west/southwest, providing immediate potential to increase the MRE with follow-up drilling.
COMPETENT PERSON, COMPLIANCE STATEMENT The information in this ASX Announcement that relates to Exploration
Results is based on information compiled by Mr Michael Leu, a Competent Person who is a member of Australian
Institute of Geoscientist (AIG) and the Australian Institute of Mining and Metallurgy (AusIMM) and a consultant of Critical
Resources. Mr Leu has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Leu consents to
the inclusion in this Announcement of the matters based on his information in the form and context in which it appears.
This announcement contains information on the Halls Peak Project extracted from ASX market announcements dated
22 November 2021, 30 June 2023, 28 August 2024, 12 September 2024 and 3 October 2024, 8 November 2024, 19
November 2024 and 4 December 2024 reported in accordance with the 2012 JORC Code and available for viewing
at www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original ASX market announcement.
This information in this ASX Announcement that relates to the Halls Peak Mineral Resource Estimate is extracted from
ASX market announcement dated 30 June 2023 and reported in accordance with the 2012 JORC Code and available
for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
Halls Peak Project
Zn Cut-Off
Tonnage
JORC
Zn (%)
Pb (%)
Cu (%)
Ag ppm
Au pm
SG (calc)
grade (%)
(Mt)
Classification
Inferred
2.0
0.84
3.7
1.5
0.44
30
0.1
2.80
Total*
Inferred
0.84
3.7
1.5
0.44
30
0.1
*Reported at a cut-off grade of 2% Zn for an open pit mining scenario. Estimation for the model is from the generation of a rotated
block model, with blocks dipping 55>330o. Classification is according to JORC Code Mineral Resource categories. Refer to ASX
announcement 30 June 2024.
Page 4 of 13
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012
JORC Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and
have not materially changed.
JORC Classification
Li2O Cut-Off grade (%)
Tonnage (Mt)
Li2O (%)
Inferred
Total*
0.3
Inferred
8.0
8.0
1.07
1.07
*Reported at a cut-off grade of 0.30% Li2O for an open pit mining scenario. Estimation for the model is by inverse distance weighting.
Classification is according to JORC Code Mineral Resource categories. Refer to ASX announcement 5 May 2023, 8.0 Mt at 1.07% Li2O
Maiden Mineral Resource at Mavis Lake.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied,
as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this announcement.
Page 5 of 13
Appendix
Figure 3: Project Location map showing proximity to significant Antimony-Gold projects in the region.
Sample
Easting GDA94 56J
Northing GDA94 56J
Elev. (m)
Sb (%)
Sb (ppm)
Au (ppm)
Ag (ppm)
MVS2
400987
6614278
992
0.0132
132
0.35
0.03
MVS4
400967
6614270
982
0.328
3280
2.65
0.02
MVS5
400980
6614279
992
19.45
>10000
0.1
0.36
MVS6
400980
6614279
992
29.7
>10000
0.35
0.21
MVS7
400980
6614279
992
0.942
9420
0.03
0.06
MVS8
400980
6614277
992
38.3
>10000
0.31
0.74
MVS9
401013
6614191
989
8.8
>10000
0.29
0.29
MVS10
400810
6614320
995
0.797
7970
0.19
0.18
MVS10A
400922
6614238
987
0.0716
716
<0.01
0.03
MVS11
400905
6614288
983
15.35
>10000
2.71
0.77
MVS12
400889
6614309
982
7.36
>10000
0.71
0.44
MVS13
400883
6614303
983
0.737
7370
1.86
0.21
MVS14
400905
6614288
985
31.8
>10000
0.84
0.99
MVS15
400905
6614288
985
20.8
>10000
0.29
0.96
MVS16
400905
6614288
985
27.5
>10000
0.87
0.65
MVS17
400905
6614288
985
52.3
>10000
0.08
0.47
MVS18
400905
6614288
985
12.45
>10000
2.18
0.41
MVS19
400905
6614288
985
11.2
>10000
1.13
0.4
MVS20
400905
6614288
985
30.1
>10000
0.26
0.32
Table 1: Grab sample assay results at the Mayview Homestead Antinomy Prospect (ALS Certtificate of
Analyses BR24336754, 10 12 2024)
Page 6 of 13
Sample MVS17: 52.3% Antimony and 0.08grams/tonne Gold. Vein of white-yellowminor green antimony oxide (antimony trioxide Sb2O3), and silvery-grey antimony
sulphide (stibnite, Sb2S3) up to 32mmx12mm, hosted in grey, silicified pelite. Note the
acicular (elongate) stibnite crystals. Single rock collected from mine dump and
fragmented for examination (scale bar: Centimetre divisions).
