Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
24 JULY 2026
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Quarterly Activities Report – June 2026
June 2026 Quarter Highlights
MAVIS LAKE LITHIUM PROJECT – ONTARIO, CANADA
- Corona Field Program Completed: a first-pass field mapping program at the Corona Pegmatite target (~4
km north of the Main Zone) mapped 14 pegmatite bodies, including six newly mapped occurrences,
across a ~5 km trend. Permitting and government engagement continued with SLR Consulting and
Pathway Group.
NEW ZEALAND – GOLD & CRITICAL MINERALS
- Granite Creek Tungsten Confirmed: first-pass field programs at Croesus and Lammerlaw were
completed; channel sampling at the Granite Creek target returned up to 16.63% WO₃ (0.41 m, sample
A1419), with 9 of 25 samples returning between 0.67% and 16.63% WO₃, elevating Granite Creek as a
priority tungsten target.
- Croesus Gold-Antimony System Confirmed: first-pass sampling returned up to 13.3 g/t Au and 0.7% Sb,
confirming a structurally controlled gold-antimony system. An Extension of Land application was lodged
over the full mapped extent of the Granite Creek pluton, to secure future optionality. The Company is
targeting an exploration permit application over Granite Creek in the second half of 2026.
- Lammerlaw Gold Confirmed at Surface: first-pass rock-chip sampling at Devils Creek returned 5.42 g/t Au
(sample A0911), with float samples returning 1.63 g/t Au and 1.45 g/t Au along the interpreted strike of
veining.
- Cap Burn & Permitting: a follow-up program of down-plunge drilling and along-strike soil geochemistry
across the ~10 km Cap Burn Fault corridor is being finalised.
HALLS PEAK BASE METALS PROJECT
- Mayview – Land Access Progressing: engagement ongoing with landowners adjacent to Larvotto
Resources’ Hillgrove Antimony-Gold Project, targeting a low-impact soil geochemistry survey.
SOLID-STATE LITHIUM-ION BATTERY TECHNOLOGY
- Full-format Pouch-Cell Milestone: a DSD-built cathode composite was assembled into full-format pouch
cells for the first time on a liquid-electrolyte baseline, with initial electrochemical testing underway.
- Single-Step Composite Layer: a complete composite layer combining cathode, solid electrolyte and
conductive carbon nanotube network was deposited in a single, dry, room-temperature step at the
South Dakota School of Mines within the NSF-supported CEPS.
- ASE Benchmarking: the Amorphous Solid-State Electrolyte was benchmarked at 3.2 mS cm⁻¹ ionic
conductivity (superionic-class, sulphur-free), confirming lithium-metal interface stability over 1,200 hours.
- Thermal Licence Secured: exclusive worldwide licence over a two-phase spray-cooling portfolio for
batteries and high-density data-centre electronics — chiller-free operation at near-ambient (~30°C)
coolant temperatures, extending the Company’s technology portfolio into thermal management.
CORPORATE
Cash and cash equivalents of A$1.2 million at 30 June 2026.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Critical Resources Limited (‘Critical Resources’ or the ‘Company’, ASX:CRR) is pleased to report on its
activities for the quarter ending 30 June 2026 (‘the Quarter’). During the period, the Company advanced its
exploration programs across the Mavis Lake Lithium Project in Ontario, Canada, and its gold and critical
minerals portfolio in New Zealand and New South Wales, and progressed its solid-state lithium-ion battery
evaluation program from component-level validation into full-format pouch-cell testing.
MAVIS LAKE – LITHIUM – ONTARIO, CANADA
2026 EXPLORATION PROGRAM – NORTHERN PROSPECTS
Mavis Lake Lithium Project covers approximately 400 km² of highly prospective geology in northwestern
Ontario. Significant areas of the Project remain unexplored, with multiple structural corridors of mapped
pegmatite trends yet to be systematically drill tested. The Northern Prospects, centred on the Gullwing–Tot
corridor, offer immediate opportunities to add scale and support future Resource growth.
