Shallow RC Drilling Confirms Gold System at Cap Burn
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
25 MARCH 2026
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
FIRST-PASS SHALLOW RC DRILLING CONFIRMS OROGENIC
GOLD SYSTEM AT CAP BURN – NEW ZEALAND
First-pass RC drilling confirms structurally controlled gold mineralisation - strong arsenic vectoring
supports down-plunge targeting analogous to the Rise and Shine exploration model.
- Orogenic Gold System Confirmed at Cap Burn, New Zealand: The first-pass shallow RC drilling
program has confirmed a broad, structurally controlled orogenic gold system associated with
the Cap Burn Fault ~11 km along strike from OceanaGold’s 10 Moz gold camp at Macraes.
- Broad Zones of Mineralisation Intersected: First-pass RC drilling across 12 holes has defined a
coherent mineralised footprint within the TZ4 schist unit, with key intersections including: 1 m @
1.29 g/t Au within 7 m @ 0.37 g/t Au (CBRC017) and 16 m @ 0.22 g/t Au (CBRC021) - the same
lithological package that controls gold at Santana Minerals’ (ASX:SMI) Rise and Shine discovery.
- Large Geochemical Footprint Defines Clear Drill Targets: A coherent >1 km² arsenic-in-soil
anomaly provides a compelling surface expression of the mineralised system, with a consistent
gold–arsenic association providing direction for ongoing drill targeting.
- Mineralisation Open Along Strike and at Depth: The shallow drilling tested only a small portion of
the ~10 km structural corridor, with the system remaining open in multiple directions.
Groundwater constrained drilling to a maximum of ~60m depth, with mineralisation intersected
at the end of several holes, highlighting that the down-plunge target remains untested.
- Down-Plunge Potential Untested: Results confirm broad, low-grade gold within the TZ4 unit
beneath a defined arsenic-in-soil anomaly — consistent with Rise and Shine prior to discovery,
not the upper TZ3-hosted mineralisation as observed at Macraes.
- Highly Prospective New Zealand Location: The Cap Burn Project is situated within the Otago
Schist Belt on a regionally significant structural trend that hosts Macraes, Bendigo–Ophir and
numerous historic alluvial gold workings, making Otago one of New Zealand’s most active and
proven gold provinces.
- Early-Stage with Clear Follow-Up Program: The Company will advance a step-out program at
depth, targeting the untested down-plunge zone, expanding the soil geo-chemistry and field
mapping along the prospective Cap Burn Fault corridor.
Critical Resources Limited ('Critical Resources' or the 'Company', ASX:CRR) is pleased to report results from the
first-pass Reverse Circulation (RC) drilling program at the Cap Burn Gold Project in the Otago region, New
Zealand. The program has confirmed structurally controlled gold mineralisation associated with the Cap Burn
Fault, hosted within the Textural Zone 4 (TZ4) schist unit, and defined a coherent mineralised footprint with a
consistent gold–arsenic association across the drilled area.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The results are consistent with the early-stage pattern observed at Santana Minerals' (ASX:SMI) Rise and Shine
deposit prior to its discovery — with broad, disseminated gold intersected directly beneath an arsenic-in-soil
anomaly within the TZ4 unit, with higher-grade mineralisation subsequently encountered by stepping down-
plunge along the controlling fault structure. The Company's exploration model at Cap Burn targets the same
geometry: the down-plunge extension beneath the Cap Burn Fault, which remains entirely untested and
represents the primary follow-up target for the next phase of drilling (Figure 1).
Figure 1 - Cap Burn Project – Drill Collar Locations, Gold Mineralisation and Arsenic Anomaly. Plan view
showing completed drill collars (white) and legacy drill collars (red) relative to the Cap Burn Fault (green),
with gold mineralisation footprint (red shading) derived from drilling. The blue outline defines the outer
boundary of the arsenic-in-soil anomaly (>20 ppm As), with a higher-intensity core anomaly (>150 ppm As)
spatially associated with the Cap Burn Fault and the defined mineralisation. Mineralisation remains open
along strike.
FIRST PASS DRILLING RESULTS
The first pass RC drill program has confirmed a broad, structurally controlled gold system beneath the Cap
Burn Fault, with mineralisation hosted within sheared and altered TZ4 schist. Key intersections include 7 m @
0.37 g/t Au from 65 m (CBRC017), including: 1 m @ 1.29 g/t Au, and 16 m @ 0.22 g/t Au from 46 m (CBRC021).
