Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
26 April 2024
March 2024 Quarterly Activities Report
Highlights
•
Final assay results received from the 2023 drilling program at Mavis Lake Main Zone, which
saw 16,753m of diamond core drilling completed from late-June through to mid-November
2023.
•
Standout assay results include:
- Drill-hole MF23-230 with 18.35m @ 1.46% Li2O from 160.65m down-hole, and an additional
Lower Zone intercept of 8.05m @ 1.21% Li2O from 325.35m down-hole;
- Drill-hole MF23-237 with 11.55m @ 1.06% Li2O from 5.6m down-hole; and
- Drill-hole MF23-238 with 11m @ 1.13% Li2O from 7.35m down-hole.
•
Assay results confirmed the discovery of a Lower Zone pegmatite stack, exhibiting
comparable thickness and grade to the Main Zone. The Lower Zone pegmatites represent
an exciting exploration target as they remain open both up-dip and down-dip.
•
Strong geochemistry results received from the Mavis Lake Northern Prospects, surrounding
the Tot Pegmatite, delineating key mineralisation trends that extend from the high-grade Tot
pegmatite, which returned previous rock chip samples up to 4.58% Li2O.
•
Exploration results from the Northern Prospects confirm the district-scale potential of the
Mavis Lake Project, with the potential to rapidly add tonnage to the Resource base.
•
Data capture completed for the Year One environmental baseline studies, including full
seasonal hydrology, fisheries, terrestrial flora and fauna, as well as species at risk.
•
Ore Sorting testwork program completed with results pending.
•
Operational activity and work rates adjusted to ensure that working capital is directed into
only the highest priority workstreams, with particular emphasis on technical project
development and establishing high-quality/high-confidence future drilling targets.
Overview
Lithium exploration and project development company Critical Resources Limited (ASX:CRR)
(“Critical Resources” or “the Company”) is pleased to report on its activities for the quarter ended
31 March 2024 (“the Quarter”). During the Quarter, the Company continued to focus its efforts on
its flagship asset in Ontario, Canada, the Mavis Lake Lithium Project (“Mavis Lake” or “the Project”).
The Company progressed both exploration and project development workstreams in order to
position the Project as a future supplier of lithium raw materials to the North American market.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
The Company’s development efforts centered on environmental baseline studies in parallel with
ongoing technical studies and design work aimed at leveraging opportunities for a low CAPEX
and low OPEX development at Mavis Lake.
Located in immediate proximity to utilities, services and transport infrastructure essential to support
a future mining operation, Mavis Lake is well positioned to become a long-term supplier of lithium
products to North America’s rapidly growing battery minerals and electric vehicle sector.
Operational Activities
Mavis Lake Lithium Project (100%) – Ontario, Canada
During the Quarter, the Company completed a detailed review and analysis of exploration results
across the Main Zone and Northern Prospect areas of the Mavis Lake Project, as well as ongoing
project development workstreams, centred on mine study development, baseline environmental
studies and metallurgical test work.
Exploration
Main Zone. Assay results released during the Quarter were from the final weeks of drilling in CY2023.
Outstanding new results which sit outside the current Mineral Resource Estimate (MRE), such as drillhole MF23-230 which returned an intercept of 18.35m @ 1.46% Li2O from 160.65m down-hole,
demonstrate the potential to expand the Mavis Lake Resource.
An additional significant intercept in drill-hole MF23-230, which returned 8.05m @ 1.21% Li2O from
325.35m down-hole, and drill-hole MF23-244, which intercepted 6.1m @ 1.73% Li2O from 377.45m
down-hole, have confirmed the discovery of a lower pegmatite stack.
These results, together with previously released assays, have delineated a thick, very high-grade
mineralised ‘Lower Zone’ at depth. The entirety of this Lower Zone sits outside the current MRE and
presents an opportunity to add high-grade tonnage to a future Resource upgrade as well as an
exciting exploration target which remains open both down-dip and also trends to surface.
The shallow intercepts recorded in drill-holes MF23-237, MF23-238 and MF23-242 have confirmed
the Company’s interpretation of the pegmatite trends surrounding the Main Zone.
These results suggest that, while most pegmatites trend within the E-W stratigraphy, multiple
occurrences can be found within NE-SW "tension fault breaks" and "dilation zones" associated with
regional stratigraphy and folding.
