Exceptional Results up to 3.79% Li2O at Tot Channel Program
Released
Released
Announcement PDF
ASX Announcement
22 August 2024
Exceptional Lithium Results up to 3.79% Li2O from
Channel Program at Tot Pegmatite
Highlights
•
High Grade Li2O Results: Northern Prospects mechanical stripping program returns
exceptional channel assay results, including:
-
CH002: 7m at 1.21% Li2O
-
CH003: 6m at 1.57% Li2O with the highest grading sample yielding an impressive
3.79% Li2O over 1m (Sample ID: 341781).
•
CH006: 6m at 1.33% Li2O
Continuous High-Grade Mineralisation: The Tot pegmatite is now exposed along a
continuous 50-meter strike length with an estimated true width of 8m, demonstrating
substantial high-grade spodumene mineralisation throughout
•
Summer field program results at Mavis Lake reinforcing the Company’s announced
Exploration Target of 18 – 29Mt at 0.8 – 1.2% Li2O* (excludes current Mineral Resource
Estimate of 8Mt@1.07% Li2O)
•
Targeted drill program planning progresses across the Mavis Lake Project Area
•
8km of highly prospective anomalies and follow-up targets identified at Tot and
Gullwing Prospects
•
The Company is well placed to benefit from the increased M&A and partnerships
activity happening throughout the lithium sector
Lithium exploration and project development company Critical Resources Limited ASX:CRR
(“Critical Resources” or “the Company”) is pleased to announce outstanding assay results from its
recently completed mechanical stripping program at the Company's 100%-owned Northern
Prospects Tot pegmatite occurrence within the Mavis Lake Lithium Project in Ontario, Canada.
The mechanical stripping program focused on exposing the Tot pegmatite to assess the continuity
of its strike length, take structural measurements, and evaluate the extent of spodumene
mineralisation. The program has successfully extended the known mineralised zone, revealing
significant high-grade lithium mineralisation that will be incorporated directly into future resource
models and exploration programs. The Tot prospect has been identified as a high priority for
immediate follow-up exploration due to its high-grade and consistent mineralisation.
Highlights of significant mineralisation are shown in Table 1 and Figure 1, with full exploration results
provided in Appendix 1.
* Refer Announcement 22 May 2024. The potential quantity and grade of the Exploration Target is conceptual
in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45, 108 St Georges Terrace, Perth WA 6000
P. +61 (8) 9465 1024 W. criticalresources.com.au E. info@criticalresources.com.au
Table 1: Highlights from Tot Channel Intercepts
Hole ID
From (m)
To (m)
Down Hole
Interval (m)
Li2O (%)
True Width (m)
CH002
3
10
7
1.21
7.0
CH003
1
7
6
1.57
6.0
including
3
6
3
2.80
3.0
CH004
2
5
3
1.16
3.0
CH006
2
8
6
1.33
6.0
Mechanical Stripping and Channel Sampling Program
In July, the Company commenced mechanical stripping around the Tot Pegmatite. During this
program, six channels were cut perpendicular to strike, for a total of 56 meters, and 56 samples
were collected, with high-grade lithium oxide assay results of up to 3.79% Li2O over 1m, as shown
in Tables 1 and 3.
The exploration efforts successfully extended known footprint of the Tot Pegmatite to a strike length
of approximately 50 meters, with an average width of 8 meters. Although the pegmatite’s strike is
anticipated to continue further, its surface expression is covered by thick glacial lacustrine clay
overburden, which has halted further exposure along strike by the excavator. The Tot Pegmatite's
strike aligns with the previously reported ~1.25 km MMI survey Lithium anomaly and will be further
investigated through drilling which is anticipated to commence imminently.
Previously, the Tot Pegmatite was believed to have a shallow dip towards the east. However, upon
further exposure, it is appearing to have a near-vertical dip at the surface. This data is crucial for
the upcoming drill planning and program, as the new structural orientations will help more
effectively guide the drilling strategy.
Figure 1: Drone image of the Tot pegmatite, with sample locations & assay results up to 3.79% Li2O
Page 2 of 13
Figure 2: Multiple photos of Tot pegmatite with locations shown in figure 1. (A) Coarse
spodumene laths intersecting in an X like pattern. (B) Sharp near vertical contact of the
pegmatite and the mafic volcanic host rock. (C) Metre-scale pink spodumene (kunzite) crystal.
