Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
26 July 2024
June 2024
Quarterly Activities Report for the period ending June
30 2024
Highlights
•
New JORC compliant Exploration Target completed for the Mavis Lake Lithium
Project. Estimated range of potential mineralisation: 18 to 29 million tonnes at 0.8 to
1.2% Li2O* (excludes current Mineral Resource Estimate of 8Mt@1.07% Li2O).
•
Release of airborne magnetic survey revealing numerous magnetic anomalies
closely associated with other geochemical anomalies identified from parallel
exploration work streams from 8km of highly prospective ground at Mavis Lake’s
Gullwing and Tot Prospects – follow-up targets identified.
•
Major new LCT pegmatite system discovered to the east of the Mavis Lake Main
Zone, including multiple spodumene-bearing pegmatites.
•
Outstanding ore sorting test work results for Mavis Lake, including preliminary results
and bulk results release subsequent:
- Follow up bulk sample XRT sorting successful in separating waste rock from
pegmatite, with 97% waste rock rejection and near 100% of spodumene
recovered to product, achieving a 30% increase in feed grade.
- Preliminary UV-laser spodumene direct sorting successfully produced a highgrade 1.65% Li2O spodumene ore concentrate, with increased waste rejection
compared to XRT.
•
Completion of operational review and board/management changes to reduce
corporate overheads and prioritize ongoing expenditure on exploration, resource
growth and other growth opportunities.
•
Presentation of flagship Mavis Lake Project at the RIU Sydney Resources Round-up
conference.
Overview
Lithium exploration and project development company Critical Resources Limited (ASX:CRR)
(“Critical Resources” or “the Company”) is pleased to report on its activities for the quarter ended
30 June 2024 (“the Quarter”). During the period, the Company remained firmly focused on the
development of its primary asset in Ontario Canada, the Mavis Lake Lithium Project (“Mavis Lake”).
* The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient
exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a
Mineral Resource.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
Located in immediate proximity to utilities, services and transport infrastructure essential to support
a future mining operation, Mavis Lake is well positioned to become a long-term supplier of lithium
products to North America’s rapidly growing battery minerals and electric vehicle sector.
Operational Activities
Mavis Lake Lithium Project (100%) – Ontario, Canada
Exploration
Release of Exploration Target
During the Quarter the company announced a JORC Code 2012 compliant Exploration Target
(“the Target”) for the Mavis Lake Lithium Project. The estimated range of potential mineralisation
is: 18 - 29 million tonnes at 0.8 - 1.2% Li2O* (see Table 1 below) (excludes current Mineral Resource
Estimate of 8Mt@1.07% Li2O).
The new Target is based upon the exploration potential of the Mavis Lake Main Zone (where the
current MRE is located), along with the precinct’s Northern Prospects, focused on the Gullwing and
Tot pegmatites.
The Target, aimed at achieving a significant Resource base in North-western Ontario, excludes the
current 8.0Mt @ 1.07% Li2O Inferred Mineral Resource Estimate (MRE).
Table 1 provides a summary of the Exploration Target including tonnage and grade ranges of each
key Prospect ready to be drill tested.
Table 1 – Summary of Project Exploration Target
Prospect
Tonnes Range (Mt)
Li2O Range (%)
Minimum
Maximum
Minimum
Maximum
Main Zone Extension Exploration Target
8
14
1
1.2
Gullwing Exploration Target
7
10
0.3
1.2
Tot Exploration Target
3
5
0.8
1.2
Project Exploration Target
18
29
0.8
1.2
Cautionary statement - The Exploration Target has been prepared and reported in accordance
with the 2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target
is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and
it is uncertain if further exploration will result in the estimation of a Mineral Resource.
The Mavis Lake Project Area is a single contiguous claim area, covering a massive ~23,000
hectares. The Project Area has known spodumene-bearing pegmatites throughout its entirety,
many of which are yet to be drill tested.
The Exploration Target highlights the potential for a large-scale lithium project. It includes the
entirety of the Mavis Lake Project Area, with a primary focus on known pegmatites that have
proven significant lithium mineralisation from spodumene.
Page 2 of 15
Geological modelling and wireframing of the pegmatites included in the exploration model
derived from inferred resource shapes, outcropping pegmatites including structural measurements
and detailed geological interpretations.