During the Quarter, Critical Resources advanced its 2026 Mavis Lake Exploration Program, mobilising an
experienced field crew to the Corona Pegmatite Field within the Northern Prospects (refer to ASX:CRR
announcements 12 May 2026 and 10 June 2026). The first-pass program comprised systematic prospecting,
geological mapping and structural data collection, and successfully identified 14 pegmatite bodies —
including six not previously mapped — across the underexplored ~5 km Corona trend located approximately
4 km north of the Main Zone. A total of 106 rock samples were collected, 161 outcrop maps created and 74
structural measurements recorded; assay results were received post-quarter (refer to ASX:CRR
announcement 17 July 2026).
Whole-rock lithogeochemical analyses have differentiated highly evolved LCT pegmatites from less
fractionated pegmatites across the study area, clearly identifying the highest-priority targets for follow-up
exploration. The most highly fractionated pegmatites occur within the Northern Prospects Area, where
granitic-hosted pegmatites returned K/Rb ratios as low as 17.4, together with enrichment in key lithium
pathfinder elements including rubidium (up to 5,510 ppm), caesium (up to 221 ppm), tantalum (up to 53
ppm) and beryllium. These geochemical characteristics are consistent with highly evolved lithium-caesium
tantalum (LCT) pegmatite systems and identify the Northern Prospects as the highest-priority exploration area
generated from the program.
In contrast, pegmatites sampled within the Corona Pegmatite Field exhibit only slight to moderate degrees
of magmatic fractionation. While Corona remains prospective, the results demonstrate that the most fertile
pegmatites identified during the program are concentrated within the northern claim package acquired in
August 2025, establishing a clear focus for follow-up exploration.
The geochemical results will be integrated into the Company's geological, structural, geophysical and
historical exploration datasets to prioritise follow-up prospecting, refine high-confidence drill targets and
advance the next phase of exploration across the Northern Prospects. Collectively, these results further
support Critical Resources' strategy of systematically advancing regional pegmatite targets beyond the
current Mineral Resource and progressing Mavis Lake toward a multi-deposit lithium district.
Since acquiring the Mavis Lake Lithium Project in 2022, the Company has completed more than 58,000
metres of drilling across the Project, delivering a maiden 8 Mt @ 1.07% Li₂O JORC Inferred Mineral Resource
(May 2023) and an 18–29 Mt @ 0.8–1.2% Li₂O JORC Exploration Target (May 2024). The 2026 program is
designed to progress beyond the existing resource and systematically test the broader project footprint.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
Cautionary statement – The potential quantity and grade of the Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. Please refer to Exploration Target Cautionary
Statement (Appendix A) for further information, refer to ASX:CRR announcement dated 22 May 2024.
The Gullwing–Tot corridor is a priority district-scale growth zone within the Northern Prospects, spanning
approximately 10 km in length. Both prospects host spodumene mineralisation at surface and demonstrate
strong structural and lithological continuity, providing immediate drill-ready targets. The Gullwing and Tot
pegmatites are fully permitted and drill-ready and are ideally located near all-weather access routes. These
targets collectively reinforce the multi-deposit development potential across the Project and support the
potential for multiple future operating centres. Key targets include:
- Gullwing: An advanced target characterised by widths of up to ~80 m, ~500 m of exposed strike, and
strong spodumene mineralisation at surface. Carries an Exploration Target of 7–10 Mt @ 0.3–1.2% Li₂O,
positioning it as a potential satellite development hub or standalone lithium operation.
- Tot: A priority target carrying an Exploration Target of 3–5 Mt @ 0.8–1.2% Li₂O, with spodumene
mineralisation and structural continuity consistent with the Gullwing-style pegmatite system.
- Littlewing: A complementary prospect within the Gullwing–Tot structural corridor providing additional
exploration optionality.
- Mavis Lake South Zone: Remains open along strike and at depth, with contrasting structural environments
supporting a distinct exploration approach.