(D) Quartz-core zone hosting an abundance of spodumene mineralisation.
Exploration Manager, Troy Gallik commented:
"The assay results from the Tot pegmatite mechanical stripping program are extremely
encouraging, highlighting the significant lithium potential of both the Tot Pegmatite and the
broader, underexplored Northern Prospects region of the Mavis Lake Project Area. The
confirmation of high-grade lithium mineralisation validates our exploration strategy and
underscores the prospectivity of this asset. We look forward to commencing our upcoming drilling
program, with a focus on expanding our resource base and unlocking additional value for our
shareholders."
The Northern Prospects comprises pegmatites that form an East-North-East trending cluster
spanning approximately 2km wide and extending over an 8km strike. This highly prospective area
encompasses various pegmatite dykes, including the Gullwing spodumene pegmatite swarm, Tot
spodumene pegmatite, Coates beryl-molybdenite pegmatite, and a further 15 LCT pegmatite
dykes.
Page 3 of 13
The summer field program results, including the discovery of surface extensions and new outcrops
(refer to ASX announcement 29 May 2024), together with the subsequent receipt of assay results
from these areas (refer to ASX announcement 2 July 2024), and recent mechanical stripping and
channel results from Tot pegmatite, underscores the exceptional potential of the Mavis Lake
Project for continued Resource growth and, ultimately, the ability to deliver on the Company’s
recently announced JORC compliant Exploration Target of 18 - 29Mt at 0.8- 1.2% Li2O*. This Target,
aimed at achieving a significant Resource base in North-western Ontario, excludes the current
8.0Mt @ 1.07% Li2O Inferred Mineral Resource Estimate (MRE).
Cautionary statement - The Exploration Target has been prepared and reported in accordance
with the 2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target
is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and
it is uncertain if further exploration will result in the estimation of a Mineral Resource.
Future Work
Critical Resources is poised to launch a diamond drilling program across the Mavis Lake Project
area. This initiative is expected to significantly enhance both exploration and resource expansion
efforts. The program will strategically target the Tot and Gullwing pegmatites within the Northern
Prospects, as well as extend the Main Zone to drive immediate resource growth. These efforts are
central to our 2024 drilling campaign, aimed at fully realizing the mineral potential of this highly
promising project area.
References
1.
2.
3.
4.
5.
6.
Refer to ASX announcement 18 March 2024 1.25km Li Trend at Tot Confirms District-Scale at Mavis Lake
Refer to ASX announcement 17 April 2024 8km of Highly Prospective Anomalies Identified at Gullwing Tot
Refer to ASX announcement 22 May 2024 Mavis Lake Exploration Target highlights scale potential
Refer to ASX announcement 29 May 2024 Major New LCT Pegmatite System Discovered at Mavis Lake East
Refer to ASX announcement 2 July 2024 Exceptional Assay results of up to 5.12% Li2O at Mavis Lake
Refer to ASX announcement 24 July 2024 Mechanical Stripping Program Commences at Tot Prospect
This announcement has been approved for release by the Board of Directors.
-ends-
For further information please contact
E: info@criticalresources.com.au
P: +61 (8) 9465 1024
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is focused on the exploration, development and delivery of the
critical metals required for a decarbonized future, underpinned by a portfolio of lithium projects in Ontario, Canada which
are ideally positioned to participate in the rapidly growing North American battery materials supply chain.
The Company’s principal focus is on its flagship Mavis Lake Lithium Project in Ontario, Canada, where it has completed
over 45,000m of drilling and defined a maiden Inferred Mineral Resource of 8Mt grading 1.07% Li2O. Recent exploration
success has demonstrated substantial potential to expand this resource and make new discoveries in the surrounding
area. Critical is progressing a dual-track strategy at Mavis Lake of targeting resource growth in parallel with multiple
permitting and project development workstreams.
COMPETENT PERSONS COMPLIANCE STATEMENTS The information in this ASX Announcement that relates to Exploration
Results is based on information compiled by Mr. Troy Gallik (P. Geo), a Competent Person who is a Member of the
Association of Professional Geoscientists of Ontario. Troy Gallik is a full-time employee of Critical Resources. Mr. Gallik has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Gallik consents to the inclusion in this
Announcement of the matters based on his information in the form and context in which it appears.