UAV-Borne Magnetic Survey Data Identifies New Drill Targets
High-resolution magnetic data collected by UAV survey late last year has identified prospective
new drill targets along the highly promising 8km, East-West trend between the spodumene-bearing
Gullwing and Tot Pegmatites within the Northern Prospects of the Mavis Lake project.
The survey has identified multiple North-South linear trends exhibiting magnetic lows, analogous to
the trends observed in the Gullwing and Tot pegmatites. These magnetic anomalies are
interpreted as either being the extension of known pegmatites, the presence of additional
pegmatites, or previously undiscovered significant structural features.
Prospective structures have been identified within areas that contain anomalies with elevated
levels of lithium, caesium, and rubidium.
Building on previous exploration results, incorporating historical rock-chip and channel sampling
data, litho-geochemical sampling and the multiple Li, Cs, Rb Mobile Metal Ion (MMI) results across
the Northern Prospects, the Company is increasingly confident that significant LCT-Type
mineralisation is associated with the magnetic low structures identified from the airborne magnetic
survey.
Figure 1: The residual magnetic intensity (RMI) of the Northern Prospects identifying numerous
North-South magnetic breaks (depicted by dashed black lines) assessed as being caused
by possible LCT pegmatite occurrences.
Page 3 of 15
Figure 2: Priority targets identified through overlaying MMI soil survey lithium results with the
Aero-magnetic survey results – illustrating geochemical relationships with magnetic low
structures.
New LCT Pegmatite System Discovered at Mavis Lake East
During the Quarter Critical Resources announced the discovery of 31 new LCT pegmatites
to the east of the Mavis Lake Main Zone, including multiple spodumene-bearing pegmatites.
Following the commencement of a field work program comprising prospecting, mapping
and sampling in May, a total of 83 grab samples were collected to assess lithium
mineralisation from spodumene, as well as fractionation and concentrations of Lithium,
Rubidium, Caesium and Tantalum. Key results are shown in Table 2 and Figure 3.
Results from this program was received subsequent to the Quarter end. Highlights include:
•
High-grade lithium results ranging from 2.07% to 5.12% Li2O in grab samples across the
~100-metre extensions of spodumene-bearing Pegmatites 7 and 24.
•
Up to 1.17% Li2O at the ~250-metre extension of spodumene-bearing Pegmatite 20.
•
Up to 2.76% Li2O in grab samples from Pegmatite 19.
Page 4 of 15
Figure 3 – Plan map showing locations of grab samples and discovery reference areas.
Table 2: Significant Assay Results from the May 2024 Summer Prospecting Program
Sample ID
Easting
Northing
Li (ppm)
Li2O (%)
Cs (ppm)
Rb (ppm)
Ta (ppm)
Pegmatite
Type
846868
524679
5517902
23800
5.12
254
738
52.4
Pegmatite 7ext
Outcrop
846831
524661
5517907
19800
4.26
81.9
486
14.4
Pegmatite 7ext
Outcrop
846751
526343
5518601
12800
2.76
658
5000
200
Pegmatite 19
Outcrop
846832
524690
5517914
12800
2.76
61.4
830
186
Pegmatite 7ext
Outcrop
846782
524972
5517685
10200
2.20
101
1930
60.2
Pegmatite 20
Outcrop
846803
526233
5518362
10000
2.15
370
3070
168
Pegmatite 19
Float
846787
524670
5517898
9610
2.07
204
538
50.1
Pegmatite 7ext
Outcrop
846788
524873
5517479
8800
1.89
175
2240
89.2
Pegmatite 20
Outcrop
846834
524868
5517459
7370
1.59
189
2780
96.9
Pegmatite 20
Outcrop
846829
525037
5517830
5420
1.17
15.1
53.4
2.4
Pegmatite 20ext
Outcrop
846817
525041
5517825
5290
1.14
24.8
105
5.2
Pegmatite 20ext
Outcrop
Page 5 of 15
Figure 4 – Coarse spodumene at Pegmatite 7 (assays confirm grades up to
5.12% Li2O).
Advanced planning has been completed for the positioning of drill pad locations targeting
known spodumene-bearing pegmatites within the Northern Prospects (Gullwing and Tot).
Planning and permits are in place to undertake mechanical stripping and channel sampling
of the Tot Pegmatite.
Highly Encouraging XRT and UV-Laser Ore Sorting Testwork Results
Outstanding results were reported from the preliminary ore sorting test work program on ore
from the Mavis Lake Lithium Project.
