Resources Rising Stars Investor Series - Presentation
Released
Released
Announcement PDF
ASX Announcement
15 September 2023
Resources Rising Stars Investor Series - Presentation
Lithium exploration and project development company Critical Resources Limited ASX:CRR
(“Critical Resources” or “the Company”) advises of its participation at the Resources Rising Stars
Investor Series being held in Brisbane, Sydney and Melbourne during 18 to 20 September 2023.
Managing Director, Mr Alex Cheeseman, has been invited to attend the investor series to discuss
and present the Company’s projects, the series of events features a group of high-growth resource
companies that are highly leveraged to the impending global energy transition. Attached is the
presentation that Mr Cheeseman will be speaking to at the investor series.
Attendance is free of charge for all genuine investors, registration is essential.
Dates
Brisbane. Monday, 18 September 2023
Sydney. Tuesday, 19 September 2023
Melbourne. Wednesday, 20 September 2023
Time:
Brisbane. 11.30am to 2.30pm (local time)
Sydney and Melbourne. 3.00pm to 6.00pm (local time)
To register:
https://resourcesrisingstars.com.au/event1/events (twilight series)
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9389 4499
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED
Critical Resources is advancing and developing critical metals projects for a decarbonised future. The Company holds
a suite of lithium prospects across Ontario, Canada, including Mavis Lake, Graphic Lake, Plaid and Whiteloon Lake.
The Company’s other projects include a copper project in Oman, and a base metals project in Halls Peak NSW,
Australia. The Company’s primary focus is the rapid development of its flagship Mavis Lake Lithium Project. Mavis Lake
is an advanced exploration project with near-term development potential. The Company completed over 19,500m of
drilling in 2022 and has commenced another significant drilling program in 2023. In early 2023, Critical Resources
released its maiden JORC Code 2012 Compliant Inferred Mineral Resource Estimate (MRE) for Mavis Lake with 8.0Mt
at 1.107% Li2O – making Critical Resources just one of two ASX-listed companies with a JORC Code 2012 compliant
mineral resource in Ontario. In parallel, the Company has also commenced initial studies that will underpin the transition
from explorer to developer.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
COMPLIANCE STATEMENT
This announcement contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX
market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed. This document contains information on the Mavis Lake Lithium Project extracted from ASX market
announcements reported in accordance with the 2012 JORC Code and available for viewing at
www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original ASX market announcement. ASX announcements pertaining to key
assays are as follows: Multiple thick lithium intercepts continue at Mavis Lake dated 11 September 2023, High Grade
Intercepts Extend Mavis Lake Swell Zone dated 21 August 2023 and Assay Results confirm 74.4m at 1.18% Li2O at Mavis
Lake dated 24 July 2023.
FORWARD LOOKING STATEMENTS
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Critical Resources Limited does not make any representations and provides no warranties concerning the accuracy of
the projections and disclaims any obligation to update or revise any forward-looking statements/projects based on new
information, future events or otherwise except to the extent required by applicable laws. While the information
contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its directors, officers,
agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Page 2 of 2
ASX : CRR
Lithium Supply for North America
September 2023
Corporate Overview
Lithium-focused project development company
Strategic Highlights
Project location and existing infrastructure provides significant
operational and financial advantages
The Right
Place
The Right
Project
The Right
Pathway
Exceptional location and
high-growth market
8Mt @ 1.07% Li2O, growth
potential and excellent
metallurgical properties*
Clear pathway to advance
the Project and deliver
lithium products to market
Supportive Provincial and Federal Governments – plus potential
access to US Government support
Unprecedented investment into North American electric vehicle
supply chains
Cost effective exploration delivered a maiden resource after 11
months of drilling
Resource growth drilling continues, multiple mapped spodumene
bearing pegmatites yet to be drill tested
Met testwork delivered high recoveries (up to 87%) with excellent
concentrate grades (5.9-6.4% Li2O)*
Aggressive project development activity with continued resource
growth
Immediate access to global markets from existing logistics
infrastructure (road, rail and port)
Environmental monitoring and community consultation ongoing
Development Team leveraging lessons learnt from previous hard
rock lithium projects
Corporate Presentation 2023 |
* Refer to Appendix for ASX announcement dates
Corporate Snapshot
Shareholder Makeup
Capital Structure
Board and Management
Share Price (5 September 2023)
$0.041
Shares
1.78b
Market Cap. (undiluted)
$72.8m
Cash (30 June 2023 + gross funds raised 8 Aug 2023)
$12.1m
Options (47m - $0.04 strike – expiry 3 Dec 24)
$1.88m
Performance Rights
Share Price Movement (1 year)
Institutional Holders
Other
HNW
17m
Focus Areas for Value Creation
Resource Growth through continued drilling and
exploration of high-confidence targets
+
Development activities in parallel with Resource
Growth
+
Advance the Project into Production diligently
and at pace in order to capitalise on a
significant supply/demand gap
Corporate Presentation 2023 |
Board and Management
Alex Cheeseman
Managing Director
Harry Spindler
CFO and CoSec
20+ years leadership and management across projects
and operations. 7 years dedicated to the lithium
industry(former GM Altura Mining).