Page 4 of 13
This document contains information on the Mavis Lake Lithium Project, Canada extracted from ASX market
announcements dated 20 December 2022, 29 December 2022, 18 May 2023 ,17 July 2023, 2 November 2023 and 18 March
2024, 17 April 2024, 22 May 2024, 29 May 2024, 2 July 2024 and 24 July 2024 reported in accordance with the 2012 edition
of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ("2012 JORC Code")
and available for viewing at https://www.criticalresources.com.au/ or https://www.asx.com.au. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the original ASX
market announcements.
This document contains information relating to the Mineral Resource estimate for the Mavis Lake Lithium Project is
extracted from the Company’s ASX announcement dated 5 May 2023 and reported in accordance with the 2012 JORC
Code and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply and have not
materially changed.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately
achieved. Critical Resources Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Critical Resources Limited or any of its
directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the fairness,
accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Page 5 of 13
Appendix 1: Results from Tot Pegmatite Channel Sampling Program
Table 2: Channel Locations
Hole ID
Easting
Northing
Az
Dip
End
Depth
CH001
538929
5530872
58
0
12
CH002
538927
5530876
49
0
12
CH003
538919
5530885
49
0
11
CH004
538915
5530890
55
0
5
CH005
538914
5530897
49
0
7
CH006
538935
5530863
58
0
9
Table 3: Assay Table
Channel ID
Sample ID
From
To
Li2O (%)
Channel ID
Sample ID
From
To
Li2O (%)
CH001
341751
0
1
0.280
CH003
341782
4
5
3.445
CH001
341752
1
2
0.693
CH003
341783
5
6
1.167
CH001
341753
2
3
0.029
CH003
341784
6
7
0.243
CH001
341754
3
4
0.014
CH003
341785
7
8
0.015
CH001
341755
4
5
0.021
CH003
341786
8
9
0.015
CH001
341756
5
6
0.017
CH003
341787
9
10
0.021
CH001
341757
6
7
0.019
CH003
341788
10
11
0.523
CH001
341758
7
8
0.784
CH004
341789
0
1
0.334
CH001
341759
8
9
1.038
CH004
341791
1
2
0.200
CH001
341761
9
10
0.019
CH004
341792
2
3
1.548
CH001
341762
10
11
0.024
CH004
341793
3
4
1.135
CH001
341763
11
12
0.579
CH004
341794
4
5
0.797
CH002
341764
0
1
0.413
CH005
341795
0
1
0.301
CH002
341765
1
2
0.693
CH005
341796
1
2
0.020
CH002
341766
2
3
0.023
CH005
341797
2
3
0.005
CH002
341767
3
4
1.068
CH005
341798
3
4
0.005
CH002
341768
4
5
0.810
CH005
341799
4
5
0.004
CH002
341769
5
6
1.744
CH005
341801
5
6
0.010
CH002
341771
6
7
0.967
CH005
341802
6
7
0.252
CH002
341772
7
8
2.067
CH006
341803
0
1
0.441
CH002
341773
8
9
1.064
CH006
341804
1
2
0.239
CH002
341774
9
10
0.807
CH006
341805
2
3
1.427
CH002
341775
10
11
0.023
CH006
341806
3
4
1.264
CH002
341776
11
12
0.273
CH006
341808
5
6
2.054
CH003
341777
0
1
0.407
CH006
341809
6
7
0.842
CH003
341778
1
2
0.754
CH006
341811
7
8
1.759
CH003
341779
2
3
0.019
CH006
341812
8
9
0.822
CH003
341781
3
4
3.789
Page 6 of 13
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Sampling
Nature and quality of sampling
•
or specific specialised industry
•
appropriate to the minerals under
•
gamma sondes, or handheld XRF
•
techniques
(e.g., cut channels, random chips,
standard measurement tools
investigation, such as down hole
Commentary
56 samples were collected from 2 channels were cut
using a diamond saw.
•
The total length of channel samples was 56m.
Samples varied in length 1m.
The channel samples were approximately 4 cm wide
and up to 10cm deep.
Samples varied in weight from 1.45kg up to 7.4kg.