The Company has been working closely with Saskatchewan Research Council (SRC) and
STARK Resources to complete mineralogy and ore sorting investigations to assess the
amenability of Mavis Lake ore to pre-concentration by ore sorting.
A 150kg sample was chosen to focus on the range of lithologies evident at Mavis Lake.
Excellent results have shown that Mavis Lake ore is highly amenable to both waste rock
separation and pre-concentration using ore sorting technologies, warranting further test
work.
X-Ray Transmission (XRT) ore sorting amenability test work was completed by SRC on all Mavis
Lake lithologies which were crushed and screened to +10mm -25mm sizing. The first stage of
test work was a static scan of crushed ore to capture the ore response to XRT scanning.
Page 6 of 15
A second stage dynamic XRT sorting trial was successful in separating waste rock from
pegmatite - 98% of waste rock reported to rejects, while 99% of spodumene was recovered
to sorter product.
Test work results show a clear distinction in the XRT response of the waste rock compared to
pegmatite, indicating high amenability of Mavis Lake ore to pre-concentration by XRT ore
sorting. Waste ore sorting can be integrated into the Mavis Lake flowsheet to upgrade mined
ore in the coarse, dry phase, reducing feed contaminants and increasing spodumene
concentrate production.
Figure 5 - Dynamic XRT ore sorting results showing separation of pegmatites (left) from waste rock (right).
Table 3 - Dynamic XRT Sorting Trial - Mineral Balance
Stream
Mass
Distribution (%)
kg
%
Spodumene
Quartz
Albite
Muscovite
Biotite
Orthoclase
Holmquistite
Hornblende
XRT Product
20.3
71
99.3
68.2
95.7
93.7
22.6
79.4
1.2
2.0
XRT Waste
8.2
29
0.7
31.8
4.3
6.3
77.4
20.6
98.8
98.0
Feed (calc.)
28.5
100
100
100
100
100
100
100
100
100
UV-laser based spodumene ore sorting exploits the unique response of spodumene to UV
light and is the only sorting technology that targets spodumene directly. A static, stage one
amenability study was completed by Stark Resources on all Mavis Lake lithologies, which
were crushed and screened to +10mm -25mm sizing.
The UV sorter clearly identified spodumene within all pegmatites, indicating high amenability
of Mavis Lake ore to pre-concentration by UV-laser based sorting. A second stage
dynamic UV sorting trial on a 28kg composite sample incorporated all Mavis Lake lithologies
and comprised 25% waste rock to reflect worst case dilution from full scale mining.
The trial successfully produced a high-grade spodumene ore concentrate, lithia
grade increased by a factor of 2.5, from 0.65% Li2O in the feed to 1.63% Li2O in the ore
concentrate. Furthermore 96% of Fe2O3 was rejected. The lithia content of the waste
rejects was low at 0.28% Li2O.
Page 7 of 15
Figure 6 - Dynamic UV ore sorting trial results showing spodumene ore concentrate with its
characteristic UV response (top) and waste minerals with no response (bottom).
Table 4 - Dynamic UV Sorting Trial – Lithia and Iron Balance
Grade
Mass
Distribution
Li2O
Fe2O3
Li2O
Fe2O3
Stream
kg
%
%
%
%
%
UV Product
7.8
28
1.63
0.59
69
4
UV Waste
20.4
72
0.28
6.12
31
96
Feed (calc.)
28.2
100
0.65
4.59
100
100
The results show the promising potential of UV-laser based spodumene direct sorting to
produce coarse spodumene ore concentrates from mined ore.
Page 8 of 15
This provides opportunities to reduce the capital cost, operating cost and total impact
(footprint and energy intensity) of hard rock lithium processing operations through increasing
spodumene concentrate production and reducing tailings volume.
Critical Resources has developed a comprehensive metallurgical test work program to
support the development of the Mavis Lake Project.
Encompassing the full beneficiation flowsheet, the program is being conducted in three
phases. SRC has been engaged to complete the Phase 1 scope, with over 1,600kg of drilled
core delivered during the quarter to the SRC facility in Saskatoon, which was completed
subsequent to the Quarter end.
A total of 1,650kg of drill core was submitted to Saskatchewan Research Council (SRC) for
feasibility level testing. The sample suite of drill core represents 11 pegmatite intercepts
totalling 196m across four HQ drill holes, from a range of spatial locations within the current
mineral resource estimate (MRE) at Mavis Lake.