Over 15 years experience in ASX listed CoSec/CFO roles.
Extensive experience building and managing highperformance teams operating in multiple jurisdictions.
Considerable experience with M&A, capital raising and
ASX compliance.
Robert Martin
Troy Gallik
Non-Executive Chairman
An accomplished corporate professional and certified CA.
Exploration Manager (Exploration CP)
A successful businessman and accomplished company
Director with over 25 years’ experience across mining and
mining services.
Professional Geologist with 8 years of grass roots
exploration and field work across Ontario, targeting gold
and lithium.
Significant experience in capital markets and corporate
strategy. Chairman of ASX:BM8, ASX:EQN and ASX:PLN,
NED of ASX:PKD and TSX:VCT.
Designed and managed the exploration program that
delivered a Maiden JORC Code 2012 Compliant lithium
resource (8Mt @ 1.07% Li2O), 12 months from first drill hole.
John Markovic
Stewart Bailey
Non-Executive Director
Study Manger
Highly successful businessman, with proven history in value
creation.
Civil Engineer with over 15 years' experience in greenfield
and brownfield mining project development and delivery.
Strategic expertise in marketing, financial planning and
risk management.
6 years lithium experience (Altura Mining/Covalent Lithium).
Track record in achieving high-growth for shareholders.
Key experience with process plant (DMS and flotation)
project delivery, start-up and de-bottlenecking.
Anthony Tse
Brady Jenkins
Strategic Advisor
Early pioneer and veteran of the lithium industry.
Former CEO of Galaxy/Allkem – now the 5th largest lithium
producer.
Extensive
strategy,
management
and
investment
experience across the battery value chain globally.
Principal Process Engineer (Met. CP)
Metallurgist and Member of AusIMM, over 20 years project
and operations experience, 5 years dedicated to lithium
processing.
Former Processing Superintendent at Altura Mining
Corporate
Presentation
2023 |
responsible for operational readiness,
process
plant
commissioning and early-stage optimisation.