This correlation is evident in the previously mapped and drill-tested southern pegmatites (11, 12,
and 20). Similarly, the eastern pegmatites (18, 19, and 23), located approximately 1-2 km east of
Mavis Lake Main Zone, exhibit similar structural characteristics, and will be exploration targets in
the upcoming summer field season.
Near-surface, high-grade intercepts are likely to have a positive impact on mining studies and
initial pit design.
Page 2 of 11
Table 1: Significant Assay Results released during the Quarter
Hole ID
From (m)
To (m)
MF23-230
including
160.65
164.38
179
177.65
Down Hole
Interval (m)
18.35
13.27
MF23-237
5.6
17.15
MF23-238
7.35
MF23-242
MF23-244
and
and
Li2O (%)
True Width (m)
1.46
1.9
15.6
10.0
11.55
1.06
10.4
18.35
11
1.13
9.9
11.4
15.3
3.9
1.72
3.5
125
201.55
377.45
132.4
213.7
383.55
7.4
12.15
6.1
1.25
0.83
1.73
6.7
10.9
6.1
B
B’
Figure 1: Plan map illustrating the collar locations and section reference.
Page 3 of 11
Figure 2: Cross-section highlighting Primary and Lower Zone intercepts.
Northern Prospects. In addition to the positive exploration results reported from drilling completed
in late CY2023, highly encouraging results were returned from a comprehensive Mobile Metal Ion
(MMI) soil geochemistry program completed late last year, focused on the high-grade Tot
pegmatite, located in the northern part of the Mavis Lake Lithium Project area.
The MMI soil geochemistry program was designed to provide early-stage planning for secondary
drill targets, trending from the known high-grade outcrops with known, thick overburden
surrounding the outcrop.
Page 4 of 11
The program was completed over an expansive area of 7km by 1.25km, with 1,356 soil samples
collected. The MMI soil sampling was conducted on a line spacing of 100m. Sample spacing varied,
starting from 25m, progressing to 50m and finally extending to 100m, radiating outward from the Tot
Pegmatite prospect.
The MMI soil analysis results highlight strong anomalies in lithium, caesium and rubidium, extending
in both a north-north-west and south-south-east orientation from the exposed Tot outcrop. These
anomalies collectively contribute to the delineation of significant anomalies including a prominent
lithium anomaly extending over a geochemical strike length of 1.25km, indicating the possible
extension of mineralisation well beyond the visible surface exposure of the Tot pegmatite.
The aeromagnetic survey has delineated linear magnetic lows in the Northern Prospects, indicating
potential extensions of known spodumene-bearing pegmatites like Gullwing and Tot, as well as
newly identified trends suggestive of proximal pegmatite emplacement zones correlated with
geochemical surface samples, notably MMI soils.
These magnetic anomalies, coupled with the geochemical data, present compelling high-priority
targets for intensified prospecting efforts and drill-hole planning.
Figure 3: Lithium MMI soil results highlighting potential extensions of lithium mineralisation ~650m
to the north and ~450m to the south of the edges of the Tot outcrop. Multiple possible N-S trends
highlight possible pegmatite stacks over an area of 2km X 1.25km.
Page 5 of 11
Project Development
Studies. Throughout the Quarter, multiple workstreams continued to advance permitting as well as
the technical and financial aspects of the Company’s study efforts. Logistics planning and
engagement with potential service providers has advanced export logistics concepts.
With multiple export ports accessible from existing Road and Rail networks, the Company will
advance a number of potential export options in formal studies. Optionality will allow for detailed
cost/benefit analysis and inform pricing strategies and considerations for future negotiations with
potential customers.
During the Quarter, the Company also commenced preliminary geotechnical and hydrogeology
studies. Completed at desktop/scoping level, these technical studies represent key inputs to
underpin a robust mining study.
The Company began market solicitation activities for mining study works in early April 2024. The
mining study forms a central component of the Company’s Preliminary Economic
Assessment/Scoping Study on the Mavis Lake Project. The mining study has been framed to deliver
the best possible economic factors for mineral extraction, while minimising the footprint and total
impact of the operation on the natural environment and surrounding area.
