Resource Extension Drilling Underway, Mavis Lake Li Project
Released
Released
Announcement PDF
ASX Announcement
03 July 2023
Resource Extension Drilling Underway at Mavis Lake
Lithium Project
Highlights
•
Drilling campaign underway targeting Resource growth at Mavis Lake
•
Drill plan designed to confirm mineralisation both laterally, near surface and at
depth
•
Targeted drill holes have been designed to support a future Resource upgrade an
increase in Resource tonnage and a Mineral Resource Estimate category upgrade
•
Critical Resources remains one of only two ASX-listed lithium Companies to hold a
JORC Code 2012 compliant lithium resource in Ontario, Canada
•
The Company continues to advance the Mavis Lake Lithium Project with a clear
pathway for development and value creation
•
The Company is also finalising the summer campaign for its recently acquired
Gullwing and Tot Lake prospects
Lithium development company Critical Resources Limited ASX:CRR (“Critical Resources” or “the
Company”) is pleased to announce that following a short seasonal pause in May, drilling is again
underway. The summer drill campaign is in support of a future Resource upgrade at the
Company’s 100%-owned Mavis Lake Lithium Project in Ontario, Canada.
Future Resource Upgrade
Following the release of the Company’s Maiden Mineral Resource Estimate (MRE) – 8.0Mt at 1.07%
Li2O (refer ASX Announcement, 5 May 2023), drilling is underway aimed to extend the known
mineralisation and ultimately support a future Resource upgrade. Drill holes have been designed
to provide both a category upgrade and an increase in total Resource tonnage.
Infill drilling – Category Upgrade
Drilling which is intended to provide a category upgrade will focus principally on in-fill drilling at the
Main Zone. The infill program will seek to ensure that a high proportion of the future Resource is
upgraded from Inferred to Indicated.
Planned drill holes will continue to in-fill at 50m drill hole spacing across the current Resource
mineralised ore shapes. In-fill drilling will also test mineralised zones for extensional/resource
expansion potential.
The initial infill area can be seen in Figure 1.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
Resource Growth
Drilling aimed at achieving Resource growth is anticipated to be achieved immediately through
extensional drilling of the Main Zone. Priority targets include drill testing of “Pegmatite 9” – a
mapped, spodumene bearing pegmatite that has not been drill tested to date.
The Pegmatite 9 target area can be seen in Figure 1.
Figure 1 – Pegmatite 9 growth (grey highlight) and Main Zone infill (green highlight) target areas
seen in context to previous intercept highlights
Critical Resources Managing Director, Alex Cheeseman, said:
“Off the back of the Maiden Mineral Resource Estimate, it’s great to have the drill rigs spinning in
support of a Resource upgrade. We’ve said it before, but this really is just the start for Mavis Lake,
there is so much potential and growth opportunity with this Project.
“Along with Resource growth, we continue to advance multiple development streams and have a
clear pathway to value creation.
Page 2 of 3
“The North American policy and investment environment for critical minerals and decarbonsation
efforts is seeing unprecedented government and industry activity and commitment. It’s clear that
lithium raw material projects in North America are in high demand, and this positions Critical
Resources perfectly as we continue to advance the Mavis Lake Lithium Project.”
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9389 4499
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is advancing and developing critical metals projects for a decarbonised future. The Company holds
a suite of lithium prospects across Ontario, Canada, including Mavis Lake, Graphic Lake, Plaid and Whiteloon Lake.
The Company’s other projects include a copper project in Oman, and a base metals project in Halls Peak NSW,
Australia.
The Company’s primary focus is the rapid development of its flagship Mavis Lake Lithium Project. Mavis Lake is an
advanced exploration project with near-term development potential. The Company completed over 19,500m of
drilling in 2022 and has commenced another significant drilling program in 2023. In early 2023, Critical Resources
released its maiden JORC Code 2012 Compliant Inferred Mineral Resource Estimate (MRE) for Mavis Lake – making
Critical Resources just one of two ASX-listed companies with a JORC Code 2012 compliant mineral resource in Ontario.
In parallel, the Company has also commenced initial studies that will underpin the transition from explorer to developer.
COMPLIANCE STATEMENT
This announcement contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX
market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed. This document contains information on the Mavis Lake Lithium Project extracted from ASX market
announcements reported in accordance with the 2012 JORC Code and available for viewing at
www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original ASX market announcement. ASX announcements pertaining to key
assays are as follows:
Drill Holes MF22-177, MF22-178, MF22-190, SZ23-002, SZ23-004, SX23-005 and SZ23-010 refer to ASX announcement
dated 27 March 2023
Drill Holes MF22-163 and MF22-156 refer to ASX announcement dated 27 February 2023
Drill Holes MF22-129, MF22-149 and MF22-150 refer to ASX announcement dated 13 December 2022
Drill Holes MF22-121 and MF22-123 refer to ASX announcement dated 24 October 2022
Drill Holes MF22-81, MF22-82 and MF22-84 refer to ASX announcement dated 28 September 2022
Drill Holes MF22-116 and MF22-117 refer to ASX announcement dated 13 September 2022
Drill Hole MF22-72 refer to ASX announcement dated 21 July 2022
Drill Hole MF22-64 refer to ASX announcement dated 16 June 202
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward-looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward-looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projects based on new
information, future events or otherwise except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Page 3 of 3
Share your feedback
Discover