Several holes were terminated in mineralisation due to rig capacity and groundwater inflow, confirming that
mineralisation remains open at depth.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Gold mineralisation is consistently associated with elevated arsenic across the drilled area. The strongest
intersection, 1m @ 1.29 g/t Au in CBRC017 coincides with a highly elevated arsenic anomaly >1,600 ppm As,
while broader mineralised intervals display persistent arsenic enrichment throughout. This gold–arsenic
relationship is spatially coherent and defines a footprint exceeding 1 km², where drilling-defined mineralisation
aligns closely with the >20 ppm arsenic-in-soil anomaly (Figure 1).
Soil geochemistry targeting arsenic occurrences along the Cap Burn Fault corridor remains largely untested
(Figure 3). This provides a clear basis for follow-up targeting, with priority on the soil geochemistry survey and
drill testing structurally favourable positions along the fault.
The strong association between gold and arsenic at Cap Burn is consistent with an orogenic hydrothermal
system, similar to that observed at structurally controlled shear zone deposits across the Otago Schist Belt,
including Macraes and Rise and Shine. The geochemistry, structural setting and style of mineralisation are
coherent and support this interpretation. Mineralisation is distributed across a broad shear-hosted structural
package, and the current program appears to have sampled only the shallow expression of the system.
Mineralisation at Cap Burn is hosted within the TZ4 schist unit — consistent with the early-stage intersections at
Rise and Shine prior to discovery - rather than the upper TZ3 unit that hosts the high-grade mineralisation at
Macraes, suggesting Cap Burn may be at an analogous structural position to Rise and Shine at a comparable
stage of exploration.
The Cap Burn Fault corridor extends over approximately 10 km of strike (Figure 4). The interpreted structural
continuity of the fault, combined with the coherent >1 km² geochemical footprint, confirms this is a system of
significant scale. The critical question — what grades exist at depth along the down-plunge target — remains
unanswered, and that is the focus of the Company's follow-up program.
Figure 2 - Cap Burn Cross Section A-B (-/+ 50m window) showing gold mineralisation beneath the Cap Burn
Fault - looking northwest. Location of section on figure 1.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Holes CBRC017 and CBRC021 (Figure 2) shows that mineralisation is developed within a broad structural zone
positioned below the interpreted fault plane. Rather than a single discrete shear, mineralisation is distributed
across a relatively wide package of sheared and altered TZ4 schist, consistent with the style of early-stage
orogenic systems where gold is disseminated through a broad hydrothermal envelope ahead of higher-grade
structural focusing at depth. Several holes in this section were terminated in mineralisation, confirming the
system remains open below current drill depths.
The Western section (Figure 3), oriented north–south, reinforces this interpretation and incorporates historical
drilling from New Peak Metals holes CBN011 and CBN012. The section highlights the vertical thickness and
continuity of mineralisation within a broad structural corridor, with gold distributed through a wide package
rather than confined to a single discrete structure. No clear structural discontinuities are observed within the
section that would limit continuity of the system, supporting the interpretation of a laterally continuous
mineralised corridor along the Cap Burn Fault.
The completed first pass drilling with legacy results support a consistent interpretation: mineralisation at Cap
Burn is hosted within a broad, continuous structural corridor that has been tested only at shallow levels. The
geometry is directly analogous to the pre-discovery pattern at Santana Minerals' Rise and Shine, where early
drilling intersected disseminated gold within the TZ4 unit before higher-grade mineralisation was encountered
by stepping down-plunge along the controlling fault structure. The down-plunge zone beneath the Cap Burn
Fault remains largely untested and represents the primary follow-up target.
Figure 3 - Cap Burn Cross Section C-D (-/+ 50m window) showing broadly distributed gold mineralisation
within the TZ4 schist unit. Location of section on figure 1.
DISTRICT-SCALE CAP BURN FAULT CORRIDOR
The Cap Burn Fault extends over approximately 10 km of strike across the project tenure, defining a district-
scale structural corridor of the type known to host significant orogenic gold systems in the Otago Schist Belt.