Year 1 Environmental Baseline Assessment Studies were completed during the Quarter with the
completion of winter season hydrology data captured in January. Stage 1 Archaeology studies
were also completed during the Quarter with findings under review by First Nations Communities.
Metallurgical Development. During the Quarter, the Company conducted a mineralogy and ore
sorting testwork program designed to assess the amenability of Mavis Lake ore to pre-concentration
using ore sorting. Ore sorting has become an integral component of hard rock lithium processing
flowsheets to reduce iron and waste rock contamination, increase plant throughput rates and
improve spodumene product quality.
The Company’s initial programme is investigating multiple sorting technologies. The testwork scope
was completed during the Quarter, with results pending.
In late March, the Company commenced the next phase of metallurgical testwork. A bulk sample,
comprising over 1,600kg of drilled core, was delivered to Saskatoon, where SRC has been engaged
to complete the first phase of testwork including characterisation, comminution, bulk ore sorting,
heavy liquid separation (HLS) and dense media separation (DMS) test work.
This first phase of testing is expected to take five months to complete and will be used to inform
flowsheet design. Subsequent testwork phases may include fines beneficiation and variability
testwork.
Graphic Lake Lithium Project (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake Project, no exploration activities
were completed at Graphic Lake during the Quarter.
Page 6 of 11
Plaid and Whiteloon Lake Projects (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake project, no fieldwork was
undertaken at either the Plaid or Whiteloon Projects during the Quarter. Desktop work and
assessment was carried out to evaluate the prospectivity of these projects. An independent review,
supported by internal assessment, concluded that there was no prospectivity for lithium
mineralisation across either project area, driven principally by the underlying geological setting not
being conducive for the formation of LCT pegmatites. The Company relinquished the project claims
in February 2024.
Halls Peak Project – New South Wales, Australia
With the Company focusing its working capital on the Mavis Lake Project, no exploration activities
were completed at Halls Peak during the Quarter.
Sohar Block 4 and 5 Project – Sultanate of Oman
During the Quarter, efforts were focused on divesting the Sohar Copper Project.
The Company was advised by the Ministry of Energy and Minerals, Sultanate of Oman, that the
exploration licences over Block 4 and Block 5 had expired and would not be renewed as they had
reached the end of their stated renewal period. The Company engaged the Ministry both via its
regional management and its in-country partners, who subsequently reaffirmed the Ministry’s
position. While the Company indirectly retains a majority shareholding and associated asset
interests in Al Fairuz Mining (AFM) LLC and Al Thuraya Mining (ATM) LLC, the Company continued
to engage in discussions with the in-country partners and other company shareholders regarding
the future of these business entities and associated assets.
Schedule of Mineral Tenements
The Company’s tenement and claim schedule is provided in Appendix 1.
Lithium Market and Industry
In early March, Reuters reported that the Government of Chile had announced its plan to open a
number of salt flats for investment; however, the Chilean Government also reserved the prolific
Atacama and Maricunga deposits for majority state-control. The Government is hopeful of
attracting competitive bids from private investment but its plans also highlight the jurisdictional risk
of operating in Chile, where Government control of assets is seen as a primary means to build
national economic capacity.
Conversely, SMM reported in March the ongoing progress within the North American lithium
battery industry which has been underway since the Obama Administration. In the face of the
challenges of climate change and the volatility of global energy markets, strengthening the
development of the lithium industry has become one of the key strategies for the United States.
Driven by the rapid growth in the domestic electric vehicle and broader energy storage system
market – bolstered by diverse policy support – the production capacity of North American lithiumion battery industry is expected to increase rapidly.
Page 7 of 11
According to SMM data, lithium-ion battery capacity in North America will exceed 1TWh in 2028.
Capacity will increase by approximately 859.5GWh over the five-year period from 2023 to 2028, a
nearly tenfold increase.
Lithium sector analysts from Canaccord Genuity Australia and Wilsons Advisory all produced a
series of market and commodity price updates and assessments throughout the Quarter. Key
market indicators were observed with the re-commencement of Pilbara Minerals’ spodumene
concentrate auctions and Albemarle commencing digital lithium product auctions.
The general consensus amongst analysts is that price rises across spodumene concentrate and
lithium chemicals (observed since January 2024) are encouraging and provide increased
confidence. However, the catalyst the industry is waiting for is more significant restocking of the
supply chain, which is assessed as likely to result in more aggressive rises in price.