The North American Lithium Opportunity
From 47 GWh of battery capacity in 2022 to 650 GWh of battery capacity in 2035 – Source BMI
Massive Onshoring of the USA/Canada Battery Supply Chain
Security, Geopolitical and Environmental
Concerns Drive The Need For US Domestic
Production
IRA Program offering US$370B in incentives for Domestic Critical
Mineral Production
2022 Lithium Extraction by Country (Kt, LCE)
1%
North America
31%
44%
South America
China
Australia / Other
24%
Source: Wood Mackenzie
2022 Lithium Conversion by Country (Kt, LCE)
3%
DOE Clean Vehicle Tax Credit
Critical Minerals (US$3,750), Battery Components (US$3,750)
Proportion of critical
mineral content or
battery cell
manufacture
extracted or
processed:
– in the US
– with a FTA with the
US
– recycled in North
America
Critical Minerals
Proportion minimum
requirements:
– 2024: 50%
– 2025: 60%
– 2026: 70%
– 2027 (onwards): 80%
Battery Components
minimum requirements:
– 2024: 60%
– 2025: 60%
– 2026: 70%
– 2027: 80%
– 2028: 90%
– 2029 (onwards):
100%
North America
Advanced Manufacturing Credit
31%
66%
South America
China
Source: Wood Mackenzie
Eligibility of Investment Tax Credit and Production Tax Credit
“Advanced manufacturing credit” of 10% of the costs incurred to produce
the mineral for any producers of critical minerals that currently mine or
process critical minerals in the US Source: Wood Mackenzie (December 2022)
Corporate Presentation 2023 |
New Raw Material Supply is Essential to Domestic EV Production
Significant amount of funding available to support to build mid-stream materials, downstream cell
production and EV manufacturing capacity with a risk of significant under-utilization if insufficient local
supply of raw materials
Source: Wood Mackenzie (December 2022)
Kings Mountain
(Albemarle)
Rhyolite Ridge (INR)
Nth Carolina (PLL)
Thacker Pass (LAC)
Bessemer City (Livent)
Silver Peak (Albemarle)
Tesla internal forecast
requires 1Mt LCE for
2030 production
targets
James Bay (AKE)
Rose (CRE)
PAK (Frontier)
Authier (SYA)
Moblan (SYA)
Source: Tesla 2023 Investor Day
(1 March 2023)
NAL (SYA)
Whabouchi (Livent)
Bernic Lake (Tanco)
?
Corporate Presentation 2023 |
Sonora (Bacanora)
From Mavis Lake to Michigan
Corporate Presentation 2023 |
Mavis Lake Project
One of only two ASX-listed companies to hold a JORC Code 2012 Compliant Lithium Mineral Resource Estimate in Ontario Canada
Project Location
0
District Scale
20km
Corporate Presentation 2023 |
Project Highlights
JORC
Compliant
Resource
Maiden MRE - 8.0Mt at 1.07% Li2O* defined after only 11 months of drilling
Consistent high-grade intercepts
Targeting first Resource upgrade in H1 2024
Significant
Upside
Potential
Multiple spodumene-bearing outcrops yet to be drill tested
Expanded project area introduced the Gullwing, Tot, Little Wing and
Drope LCT pegmatite system
Significant mineralisation swell identified in July 2023*
Development
Focussed
Excellent metallurgical properties, simple flowsheet = low technical risk
High grade, low-impurity concentrate produced*
Development studies and environmental monitoring underway
Exceptional
Location
Residential operating concept = significant cost savings
Pathway to access hydro-electric power and natural gas
Direct access to road, rail and port infrastructure
Established logistics routes to major automotive/battery facilities
Over US$47Bn of battery/EV specific investment within the region
Corporate Presentation 2023 |
* Refer to Appendix for ASX announcement dates
Systematic and Robust Exploration
Year on Year Growth potential
Resource Backed Project - 8Mt @ 1.07% Li2O Inferred Resource with
multiple mapped, spodumene bearing pegmatites yet to be drill
tested
Main Zone Remains Open - current Resource remains open laterally
and at depth with a significant swell with multiple intercepts
ranging from 40-74m*
Cost Effective Resource Definition - AUD$1.02 spent in exploration
per tonne of Mineral Resource defined**
Focussed on continued Growth - drilling continues with additional
field works ongoing to develop and refine additional highconfidence drilling targets across the entire Project area
Results Pending - further assay results pending, every new drill hit
adds to a future Resource upgrade