Sample MVS14: 31.8% Antimony and 0.84grams/tonne Gold. Silicified, grey peilte
hosting a 30mm wide vein of white and minor pale green antimony oxide (antimony
trioxide Sb2O3), and portions with silvery-grey antimony sulphide (stibnite, Sb2S3).
Clumps of stibnite up to 20mmx12mm. Also 2mm wide quartz veins with Fe-Ox (scale
bar: Centimetre divisions).
Page 7 of 13
Sample MVS16: 27.5% Antimony and 0.87grams/tonne Gold. Vein of white-lesser
yellow-green antimony oxide (antimony trioxide Sb2O3, 55%), and silvery-grey
antimony sulphide (stibnite, Sb2S3, 30%) up to 70mmx30mm, hosted in grey, silicified
pelite (15%). Single rock collected from mine dump and fragmented for examination
(scale bar: Centimetre divisions).
Page 8 of 13
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
• Nature and quality of sampling (e.g., cut
techniques
channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine
nodules)
may
warrant
disclosure of detailed information.
Drilling
• Drill type (eg core, reverse circulation,
techniques
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Drill sample
• Method of recording and assessing core
recovery
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Commentary
A series of historic antimony workings
comprising pits/shafts and trenches have
been mapped and sampled. The
workings were developed by miners in the
nineteenth century and have since been
infilled with soil and debris, resulting in the
exploration team being unable to access
the mineralised lodes which the miners
were working. However, there were
numerous mine dumps left by the old
miners which have been identified.
• The exploration crew had to dig into these
dumps to locate samples of mineralisation
previously overlooked. All samples are
from
loose
mineralised
lithologies
uncovered in what is interpreted to be old
mine dumps. Most of the samples
collected for analyses were limited to
individual rocks to avoid mixing out-ofcontext lithologies. Consequently, many
samples are of small mass. It must be
stressed that these samples are not
indicative of the average mineralisation
of the mineralised lodes as there was no
outcrop exposures of mineralisation.
•
•
Not applicable, rock sampling program
•
•
•
Not applicable, rock sampling program
Not applicable, rock sampling program
Not applicable, rock sampling program
•
Not applicable, no drill hole data,
reporting data comprising rock samples.
Rock samples were collected in the field
by qualified field geologists and as part of
a
detailed
prospecting
program.
Qualitative categorical and descriptive
data was collected on each sample by
•
Page 9 of 13
Criteria
Subsampling
techniques
and sample
preparation
Quality
of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explanation
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The nature, quality and appropriateness
of
the
assaying
and
laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted
(eg
standards,
blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage
(physical
and
electronic)
protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
Commentary
the field geologists along with a
representative photo collected of each
sample
• Not applicable, rock sampling program
•
•
•
•
•
•
•
•
•
•
•
Data comprising rock samples
No field sub-sampling techniques were
employed on the program.
All samples are from loose mineralised
lithologies
uncovered
in
what
is
interpreted to be old mine dumps. Most of
the samples collected for analyses were
limited to individual rocks to avoid mixing
out-of-context lithologies. Consequently,
many samples are of small mass. It must
be stressed that these samples are not
indicative of the average mineralisation
of the mineralised lodes as there was no
outcrop exposures of mineralisation.
All samples reported herein were
collected by qualified geologists and the
nature, quality and appropriateness of
the assaying and laboratory procedures
used are detailed below.
All samples have been dispatched to ALS
Laboratories Zillmere, Queensland.
All samples - Preparation: PUL-31 Pulverize
up to 250g 85% <75 um
All samples - Analytical Method: AuMETL44 50g, 51 elements.
No verification sampling and assaying has
been captured to date
No drilling
No adjustments to data
All samples have been located by
handheld Garmin GPS 60x where the grid
datum GDA94 Zone 56J
Page 10 of 13
Criteria
JORC Code explanation
Commentary
The decision on the spatial distribution
and distance of sampling has been
determined solely by the distribution of old
mine workings and mine dump and no
continuity of grade is implied
• No sample compositing has been implied
• The data spacing and distribution was not
intended and is not sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• The work completed was appropriate for
the current early exploration stage.