Fastmarkets reported the result of Albemarle’s spodumene concentrate digital auction in late
March was 9,372 yuan ($1,230) per tonne on an ex-works China basis. This price is equivalent to
approximately US$1,200 per tonne on a SC6 CIF China basis, and the highest spot price observed
in CY2024. Fastmarkets report Albemarle’s rational for initiating its digital auction process is to
provide greater transparency on the lithium spot market.
ESG and Sustainability
During the Quarter the Company continued its regular engagement with First Nations Communities
through deliberate meetings and engagements at both the annual PDAC conference as well as
subsequent management visits to the Mavis Lake Project. The Company also began preparing for
its first Dryden Citizens Committee Meeting, which was initially scheduled for late March but was
postponed to April as a cold weather event made travel to Dryden unsafe.
During the Quarter, the Company initiated a number of project introduction meetings to Ontario
Government departments that have been involved with the permitting process for the Mavis Lake
Project. Specifically, the Company met with and provided project updates to operational
members of the Ministry of Natural Resources and Forestry in Dryden, and the Ministry of Transport
in Thunder Bay.
Finance
Exploration Expenditure
The Company invested approximately AUD$1.5m in exploration and evaluation activities across its
project portfolio during the Quarter, approximately 94% was focused on Mavis Lake, with almost
all Mavis Lake expenditure allocated to drilling, field geological support assays and exploration
consumables. ~AUD$1.1 million of exploration expenditure related to activity drilling and drillingbased supervisory activities completed in CY2023.
Cash Position
The Company held cash and cash equivalents of approximately AUD$3.4m as at 31 March 2024.
Page 8 of 11
Other Disclosure
As disclosed under item 6 in the Appendix 5B, the Company made payments to related parties for
a total consideration of AUD$158k. This consideration relates to payments attributable to routine
Director fees, salaries and statutory superannuation.
Corporate Activity
Annual Report and Annual General Meeting
The Company released its Annual Report for the period ended 31 December 2023 on 23 March
2024. The Annual Report allows for a period of reflection on the Company’s achievements over
CY2023. With over 24,000 drill metres completed, two Maiden MRE’s released, and progression of
key technical aspects and permitting/community relations actions, the Critical Resources team
delivered excellent operational performance throughout CY2023.
The same diligence and focussed effort is carried into CY2024, with the Company buoyant about
the future of the lithium industry and the role Mavis Lake will play in supplying the North American
market.
The Company advised of its Annual General Meeting (AGM), to be held at the South of Perth
Yacht Club (corner of Duncraig and Canning Beach Roads), Applecross, Western Australia 6153,
on Thursday 30 May 2024, at 9:30 am (AWST). A formal notice of meeting has been prepared and
distributed, the Company welcomes all shareholders to attend the AGM.
Key ASX Announcements during the Quarter and since
17 April 2024
8km of Highly Prospective Anomalies and Follow-up Targets
28 March 2024
2023 Annual Report to Shareholders
18 March 2024
1.25km Lithium Trend at Tot Pegmatite
4 March 2024
PDAC Presentation
13 February 2024
Strong Assay Results Extend Mavis Lake Lithium Deposit
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is focused on the exploration, development and delivery of the critical metals required for a
decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada which are ideally positioned
to participate in the rapidly growing North American battery materials supply chain.