Current drilling has tested a small portion of this corridor, with mineralisation confirmed within the drilled area
and the broader fault system remaining largely untested.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Multiple prospective positions exist along strike beyond the current drilling area, and the down-plunge
extension beneath the fault represents an entirely untested target (Figure 4). This is an early-stage project with
a confirmed system, a clear structural model, and significant ground yet to be tested — the conditions that
define genuine exploration upside.
Figure 4 - Cap Burn Regional Structural Setting and Strike Extent of the Cap Burn Fault. Plan view showing the
interpreted trace of the Cap Burn Fault across the project tenure, highlighting the limited extent of current
drilling relative to the overall strike length of the structure. Existing drilling and defined mineralisation represent
a small portion of the broader prospective corridor.
Critical Resources Managing Director, Tim Wither, commented: ‘These are encouraging first-pass results
that validate our Cap Burn exploration model. Broad gold mineralisation with strong arsenic-gold
association beneath the fault is exactly the geochemical signature we were targeting — and several holes
were still in mineralisation when we had to stop drilling. The down-plunge zone beneath the Cap Burn Fault
remains untested, and there are some encouraging grade vectoring into a narrower search area.
The >1 km² arsenic anomaly gives us high confidence in the scale of the system. Cap Burn sits ~11 km along
strike from OceanaGold’s +10 million Oz gold camp at Macraes, on the same structural corridor. With
numerous historical high-grade alluvial working beneath the Cap Burn fault, we know this is a fertile region.
This is the start of our systematic exploration program on a structurally significant corridor in a proven gold
belt. The results are consistent with our exploration model with a clear follow-up path to move forward.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
NEXT STEPS
The Company will advance the Cap Burn Project through a focused program of follow-up drilling and
technical refinement, targeting extensions of mineralisation associated with the Cap Burn Fault, expected
to commence in Q2-2026.
Priority activities will include step-out drilling along strike and at depth of mineralised intercepts, particularly
around CBRC017 and CBRC021, where broad mineralisation and higher-grade intervals have been
intersected. Drilling will target structurally favourable positions, including interpreted fault intersections and
zones of dilation where higher-grade shoots may develop.
Drilling depth in the current program was constrained by RC rig capacity and groundwater inflow, with
several holes terminated in mineralisation. This supports the priority of testing deeper extensions in subsequent
drilling phases.
A systematic along-strike soil geochemistry program is planned to extend and refine the existing arsenic
anomaly and identify additional drill targets along the Cap Burn Fault. The Rock and Pillar Prospecting Permit
will enable this work to be expanded to district scale across the consolidated tenure. Further work will include
detailed structural mapping and interpretation to refine understanding of controls on mineralisation and
improve targeting of higher-grade zones.
Integration of structural, geochemical and drilling datasets will be used to prioritise follow-up drilling beneath
the >1 km² arsenic anomaly, which remains largely untested.
Figure 5 – Cap Burn Project location ~11km from OceanaGold Macraes Gold Operations with major and
minor interpreted structures (black lines)and historic alluvial gold workings (blue circles)(Google Earth image).
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
This announcement has been approved for release by the Board of Directors of Critical Resources.
To receive alerts for ASX announcements and updates sign up at www.criticalresources.com.au or for
further information please contact us directly at:
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources Limited (ASX:CRR) is an Australian mining and technology company focused on the
discovery and development of critical metals and next-generation battery technologies essential to a
sustainable future. The Company holds a diversified portfolio including the Mavis Lake Lithium Project in
Ontario, Canada, the Halls Peak Base Metals Project in New South Wales, and a growing gold portfolio in New
Zealand.
COMPETENT PERSON STATEMENT
The information in this report that relates to Exploration Results is based on information compiled by Mr Hamish McLauchlan
who is a member of the Australian Institute of Geoscientists (AIG). Mr McLauchlan is a consultant and has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which they
are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves.’ Mr McLauchlan consents to the inclusion in this report of the
matters based on their information in the form and context in which it appears. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified.
PREVIOUSLY REPORTED INFORMATION
This announcement contains information on the New Zealand Projects extracted from ASX market announcements dated
6 August 2025, 8 September 2025, 10 September 2025 and 4 December 2025 reported in accordance with the 2012 JORC
Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original ASX market announcement.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward-looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward-looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projections based on
new information, future events or otherwise, except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Critical Resources’ Interactive Investor Hub
Engage with Critical Resources directly by asking questions, watching video summaries and
seeing what other shareholders have to say about this, as well as past announcements.