Data
spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether
the
data
spacing
and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
•
Orientation
of data in
relation
to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure sample
security.
•
•
No sample orientation was undertaken
No drilling undertaken or reported.
•
Samples were in continual custody of
professional Company representatives
until final delivery by secure express
parcel post to the laboratory where all
sample will be held in a secure setting until
processing
• The results of any audits or reviews of
sampling techniques and data.
•
No audit has been undertaken at this
early stage of exploration
Sample
security
Audits
reviews
or
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
• Type, reference name/number, location
• CRR holds five granted Exploration
tenement
and ownership including agreements or
Licences (EL4474, EL7679, EL9428, EL9429,
and
land
material issues with third parties such as
EL9430), northeast of Armidale N.S.W.,
tenure status
joint ventures, partnerships, overriding
that encompass at total of 946km2.
• All tenements are granted.
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
• Acknowledgment and appraisal of
• Open File, DIGS Records, Geological
done
by
exploration by other parties.
Survey of New South Wales Report:
other parties
Gilligan, L.B., Brownlow, J.W., Cameron R.
G., Henley, H. F. & Degeling, P. R., 1992.
Harbour
1:250,000
Dorrigo-Coffs
metallogenic map SH/56-10, SH/56-11:
Page 11 of 13
Criteria
JORC Code explanation
Geology
•
Deposit type, geological setting and
style of mineralisation.
Drill
hole
Information
•
A summary of all information material to
•
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o
easting and northing of the drill hole co
o
elevation or RL (Reduced Level – elev
above sea level in metres) of the drill
collar
o
dip and azimuth of the hole
o
down hole length and interception dep
o
hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person
should clearly explain why this is the
case.
In
reporting
Exploration
Results,
•
weighting
averaging
techniques,
maximum and/or minimum grade
•
•
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where
aggregate
intercepts
incorporate short lengths of high grade
results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations
should be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
These relationships are particularly
•
important in the reporting of Exploration
•
Results.
•
If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
•
Data
aggregatio
n methods
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
•
•
Commentary
metallogenic study and mineral deposit
data sheets, 509pp., Geological Survey of
N.S.W., Sydney.
• Larvotto
Resources
(ASX:LRV)
ASX
Announcement 10 September 2024.
Presentation,
New
World
Metals
Conference, Hillgrove Gold-Antimony
Project
• Red River Resources Limited ASX Release
September 2019 Hillgrove Gold-Antimony
Project Site Visit
• Potential
Hillgrove-style
Orogenic
Antimony-Gold System
Not applicable, no drilling undertaken or
reported.
No weighting of averaging techniques
has been utilized.
No aggregations are reported.
No metal equivalents were used or
calculated.
N/A, no drilling undertaken or reported
N/A, no drilling undertaken or reported
N/A, no drilling undertaken or reported
Page 12 of 13
Criteria
Diagrams
Balanced
reporting
JORC Code explanation
clear statement to this effect (eg ‘down
hole length, true width not known’).
• Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
Other
substantive
exploration
data
•
Further work
•
•
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey results;
geochemical
survey
results;
bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially sensitive.
Commentary
•
•
•
•
•
•
•
•
•
•
Pertinent maps for this stage of Project
are included in the release.
Coordinates in GDA94
Table 1 above contains all assay results of
Sb, Au and Ag for all samples collected.
All samples are from loose mineralised
lithologies uncovered in what is
interpreted to be old mine dumps. Most
of the samples collected for analyses
were limited to individual rocks to avoid
lithologies.
mixing
out-of-context
Consequently, many samples are of small
mass. It must be stressed that these
samples are not indicative of the
average mineralisation of the mineralised
lodes as there was no outcrop exposures
of mineralisation.
All historical exploration data is being
reviewed and compiled into a central
data base.
Desktop reviews of gold and antimony
mineralisation and structural controls on
nearby extensively explored tenements is
being undertaken to define diagnostic
features to inform field programs.
Field crews will be mobilised to site to
commence
orientation
field
reconnaissance and rock and soil
geochemical sampling.
Further exploration (included potential
trenching and drilling) will be required to
test the prospect and the antimony and
gold grades.
Diagrams
are
being
prepared
highlighting geological interpretations of
the potential mineralised structures.
Page 13 of 13
Share your feedback
Discover