Page 9 of 11
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPLIANCE STATEMENT
This announcement contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX
market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
This announcement contains information on the Mavis Lake Lithium Project extracted from ASX market announcements
dated 25 October 2021, 21 July 2022, 25 October 2022, 31 October 2022, 20 December 2022, 27 March 2023, 16 June
2023, 27 June 2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023
24 October 2023, 15 November 2023, 13 February 2024, 18 March 2024 and 17 April 2024 reported in accordance with
the 2012 JORC Code and available for viewing at www.criticalresources.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in any original ASX market
announcement.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projects based on new
information, future events or otherwise except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Page 10 of 11
Appendix 1 – Schedule of mineral tenements at 31 March 2024
Claim Number
Project /
Location
Disposed
interest
during
quarter
Interest at
end of
Quarter
101034, 101215-101218, 101616-101619, 101758, 102759,
103512, 107330-107331, 107432, 107452-107454, 109871,
110434, 110703, 116242-116243, 116376, 116481, 116833,
117689-117690, 121130, 122424, 123068, 124332, 126738,
128065, 128770, 129509, 130111, 130299-130330, 135026,
135728, 138331, 138446, 139468-139470, 139609-139610,
140299, 141103, 141801, 143041, 143046-143047, 144330,
144441, 145544-145546, 145568, 145570-145572, 151583151585, 151642,157160- 157161, 158448, 158546, 158921,
160267, 160902, 166897, 167079-167080, 167677, 168187168188, 168229, 168328-168329, 170252, 174132-174134,
174153, 176105, 176198, 179416-179418, 179741-179743,
180192, 108489, 181000, 181037, 182187, 183051-183052,
186194, 187649, 188359, 189624, 190960-190961, 191576,
192111-192112, 192114-192115, 192814, 195537, 196153196154, 196277 – 196278, 197591, 198244-198246, 199857,
201802, 203140-203142, 203594, 203763, 204202, 204223204224, 205589, 205676, 207864, 209134-209136, 210239,
210345-210347, 210372-210374, 210439, 211060-211061,
212294-212295, 214215, 215413, 215824, 216365-216366,
217064, 218430, 227456-227457, 228108, 228777-228778,
229375, 229402-229404, 230161- 230162, 231619-231620,
233613-233614, 233867, 234258 ,234948, 235582, 239067,
240149, 240258, 240281, 240947, 246549, 247620, 248263248968, 253509-253510, 254970, 256451-256452, 256960,
257849, 257852, 259169, 259285, 262170, 262949, 264260,
264285, 266452, 267141, 268289, 270261, 270910, 271534,
271591, 272225-272226, 273079, 273609, 274526, 275823275825, 278758, 280340, 281841, 282015, 282234-282235,
283653-283655, 284320-284321, 285690-285691, 286761286763, 287377, 287379, 287408, 289910, 290059-290060,
290357, 290972, 291666-291667, 292149, 295414-295418,
296097, 296098, 302230, 303032, 303733-303734, 305020305022, 306990, 307466- 307467, 308112, 308122, 308140308141, 310379-313380, 312334, 314170-314171, 314748,
314826-314827, 316293- 316294, 316884, 325843, 326459,
329628-329631, 329632, 330228, 330271, 330895, 335072,
335696, 336398-336399, 340670, 340962, 341294-341295,
341823, 341947-341948, 342579, 343250, 630666-630911,
703383- 703516, LEA-108830 – LEA-108835, 76805-765816,
766092-766191, 766195-766294, 766540-766589, 766636766685, 766745-766794, 766848-766898
Acquired
Interest
during
quarter
Mavis Lake
Ontario
Canada
-
-
100%
-
100%
0%
-
-
100%
-
-
100%
-
-
59.5%
-
-
65%
-
-
51%
Block 5
Plaid &
Whiteloon
Lake
Ontario
Canada
Graphic Lake
Ontario
Canada
Halls Peak
NSW
Australia
Halls Peak
NSW
Australia
Oman
Block 4
Oman
710276-710332, 710441-710491, 710659-710826, 710995711044, 717564-717591
659224-659228, 659230-659241, 686985 – 686998, 702287702311, 702357-702389,
EL 4474, EL 9428 – EL9430
EL 7679
Page 11 of 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Critical Resources Limited
ABN
Quarter ended (“current quarter”)
12 145 184 667
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(53)
(53)
(b) development
-
-
(c) production
-
-
(d) staff costs
(317)
(317)
(e) administration and corporate costs
(322)
(322)
-
-
25
25
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
(59)
(59)
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(726)
(726)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(2)
(2)
(1,449)
(1,449)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(1,451)
(1,451)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(16)
(16)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Repayment of lease liabilities)
(30)
(30)
3.10
Net cash from / (used in) financing
activities
(46)
(46)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,496
5,496
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(726)
(726)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,451)
(1,451)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(46)
(46)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
85
85
4.6
Cash and cash equivalents at end of
period
3,358
3,358
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
3,123
5,177
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (security deposits)
235
319
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,358
5,496
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
1581
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
0
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
1 Related party
payments are attributable to director fees and salaries.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecu
Share your feedback
Discover