- Coates & Drope: LIBS fractionation data upgrades prospectivity, adding further district-scale exploration
targets within the broader Mavis Lake Project area.
- Corona Field: an underexplored ~5 km-scale pegmatite trend approximately 4 km north of the Main
Zone. A 10-day first-pass field program was completed during the Quarter, mapping 14 pegmatite
bodies (six newly mapped), with 106 rock samples collected; assay results were received post-quarter
(refer to ASX:CRR announcement 17 July 2026).
PERMITTING, ADVISORY AND GOVERNMENT ENGAGEMENT
The Company's integrated permitting and government advocacy framework — established through the
appointments of SLR Consulting and Pathway Group — remained active during the Quarter. These two
advisors work in concert to de-risk the regulatory pathway and accelerate the Company's strategic
positioning within Canada's critical minerals sector (refer to ASX:CRR announcements 8 January 2026 and 8
December 2025).
- SLR Consulting is advancing the environmental assessment, approvals sequencing, baseline study design
and regulatory risk management for Mavis Lake, with a project-wide permitting roadmap aligning
federal and provincial requirements with the Project's development milestones.
- Pathway Group is strengthening relationships with government and policymakers, supporting access to
potential non-dilutive provincial and federal funding, and elevating CRR's profile across Canada's critical
minerals and energy transition platforms.
Together, SLR Consulting and Pathway Group form a unified advisory framework designed to ensure
regulatory planning, community engagement and government advocacy progress in alignment — providing
CRR with a streamlined pathway from exploration through to development.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
NEW ZEALAND – GOLD & CRITICAL MINERALS
Critical Resources has established a 1,694 km² strategic exploration portfolio across the Otago and Reefton
regions of New Zealand’s South Island, covering six permits in highly prospective orogenic gold, antimony
and tungsten belts. During the Quarter, the Company completed first-pass field programs at Lammerlaw
and Croesus, confirmed a greisen-hosted tungsten system at Granite Creek and a gold-antimony system at
Croesus, confirmed gold mineralisation at the Lammerlaw Project, lodged an Extension of Land (EOL)
application over the Granite Creek Tungsten target, and progressed planning of a follow-up drilling program
at Cap Burn.
CAP BURN GOLD PROJECT
During the Quarter, the Company progressed planning for a follow-up program at the Cap Burn Gold Project
(EP60300, 100%), building on its inaugural Reverse Circulation (RC) drilling program reported on 25 March
2026, which confirmed a broad, structurally controlled orogenic gold system associated with the Cap Burn
Fault.
The prior twelve RC holes were completed across the Cap Burn mineralised corridor, testing shallow positions
within the Textural Zone 4 (TZ4) schist unit — the same lithological package that hosts gold at Santana
Minerals’ (ASX:SMI) Rise and Shine discovery. Key intersections include:
- 7 m @ 0.37 g/t Au from 65 m (CBRC017), including 1 m @ 1.29 g/t Au (coincident with >1,600 ppm As
anomaly)
- 16 m @ 0.22 g/t Au from 46 m (CBRC021)
- Multiple holes terminated in mineralisation due to rig capacity and groundwater inflow — confirming
mineralisation remains open at depth
Gold mineralisation is consistently associated with elevated arsenic across the drilled area, defining a
coherent mineralised footprint exceeding 1 km². The gold-arsenic relationship is spatially coherent and
consistent with an orogenic hydrothermal system, analogous to structurally controlled shear zone deposits
across the Otago Schist Belt, including Macraes and Rise and Shine.
The first-pass drilling tested only a small portion of the ~10 km Cap Burn structural corridor, with the system
remaining open along strike and at depth. Groundwater inflow constrained drilling to a maximum of ~60 m
depth, with mineralisation intersected at the base of several holes. The down-plunge extension beneath the
Cap Burn Fault remains entirely untested and represents the primary target for the next phase of drilling.