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Assay samples are selected based on geological
logging boundaries or on the nominal metre marks.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
• Samples were dispatched to an accredited laboratory
(ActLabs) in Dryden, Ontario, Canada for sample preparation and
shipment to analysis.
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report. In cases where
‘industry standard’ work has been
done this would be relatively
simple (e.g., ‘reverse circulation
drilling was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation
types (e.g., submarine nodules)
may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g., core, reverse
• No drilling was undertaken.
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core
diameter, triple or standard tube,
depth of diamond tails, face-
sampling bit or other type, whether
Page 7 of 13
Criteria
JORC-Code Explanation
Commentary
Drill sample
Method of recording and
• No drilling was undertaken.
recovery
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
• Channel samples were not geotechnically logged.
• Channel samples have been geologically logged to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• The sample descriptions was qualitative in nature.
• All channel was photographed
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc)
photography.
The total length and percentage
of the relevant intersections
logged.
Sub-sampling
If core, whether cut or sawn and
sample
taken.
techniques and
preparation
whether quarter, half or all core
If non-core, whether riffled, tube
sampled, rotary split, etc and
• The channel samples were collected from outcropping
pegmatite. The samples were prepared (crushed and
pulverised) in the ActLabs in Dryden, Ontario and analysis was
conduct by ActLabs in Ancaster, Ontario
whether sampled wet or dry.
Page 8 of 13
Criteria
JORC-Code Explanation
Commentary
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise representivity
of samples.
Measures taken to ensure that the
sampling is representative of the
in situ material collected, including
for instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of assay The nature, quality and
• Assays methods appropriate for style of mineralisation will be
laboratory tests
and laboratory procedures used
UT-7 (Li up to 5%) QOP Sodium Peroxide (Sodium Peroxide Fusion
considered partial or total.
• Either standards or blanks are inserted every 10th sample interval
data and
appropriateness of the assaying
used:
and whether the technique is
ICPOES + ICPMS.
as a part of a QAQC process. Standard and blank results from
For geophysical tools,
spectrometers, handheld XRF
recent drilling are within acceptable margins of error.
instruments, etc, the parameters
• Activation Laboratory performs internal QA/QC measures.
including instrument make and
confirmed to be acceptable.
used in determining the analysis
Results are released once all internal QA/QC is verified and
model, reading times, calibrations
factors applied and their
derivation, etc.
Nature of quality control
procedures adopted (e.g.,
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e., lack of bias) and
precision have been established.
Verification of
The verification of significant
assaying
independent or alternative
sampling and
intersections by either
company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
Page 9 of 13
Criteria
JORC-Code Explanation
Commentary
verification, data storage (physical • No independent verification completed at this stage.
and electronic) protocols.
Discuss any adjustment to assay
data.
• The data regarding sampling location and sample
information is stored in tabular format and is appended
to this report.
• Assays results have been reported as %Li2O, and
there was no adjustment to assay data..
• Samples were measured, photographed and logged by
geologists. Digitally recorded plus back-up records.
• All assay results are provided.
• No adjustments to the assay data.
• No assay cut off grades are applied.
Location of data Accuracy and quality of surveys
points
used to locate drill holes (collar
• Samples recorded with Garmin GPS that has an accuracy in the
order of ±3 metres for location. A registered surveyor will be
and down-hole surveys), trenches, contracted to accurately survey all drill collars at completed of
mine workings and other locations drill program.
used in Mineral Resource
estimation.
Specification of the grid system
used.
Quality and adequacy of
topographic control.
Data spacing
and distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and
grade continuity appropriate for
• WGS 1984 UTM Zone 15N.
• No specific topography survey has been completed over the
project area.
• Channels were taken appropriately to be utilized for future
resource models as its shows representation of a continuous
sample along the start and end of mineralisation.
• Channels were taken ~10m from another to avoid biases from
sample collectors
the Mineral Resource and Ore
•Core sample intervals were based in logged mineralisation and
and classifications applied.
many weighted average- composting of assay data.
Reserve estimation procedure(s)
no sample composting applied. Reporting of final results includes
Whether sample compositing has
been applied.
Orientation of
Whether the orientation of
to geological
sampling of possible structures
data in relation
structure
sampling achieves unbiased
and the extent to which this is
• Orientation of mineralisation is known or thought to be known,
channels are planned to intersect at an appropriate angle
relative to true width of the mineralisation. Intercepts with
known, considering the deposit
type.