The sample suite included ore from depths ranging from 52.7m – 249.3m below surface. The
sample suite also comprised waste rock intended to be representative of typical dilution
expected from conventional mining methods
The samples were separated into two lithology composites. The Standard Pegmatite
composite consists of pegmatites more than 0.5m from the host rock contact zone. These
pegmatite samples comprised zero (0) waste rock dilution and are generally coarser
grained. This is the predominant pegmatite mineralogy at Mavis Lake.
The Contact Zone Pegmatite composite consists of pegmatites within 0.5m of the host rock
contact zone. These pegmatite samples are generally finer grained and more altered. The
Contact Zone Pegmatite composite also comprised ~40% waste rock to reflect worst case
mining dilution.
Although Contact Zone pegmatites are a minority within the Mavis Lake deposit, their distinct
mineralogy and increased likelihood of mining dilution warrant in depth metallurgical
investigation.
Ore sorting has become increasingly adopted in hard rock lithium mining to effectively
pre-treat contact zone pegmatites. Ore sorting is employed to reject waste rock and
mining dilution from ROM feed, pre-concentrating the ore prior to downstream
processing.
This has the advantage of increasing feed grades to the processing plant, de-bottlenecking
dense medium separation (DMS) and flotation circuits, increasing spodumene production
and improving concentrate quality.
The phase I bulk testwork results was successful in showing that ore sorting achieved 40%
mass rejection to waste, removing 100% of iron bearing waste minerals ferrohornblende
and holmquistite.
Spodumene recovery to sorter product was 100%. Lithia grades increased by 30%, from
1.00% Li2O in sorter feed to 1.30% Li2O in sorter product. Iron was effectively reduced from
7.52% Fe2O3 in sorter feed to 0.49% Fe2O3 in sorter product.
Page 9 of 15
The bulk ore sorting testwork results confirm the findings of amenability studies completed earlier.
Mavis Lake ore is highly amenable to preconcentration by XRT sorting in the coarse, dry phase of
the flowsheet.
The ability to reject mining dilution prior to processing helps unlock the full potential of the Mavis
Lake resource. By removing iron bearing minerals early in the beneficiation flowsheet, the
performance of both dense medium separation (DMS) and flotation processes can be optimised.
This facilitates higher plant throughout rates, increased spodumene recoveries and an improved
spodumene concentrate quality.
Graphic Lake Lithium Project (100%) – Ontario, Canada
With the Company focusing its working capital on the Mavis Lake Project, no exploration activities
were completed during the Quarter.
Halls Peak Project – New South Wales, Australia
With the Company focusing its working capital on the Mavis Lake Project, no exploration activities
were completed during the Quarter.
Vermillion Bay Project - (100%) – Ontario, Canada
During the Quarter, the Company through its subsidiary group staked additional land in Canada
comprising of 50 claim cells of ~1,000 hectares near the towns of Vermillion Bay, Dryden and the
city of Kenora. The Project is located proximal to nearby projects such as Beyond Lithium’s Victory
Project and Pioneer Lithium’s Benham projects.
The Vermillion Bay Project is also located only ~70km east of Critical Resources' Mavis Lake Project
Area. The project is overall under explored and yields potential for future spodumene-bearing
pegmatite discoveries.
The Vermillion Bay Project is located on the boundary between the Winnipeg River and Wabigoon
subprovinces in the Medicine Lake area. This area was first explored in 1949 by E. Sobiski, who
identified it as a beryl-beryllium prospect. Later, in 1976, Pryslak delineated the Medicine Lake
Pluton. This pluton, approximately 0.5 by 1.5 km in size, is recognized as a fertile pluton based on
analysis of highly fractionated potassium feldspar samples conducted by Breaks and Tindle in 1997.
According to Ontario Geological Survey mapping, the main geological formations in the area
encompass metasediments and metavolcanics, with granitic intrusions in the vicinity of the two
defined projects.
The Vermillion Bay Project area is located ~50 km east of Kenora and ~60 km west of Dryden with
nearby infrastructures including Pacific Railway (CP Rail) and network along the within the claim
boundaries of the Project, access via Trans-Canada Highway and Highway 17 that connect to
Kenora and Thunder Bay 20-minute commute time from the nearest town of Vermilion Bay, and
Power line along Highway 17.