** Spend per tonne of Mineral Resource is non-IFRS financial information and has not been subject to audit by the Company’s external auditor. Spend per resource
tonne has been calculated by dividing total direct exploration costs (drilling, technical management, core logging/cutting, assays and sample logistics) by every
tonne of lithium resource estimated (as advised on 5 May 2023). For all non-IFRS measures refer to financial disclaimer
Corporate Presentation 2023 |
* Refer to Appendix for ASX announcement dates
Pathway to Resource Growth
MF23-190: 14.7m @ 1.17% Li2O
MF23-211: 41m @ 1.18%
MF23-210: 41.25m @ 1.25% Li2O
Drill Pads targetting
Swell Zone – under
Application
MF23-207: 74.4m @ 1.18% Li2O
Results not included in Maiden MRE
Drilling ongoing and assays pending
MF23-214: 53.6m @ 10% spodumene*
MF23-225: 25.7m @ 20% spodumene*
MF23-226: 31.5m @ 15% spodumene*
MF23-212-MF23-226
Assays pending
MF22-178: 17.8m @ 1.41% Li2O
MF22-177: 16.3m @ 1.44% Li2O
MF22-072: 21.1m @ 1.34% Li2O
MF22-064: 15.52m @ 0.96% Li2O
MF22-121: 18.45m @ 2.06% Li2O
MF22-117: 23.9m @ 1.55% Li2O
MF22-116: 24.1m @ 1.62% Li2O
Corporate Presentation 2023 |
*Refer to Visual Cautionary Statement
Refer to Appendix for ASX announcement dates
Pathway to Resource Growth
Continued Drilling at Mavis Lake
Main Zone – Extension drilling to
immediate increase tonnage
over the current Resource, every
drill hit adds tonnage
Targeting the Swell Zone – new
drill pads to target Swell Zone to
the West under application
Step-out Drilling adjacent to
Main Zone – Multiple mapped
spodumene bearing pegmatites
yet to be drill tested,
Target Development at Northern
prospects – Geophysics and soils
program from Little Wing to Tot
Permits under application – Initial
drill pad permits for norther
prospects under application
Continued Prospecting – Field
crews continue prospecting and
target generation across the
Project Area
Resource Upgrade Scheduled –
Drilling data/results from April
2023 onwards to support future
Resource upgrade, every drill hit
adds tonnage
Corporate Presentation 2023 |
Infrastructure Rich
Regional base enables low-cost operations
Mining-centric Workforce - five operating mines within the
immediate area, with Provincial and Federal support for Critical
Minerals
Residential Operation - Lower cost operations with the opportunity
to offer family friendly employment opportunities to attract and
retain future workforce
Export Logistics - national highway and rail network provide direct
access to deepwater ports and US automotive manufacturing hubs
Energy supply - Hydro-power transmission lines, and gas pipeline
surround the property
Existing Support Base - logistics, schools, hospital, regional airport,
supplies and support all drawn from Dryden, provides significant
cost advantages
Corporate Presentation 2023 |
Permitting and Approvals
Monitoring and documenting the Environment
Baseline Environmental Assessment Completed - field based (Oct 22) and
desktop (Dec 22-Mar 23) environmental assessment completed, confirming
the forward work plan for future studies, monitoring and permitting
Environmental Monitoring Underway - springtime monitoring of surface
water run-off field works completed, fisheries and further hydrology
monitoring underway. Extensive monitoring program commitments for 2023
and 2024
1st Nations Agreement in Principle - signed with Wabigoon Lake Ojibway
Nation (WLON) in June 2023, setting the foundation for a future IBA and
informed consent for the development of the Mavis Lake Lithium Project
Dedicated Effort to Engage and Inform Communities - recruitment of a
senior Community Relationship Coordinator with over 20+ years First Nations
engagement and relationship development
Corporate Presentation 2023 |
Development Studies Delivering Results
Staying a step ahead on the pathway to production
Excellent Metallurgy - simple Heavy Liquid Separation (HLS)
delivered spodumene concentrate up to 6.4% Li2O with very low
Fe2O3. Optimisation work (HLS and flotation) delivered recoveries
up to 87%.*
Development Studies Underway - studies and assessments of
project economics, logistics options assessment, and flow sheet
development have commenced.
Extensive Met Test work Planning - test work program to allow
detailed design and engineering being planned, underpinned by
the known Resource, raw material collection in 2023 for
commencement in Q1 2024
Battery Grade Chemical Test work - planning under way to test end
to end yield and purity of lithium chemicals produced from Mavis
Lake raw material.