Page 10 of 13
Criteria
JORC-Code Explanation
Commentary
If the relationship between the
mineralisation released are given as apparent widths, not true
orientation of key mineralised
• It is uncertain whether sampling bias has been introduced, or
drilling orientation and the
structures is considered to have
introduced a sampling bias, this
widths unless true widths are stated
whether the thickness drilled is a true thickness.
should be assessed and reported
if material.
Sample security The measures taken to ensure
sample security.
• Channel samples were stored at the Dryden core yard and core
shack under lock and key before delivery to ActLabsGroups in
Dryden, Ontario for analysis.
Audits or reviews The results of any audits or reviews • Not undertaken at this stage.
of sampling techniques and data.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC-Code Explanation
Commentary
Mineral
Type, reference name/number,
The Mavis Lake Lithium Project consists of 1097 unpatented
land tenure
Single Cell Mining Claims and six separate surface leases which
agreements or material issues with secure the surface rights of the land required for the Project
third parties such as joint ventures, footprint.
tenement and
status
location and ownership including
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at
All claims and leases are active and in good standing. The
leases have a term of 21 years and are not set to expire until
2032, at which time they can be renewed for an additional 21
years if required.
the time of reporting along with
any known impediments to
obtaining a licence to operate in
the area.
Exploration done Acknowledgment and appraisal of • Previous exploration has been conducted by a number of
parties including Lun-Echo Gold Mines Limited (1956), Selco
by other parties exploration by other parties.
Mining Corporation (1979-1980), Tantalum Mining Corporation of
Canada Limited (1981-1982), Emerald Field Resources (2002),
International Lithium Corp (2006-2021) and Pioneer Resources
Limited/Essential Metals Limited (2018-2021).
Geology
Deposit type, geological setting
• The Fairservice and Mavis Lake Prospects host zoned pegmatites
and style of mineralisation.
that are prospective for lithium and tantalum
Drill hole
A summary of all information
• No drilling was undertaken.
Information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
Easting and northing of the drill
hole collar
Page 11 of 13
Criteria
JORC-Code Explanation
Commentary
Elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
Dip and azimuth of the hole
down hole length and interception
depth
hole length.
If the exclusion of this information
is justified on the basis that the
information is not Material and this
exclusion does not detract from
the understanding of the report,
the Competent Person should
clearly explain why this is the case.
Data
In reporting Exploration Results,
methods
maximum and/or minimum grade
aggregation
weighting averaging techniques,
• Uncut.
truncations (e.g., cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
• All aggregate intercepts detailed on tables are weighted
averages.
Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of • None used.
low grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
These relationships are particularly • True width is calculated from logging geologists structural
mineralisation
Exploration Results.
between
widths and
intercept lengths
important in the reporting of
If the geometry of the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
measurements from upper and lower contacts of pegmatite
dyke and the host rock. Resource shapes and geometries may
aid in determine true widths as the pegmatites chaotic contacts
can be miss leading. True widths are provided unless otherwise
stated.
• The precise geometry is not currently known but is being tested
by the planned drilling, with diamond drill hole azimuths designed
If it is not known and only the down to drill normal to the interpreted mineralised structure.
hole lengths are reported, there
should be a clear statement to this
effect (e.g., ‘down hole length, true
• Apparent length reported, true width has not yet been
interpreted.
width not known’).
Page 12 of 13
Criteria
JORC-Code Explanation
Commentary
Diagrams
Appropriate maps and sections
• Refer to images in the main document.
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of drill
hole collar locations and
appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of • Representative reporting of all relevant grades is provided in
all Exploration Results is not
practicable, representative
tables to avoid misleading reporting of Exploration Results.
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Other
substantive
Other exploration data, if
meaningful and material, should
exploration data be reported including (but not
• Overview of exploration data leading to selection of drill targets
provided.
limited to): geological
observations; geophysical survey
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
Further work
The nature and scale of planned
• Further work planned at Mavis Lake Lithium Project includes
extensions or depth extensions or
known and unknown mineralisation, field mapping, geochemistry,
further work (e.g., tests for lateral
exploration and resource growth drilling to confirm, and extend
large-scale step-out drilling).
geophysics and prospecting works.
Page 13 of 13