For more information visit: www.criticalresources.com.au
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
APPENDIX A
Table 1 – Cap Burn Exploration Drill Collar Details
Hole ID Hole Type
Northing
(NZTM)
Easting
(NZTM)
RL
(NZVD)
Dip
Azimuth
( Grid)
Depth
(m)
CBRC014 RC 1382585 4981208 783 -60 205 69
CBRC015 RC 1382053 4981445 857 -60 205 65
CBRC016 RC 1382218 4981499 839 -60 205 65
CBRC017 RC 1381975 4981513 861 -60 205 76
CBRC018 RC 1381932 4981607 867 -60 205 82
CBRC019 RC 1381840 4981644 854 -60 205 70
CBRC020 RC 1381727 4981697 834 -60 205 79
CBRC021 RC 1382050 4981513 860 -60 205 63
CBRC022 RC 1381984 4981586 867 -60 205 60
CBRC023 RC 1382023 4981384 844 -60 0 51
CBRC024 RC 1382093 4981265 826 -90 0 43
CBRC025 RC 1382547 4981193 776 -45 40 64
Table 2 –Cap Burn Exploration Significant Intercepts.
Significant intercepts are reported using a 0.1 g/t Au cut-off, with a minimum composite width of 1 meter.
Hole ID From To Interval (m) Au ppm (g/t)
CBRC014 63 64 1 0.13
CBRC015 32 33 1 0.14
CBRC015 35 36 1 0.12
CBRC016 41 47 6 0.1
CBRC016 52 53 1 0.1
CBRC016 54 55 1 0.17
CBRC017 65 72 7 0.37
including 65 66 1 1.29
CBRC017 75 76 (EOH) 1 0.14
CBRC019 48 49 1 0.1
CBRC021 46 62 16 0.22
CBRC023 9 11 2 0.12
CBRC023 27 28 1 0.16
CBRC024 2 13 11 0.16
CBRC024 33 34 1 0.19
CBRC025 23 24 1 0.13
Up to 2 metres of consecutive internal dilution below the cut-off is permitted, provided the composite remains continuous
with no gaps and starts and ends above the cut-off grade. All reported grades are length-weighted averages based on
downhole sample intervals. Including intervals represent contiguous sub-intervals averaging ≥1.0 g/t Au and are reported
within broader composite intervals. Reported widths are downhole lengths; true widths are not yet known. Intervals
affected by wet sample conditions at the base of holes have been excluded from reporting, as these samples are
considered less reliable due to potential impacts on sample recovery and representativity.
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc.). These examples should
not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant
disclosure of detailed information.
• Reverse circulation (RC) drilling was used to obtain samples at
the Cap Burn Project. Samples were collected at 1 metre
intervals using a cyclone and rotary cone splitter mounted
below the cyclone, producing representative sub-samples.
• The splitter produced two ~30% splits and one ~40% split. The
two 30% splits were used as the primary sample and field
duplicate, with the remaining ~40% split retained for geological
logging. Samples were weighed during drilling to assess splitter
performance and sample recovery.
• Samples were dispatched to an accredited laboratory for
preparation and analysis. At the laboratory, samples were
crushed to approximately 3.5 mm using a jaw crusher and split
using a linear sample divider to produce a 500 g sub-sample for
analysis.
• Gold analysis was undertaken using Chrysos Photon Assay, a
bulk analytical technique utilising high-energy X-ray analysis of
large sample volumes. This method is considered appropriate
for gold mineralisation and reduces potential sampling bias
associated with coarse gold.
• During drilling, samples were also analysed for a suite of 31
elements using portable X-ray fluorescence (pXRF) to support
geological interpretation and geochemical vectoring.
• Field quality control procedures included the insertion of
certified reference materials (CRMs) and field duplicates at a
rate of approximately 4% each within the sample stream. Blanks
were not routinely inserted, which is considered appropriate
given samples were not pulverised in the field and
contamination risks are primarily controlled during laboratory
preparation.
• Sampling and analytical procedures are considered consistent
with industry standards and appropriate for the material being
tested.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
• Drilling at the Cap Burn Project was undertaken using reverse
circulation (RC) drilling methods. Holes were drilled using a
face-sampling hammer with compressed air to recover rock
chips at 1 metre intervals, with a nominal 89 mm diameter drill
bit.