Corporate Presentation 2023 |
* Refer to Appendix for ASX announcement dates
Pathway to Lithium Chemical Supply
Concept review and development
Mining
Technology
options
Strategic
Cooperation
Mid-Stream
products
Processing
Product Logistics
Tolling
Policy and
Government
incentives
Value Add
Partnerships
Offtake
Corporate Presentation 2023 |
Building Momentum – Significant Growth
Catalysts for Value Creation
Resource Growth
H2 2023
H1 2024
H2 2024
Main Zone extension and infill
Geophysics and target development (Northern Prospects)
Initial drill testing Northern Prospects
Prospecting and target generation
Resource Estimation and upgrade
Project Development
Environmental monitoring
Feasibility-level metallurgical test-work
Studies (technical and economic)
Community engagement
Corporate Efforts
Partnering and collaboration assessments
Downstream chemical production concept development
Government engagement
Corporate Presentation 2023 |
Alex Cheeseman
Managing Director
Email: info@criticalresources.com.au
Tel: +61 08 9389 4499
ABN: 12 145 184 667
Level 50, 108 St Georges Terrace
Perth, Western Australia, 6000
ASX:CRR | CRITICALRESOURCES.COM.AU
Disclaimer
Summary Information This document contains a summary of information about Critical Resources Limited (“Critical Resources” or
“the Company”) and its activities that is current as at the date of this document unless otherwise stated. The information in this
document is general in nature and does not contain all the information which a prospective investor may require in evaluating a
possible investment in Critical Resources or that would be required in a prospectus or a product disclosure statement prepared in
accordance with the Corporations Act 2001 or the securities laws of any other jurisdiction. The information in this document should
be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX.
No Liability The information contained in this document has been prepared in good faith by the Company however no guarantee,
representation or warranty expressed or implied is or will be made by any person (including the Company and its affiliates and their
directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness, completeness or
adequacy of any statements, estimates, options, conclusions or other information contained in this document. No person other than
the Company is responsible for the preparation of this document. To the maximum extent permitted by law, the Company and its
affiliates and their directors, officers, employees, associates, advisers and agents each expressly disclaims any and all liability,
including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of or reliance on
information contained in this document including representations or warranties or in relation to the accuracy or completeness of the
information, statements, opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or derived from,
or for omissions from, this document including, without limitation, any financial information, any estimates, forecasts, or projections
and any other financial information derived therefrom. Statements in this document are made only as of the date of this document
unless otherwise stated and the information in this document remains subject to change without notice. No responsibility or liability is
assumed by the Company or any of its affiliates (or their directors, officers, employees, associates, advisers and agents) for updating
any information in this document or to inform any recipient of any new or more accurate information or any errors or mis
descriptions of which the Company and any of its affiliates or advisers may become aware.
Forward Looking Statements Statements contained in this document, including but not limited to those regarding the possible or
assumed future costs, projected timeframes, performance, dividends, returns, revenue, exchange rates, potential growth of Critical
Resources, industry growth, commodity or price forecasts, or other projections and any estimated company earnings are or may be
forward looking statements. Forward looking statements can generally be identified by the use of words such as ‘project’, ‘foresee’,
‘plan’, ‘expect’, ‘aim’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, or similar expressions. Forward looking statements
including all statements in this presentation regarding the outcomes of preliminary and definitive feasibility studies, projections,
guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication or
guarantee of future performance. These statements relate to future events and expectations and as such involve known and
unknown risks and significant uncertainties, many of which are outside the control of the Company. Actual results, performance,
actions and developments of the Company may differ materially from those expressed or implied by the forward looking
statements in this document. Such forward looking statements speak only as of the date of this document There can be no
assurance that actual outcomes will not differ materially from these statements. To the maximum extent permitted by law, the
Company and any of its affiliates and their directors, officers, employees, agents, associates and advisers disclaim any obligations or
undertaking to release any updates or revisions to the information in this document to reflect any change in expectations or
assumptions do not make any representation or warranty, express or implied, as to the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward looking statement or any event or results expressed or implied
in any forward looking statement and disclaim all responsibility and liability for these forward looking statements (without limitation,
liability for negligence). Nothing in this document will under any circumstances create an implication that there has been no
change in the affairs of the Company since the date of this document.