The Company considers this to be a Greenfield exploration opportunity.
Page 10 of 15
Figure 7 – Location map showing Vermillion Bay project and located of proximal projects.
Sohar Block 4 and 5 Project – Sultanate of Oman
No exploration activities were completed during the Quarter. As previously advised, the Company
was advised by the Ministry of Energy and Minerals, Sultanate of Oman, that the exploration
licences over Block 4 and Block 5 had expired and would not be renewed as they had reached
the end of their stated renewal period. During the quarter, the Company submitted applications
for the extension of the Block 5 mining licences with their pending expiration date in mid July. The
Company is awaiting confirmation from the ministry with regards to these applications. While the
Company indirectly retains a majority shareholding and associated asset interests in Al Fairuz
Mining (AFM) LLC and Al Thuraya Mining (ATM) LLC, the Company continued to engage in
discussions with the in-country management regarding the future of these business entities and
associated assets.
Subsequent to the end of the Quarter, Gentor Resources Limited, a indirectly wholly owned
subsidiary of the Company, received a notice of default from Savannah Resources Plc in respect
of contributions it claims are owing under a deed entered into between the parties in relation to
the Block 5 Project in Oman. Gentor Resources Limited disputes that an event of default has
occurred and intends to vigorously defend any proceedings that may be brought by Savannah
Resources Plc.
Schedule of mineral tenements
The Company’s tenement and claim schedule can be seen in Appendix 1.
Page 11 of 15
ESG and Sustainability
During the Quarter the Company continued its regular engagement with First Nations
Communities through regular communication and consultation.
The Company continued the Mavis Lake Area-of-Focus Environmental Baseline Studies,
wildlife monitoring, through the use of trailcams during the Quarter, with no ‘species-at-risk’
being identified.
Finance
Exploration Expenditure
The Company invested approximately AUD$350k in exploration activities across its project portfolio
during the Quarter, approximately 97% was focused on Mavis Lake, with almost all Mavis Lake
expenditure allocated to field geological support assays and exploration consumables.
Cash Position
The Company held cash and cash equivalents of AUD$2.26m as at 30 June 2024.
Other Disclosure
In accordance with ASX Listing Rule 3.16.3, BDO Audit Pty Ltd (“BDO Audit”) has been appointed
as auditor of the Company. The appointment follows the resignation of BDO Audit (WA) Pty Ltd
(“BDO WA”) and ASIC’s consent to the resignation in accordance with section 329(5) of the
Corporations Act 2001 (Cth) (“the Act”).
The change in auditor arose as a result of BDO WA restructuring its audit practice whereby audits
will now be conducted by BDO Audit, an authorised audit company, rather than BDO WA.
Corporate Activity
Operational Review and Board Changes
Due to ongoing challenging market conditions and weak sentiment in the lithium sector, the Board
has commenced an operational review aimed at reducing costs and minimizing corporate
overheads, prioritising ongoing expenditure on exploration and resource growth and other growth
opportunities.
As such during the quarter the Company advised that Managing Director Alex Cheeseman would
be stepping down, effective from the 14 June 2024.
During Mr Cheeseman’s tenure, the Company defined a JORC 2012 compliant Maiden Mineral
Resource Estimate for the Mavis Lake Project, expanded the project area to incorporate a suite of
highly prospective exploration targets, initiated multiple study streams to advance the project
towards feasibility-level assessment and took significant steps towards fostering positive
relationships with the First Nations Groups and local communities in the project area.
Page 12 of 15
The Managing Director position will be held vacant in the immediate term, with the Company
electing to reduce to a three-man Board of Directors. The Company’s board will assume day-today management functions until a suitable candidate is found.
The Company will continue to and is evaluating multiple critical minerals opportunities globally.
2024 Annual General Meeting
The Annual General Meeting took place in Perth on Thursday 30 May 2024, with all Resolutions
passed by a poll.
Attendance at RUI Sydney Resources Round-up, Sydney
Critical Resources presented at the RIU Sydney Resources Round-up conference in Sydney in midMay 2024.