• Drilling was completed using a track-mounted RC drill rig, with
hole diameters appropriate for the style of mineralisation,
program objectives and sampling methodology. Drill holes
were designed to intersect interpreted structures associated
with the Cap Burn Fault and related shear zones at
approximately 90 degrees to the target orientation. A small
number of holes were oriented in alternative directions to
resolve areas of ambiguous geological interpretation.
• Drilling depth was constrained by rig capacity and the ability
to manage groundwater inflow, with several holes terminated
in mineralisation.
• Drilling techniques are considered appropriate for the style of
mineralisation and the stage of exploration.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results is
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
• Sample recovery was monitored during drilling through visual
assessment of sample return at the cyclone and by weighing of
all samples to assess consistency of recovery and splitter
performance.
• Overall sample recovery is considered acceptable for RC
drilling, with no significant issues identified. Sample return was
generally dry, with moisture levels monitored during drilling.
• Groundwater inflow was encountered in all holes, and samples
at the base of these holes were wet where drilling was
terminated. Sample condition was recorded during logging,
and these intervals are not considered suitable for use in Mineral
Critical Resources Limited – www.criticalresources.com.au
Level 50, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Criteria JORC Code explanation Commentary
material. Resource estimation. Outside of these localised zones, sample
quality is considered appropriate and supports future Mineral
Resource estimation.
• No correlation is observed between sample weight and gold
grade, indicating that variations in sample recovery have not
introduced material bias to the assay results.
• The use of a rotary cone splitter mounted below the cyclone is
considered appropriate to obtain representative sub-samples,
and the sampling methodology is considered to be producing
consistent and representative results.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
The total length and percentage of the
relevant intersections logged.
• All RC drill chips were geologically logged on a 1 metre interval
basis by qualified geologists. Logging recorded lithology,
alteration, mineralisation, veining and structural characteristics,
and is considered to be of sufficient detail to support exploration
activities and future Mineral Resource estimation.
• Logging is predominantly qualitative in nature, supported by
semi-quantitative estimates of mineral abundance and
alteration intensity where appropriate. Representative chip trays
were retained for reference and review.
• All drill holes were logged in full, with 100% of the drilled intervals
recorded.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• Sampling was undertaken on reverse circulation (RC) drill chips
collected at 1 metre intervals. Samples were passed through a
cyclone and sub-sampled using a rotary cone splitter mounted
below the cyclone. The splitter produced two ~30% splits and
one ~40% split. The two 30% splits were used as the primary
sample and field duplicate, with the remaining ~40% split
retained for geological logging. Sampling was predominantly
dry, with wet samples limited to the base of some holes where
groundwater inflow was encountered.
• Samples were weighed during drilling to monitor sample
recovery and splitter performance. This is considered
appropriate to ensure representative sub-sampling of the in situ
material.
• Samples were submitted to an accredited laboratory for
preparation. At the laboratory, samples were crushed to
approximately 3.5 mm using a jaw crusher and split using a linear
sample divider to produce a 500 g sub-sample for analysis. This
preparation technique is considered appropriate for the style of
mineralisation and stage of exploration.
• Quality control procedures included the insertion of certified
reference materials (CRMs) and field duplicates at a rate of
approximately 4% each. Field duplicates were derived from the
second splitter split and provide a measure of sampling precision
and representivity.
• The use of a rotary cone splitter, combined with routine field
duplicate sampling and sample weighing, is considered
appropriate to ensure that samples are representative of the
material collected. No evidence of sampling bias has been
identified.
• Sample sizes are considered appropriate for the grain size of the
material being sampled and the analytical method used.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis include instrument make and
model, reading times, calibration factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
• Gold analysis was undertaken using Chrysos Photon Assay, a
bulk analytical technique utilising high-energy X-ray analysis of
large sample volumes. This method is considered appropriate for
gold mineralisation and reduces potential sampling bias
associated with coarse gold.
• Certified reference materials (CRMs) representing low, medium
and high gold grades were routinely inserted into the sample
stream at a nominal rate of approximately one standard per 25–
30 samples to monitor analytical accuracy. Three gold CRMs
were used: Geostats G919-7 (4.96 ppm Au), R
Share your feedback
Discover