Financial data All amounts are in Australian Dollars (AUD) unless otherwise indicated. A number of figures, amounts, percentages,
estimates, calculations of values and fractions in this presentation are subject to the effect of rounding. Accordingly, the actual
calculation of these figures may differ from the figures set out in this presentation. Readers should note that this presentation
includes unaudited financial information in relation to dollar spent in exploration per tonne of Mineral Resources. Readers should
note that this information has not been audited and is based on management estimates and not on financial statements prepared
in accordance with applicable statutory requirements. Accordingly, readers should treat this information with appropriate caution.
This information is for illustrative purposes only. Readers should also be aware that spend per mineral resources financial data
included in this presentation are “non-IFRS financial information” under ASX Regulatory Guide 230 (Disclosing non-IFRS financial
information), nor does it purport to be. This non-IFRS financial information financial measures do not have a standardised meaning
prescribed by Australian International Financial Reporting Standards (AIFRS) or the Australian Accounting Standards (AAS) and,
therefore, may not be comparable to similarly titled measures presented by other companies, nor should they be construed as an
alternative to other financial measures determined in accordance with AIFRS. Moreover, the disclosure of such non-IFRS financial
measures in the manner included in this Presentation and the announcement to which it is attached may not be permissible in a
registration statement under other securities acts. Although the Company believes that these non-IFRS / non-GAAP financial
measures assist in providing additional meaningful information to readers in measuring the financial performance and condition of
the Company’s business and underlying drivers, readers are cautioned not to place undue reliance on any non-IFRS / non-GAAP
financial measures included in this Presentation and the announcement to which it is attached.
Cautionary Note – VISUAL ESTIMATES The Company stresses that the reported visual estimated percentages in Table 1 relate
specifically to the abundance of spodumene logged in the drill core and is not estimated lithium grade for the interval. In relation to
the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analysis where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations. Laboratory assay results are required to determine the widths and grade of the visible mineralisation reported in
preliminary geological logging. The Company will update the market when laboratory analytical results become available. The
reported intersections are down hole measurements and are not necessarily true width. Descriptions of the mineral amounts seen
and logged in the core are qualitative, visual estimates (they are listed in order of abundance of estimated combined
percentages). Quantitative assays will be completed by Activation Lab.
JORC Code It is a requirement of the ASX Listing Rules that the reporting of exploration results, ore reserves and mineral resources in
Australia comply with the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves
("JORC Code"). Investors outside Australia should note that while reporting in this document complies with the JORC Code, they
may not comply with the relevant guidelines in other countries. Information contained in this document describing mineral deposits
may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of
Canadian or US securities laws.
Acceptance By attending a presentation or briefing, or accepting, accessing or reviewing this document you acknowledge,
accept and agree to the matters set out above.
Authorisation this document has been authorised for release by the Company’s Board of Directors.
Not Financial Product Advice This document does not constitute financial product advice or take into account your investment
objectives, taxation situation, financial situation or needs. This document consists purely of factual information and does not involve
or imply a recommendation of a statement of opinion in respect of whether to buy, sell or hold a financial product. An investment in
the Company is considered to be speculative in nature and is subject to known and unknown risks, some of which are beyond the
control of the Company. Before making any investment decision in connection with any acquisition of securities, investors should
consult their own legal, tax and/or financial advisers in relation to the information in, and action taken on the basis of this document.
Corporate Presentation 2023 |
Exploration Disclosure
COMPLIANCE STATEMENT
This document contains information relating to Exploration Results in respect of the Mavis Lake project extracted from ASX market announcements reported previously and
published on the ASX platform on those dates noted below.
The Company confirms that it is not aware of any new information or data
Share your feedback
Discover