Key ASX Announcements during the Quarter and since
17 April 2024
8km of Highly Prospective Anomalies and Follow-up Targets Identified at
Gullwing and Tot Prospects
2 May 2024
Outstanding Ore Sorting Testwork Results for Mavis Lake
22 May 2024
Mavis Lake Exploration Target Highlights Potential for Large-scale Lithium
Project in North-West Ontario
29 May 2024
Major New LCT Pegmatite System Discovered at Mavis Lake East
7 June 2024
Operational Review and Board Changes
2 July 2024
Exceptional Lithium Assay Results of up to 5.12% Li2O at Mavis Lake
8 July 2024
Bulk Ore Sorting Testwork Achieves High Spodumene Recovery and
Improved Feed Grades
Presentations during the Quarter and since
8 May 2024
RIU Sydney Resources Round-up
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
Page 13 of 15
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is focused on the exploration, development and delivery of the critical metals required for a
decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada which are ideally positioned to
participate in the rapidly growing North American battery materials supply chain.
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPLIANCE STATEMENT
This announcement contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX
market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed.
This announcement contains information on the Mavis Lake Lithium Project extracted from ASX market announcements
dated 25 October 2021, 21 July 2022, 25 October 2022, 31 October 2022, 20 December 2022, 27 March 2023, 16 June
2023, 27 June 2023, 17 July 2023, 24 July 2023, 21 August 2023, 13 September 2023, 19 September 2023, 19 October 2023
24 October 2023, 15 November 2023, 13 February 2024, 18 March 2024, 17 April 2024, 2 May 2024, 22 May 2024, 29 May
2024, 2 July 2024 and 8 July 2024 reported in accordance with the 2012 JORC Code and available for viewing at
www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original ASX market announcement.
The information in this ASX Announcement that relates to Exploration Results is based on information compiled by Mr.
Troy Gallik (P. Geo), a Competent Person who is a Member of the Association of Professional Geoscientists of Ontario.
Troy Gallik is a full-time employee of Critical Resources. Mr. Gallik has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr. Gallik consents to the inclusion in this Announcement of the matters based on his information in
the form and context in which it appears.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projects based on new
information, future events or otherwise except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Page 14 of 15
Claim Number
Project /
Location
Disposed
interest
during
quarter
Interest at
end of
Quarter
101034, 101215-101218, 101616-101619, 101758, 102759, 103512,
107330-107331, 107432, 107452-107454, 109871, 110434, 110703,
116242-116243, 116376, 116481, 116833, 117689-117690, 121130,
122424, 123068, 124332, 126738, 128065, 128770, 129509, 130111,
130299-130330, 135026, 135728, 138331, 138446, 139468-139470,
139609-139610, 140299, 141103, 141801, 143041, 143046-143047,
144330, 144441, 145544-145546, 145568, 145570-145572, 151583151585, 151642,157160- 157161, 158448, 158546, 158921, 160267,
160902, 166897, 167079-167080, 167677, 168187-168188, 168229,
168328-168329, 170252, 174132-174134, 174153, 176105, 176198,
179416-179418, 179741-179743, 180192, 108489, 181000, 181037,
182187, 183051-183052, 186194, 187649, 188359, 189624, 190960190961, 191576, 192111-192112, 192114-192115, 192814, 195537,
196153- 196154, 196277 – 196278, 197591, 198244-198246, 199857,
201802, 203140-203142, 203594, 203763, 204202, 204223-204224,
205589, 205676, 207864, 209134-209136, 210239, 210345-210347,
210372-210374, 210439, 211060-211061, 212294-212295, 214215,
215413, 215824, 216365-216366, 217064, 218430, 227456-227457,
228108, 228777-228778, 229375, 229402-229404, 230161- 230162,
231619-231620, 233613-233614, 233867, 234258 ,234948, 235582,
239067, 240149, 240258, 240281, 240947, 246549, 247620, 248263248968, 253509-253510, 254970, 256451-256452, 256960, 257849,
257852, 259169, 259285, 262170, 262949, 264260, 264285, 266452,
267141, 268289, 270261, 270910, 271534, 271591, 272225-272226,
273079, 273609, 274526, 275823-275825, 278758, 280340, 281841,
282015, 282234-282235, 283653-283655, 284320-284321, 285690285691, 286761-286763, 287377, 287379, 287408, 289910, 290059290060, 290357, 290972, 291666-291667, 292149, 295414-295418,
296097, 296098, 302230, 303032, 303733-303734, 305020-305022,
306990, 307466- 307467, 308112, 308122, 308140-308141, 310379313380, 312334, 314170-314171, 314748, 314826-314827, 316293316294, 316884,
Share your feedback
Discover