The results are consistent with the early-stage pattern observed at Rise and Shine prior to discovery. The
Company is finalising a follow-up program targeting:
- Down-plunge drilling along the Cap Burn Fault below the defined mineralised zones
- Expanded soil geochemistry survey along the full ~10 km Cap Burn Fault corridor
- Detailed geological and structural mapping to refine the drill targeting model
LAMMERLAW GOLD PROJECT
Following a detailed desktop study, a first-pass field program was completed at the Lammerlaw Gold Project
during the Quarter (refer to ASX:CRR announcements 23 February 2026 and 1 May 2026). Lammerlaw is
located approximately 50 km south-southwest of Cap Burn in the Central Otago Goldfield, covering
approximately 410 km².
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
The desktop study identified three priority targets for systematic field evaluation:
- Devils Creek (OPQ Trend): Historic hard rock gold workings confirmed via aerial imagery and LiDAR.
Historical alluvial gold grades up to 2.72 g/t Au. First-pass target for geological mapping and rock and
stream sampling.
- Stony Creek: Geophysics-supported gold-tungsten-antimony system with stream sediment anomalies up
to 340 ppm W, supporting interpretation of a structurally controlled orogenic system.
- TZ3–TZ4 Structural Boundary: Regional structural target with potential for gold mineralisation analogous
to Cap Burn-style TZ4 schist-hosted systems.
First-pass geological mapping and rock and stream sampling were completed across the priority target
areas during the Quarter (refer to ASX:CRR announcement 26 May 2026).
The sampling program was undertaken as part of initial ground-based evaluation of priority targets defined
through the Company’s earlier desktop review. That review identified three priority target areas at
Lammerlaw: Devils Creek, Stony Creek and the TZ3–TZ4 Structural Boundary. Devils Creek was highlighted as
the most historically developed hard-rock gold prospect within the permit area, with historical records and
LiDAR interpretation indicating two small adits, pits and trenches associated with lode-style mineralisation.
The sampling program targeted outcrop and float material at Devils Creek and nearby structural targets.
Sampling confirmed gold mineralisation associated with the Devils Creek workings and along the interpreted
strike of veining. This interpretation is based on regional structural orientation, lithological contrasts within the
Otago Schist Belt, and the spatial association of historical gold occurrences with mapped structural trends
— and is the primary focus of the current field program.
Rock-chip sampling from the Devils Creek target returned new results of 5.42 g/t Au from sample A0911,
confirming gold mineralisation at surface within the Devils Creek workings area. Associated float samples
returned 1.63 g/t Au and 1.45 g/t Au along strike of veining, and support follow-up work to test continuity of
the interpreted mineralised structure. These results are significant because the highest-grade assays are
clustered around the Devils Creek interpreted mineralised trend. The results confirm the presence of gold
mineralisation in outcrop and float material and provide direct field support for the Company’s exploration
model at Devils Creek.
First-pass soil geochemistry was also completed over Devils Creek and Stony Creek, comprising 107 field soil
samples collected by 100–150 mm hand auger.
At Devils Creek, soil sampling defined coherent arsenic anomalism spatially associated with historic workings,
mapped drainage and anomalous rock-chip gold results, peaking at 757 ppm As from sample A1019. The
results support the interpretation that the Devils Creek lode/shear system remains open along strike.
At the Stony Creek target, soil sampling defined a separate arsenic anomaly extending approximately 600
m over an interpreted structural/geophysical target. The anomaly is a priority follow-up target, but remains
reconnaissance in nature and does not demonstrate economic mineralisation, mineralised widths or grade
continuity. Further work remains to extend the soil sampling program.
Cautionary statement – Portable XRF (pXRF) readings cited in this report are qualitative spot measurements
and should not be considered equivalent to laboratory assay results. pXRF values are subject to variability
due to sample heterogeneity, surface effects and instrument limitations. They are intended only as an
indication of elemental presence and relative abundance and are not representative of bulk grade or
mineralisation. As gold is not analysed by pXRF, no grades have been calculated.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
CROESUS GOLD-TUNGSTEN PROJECT
First-pass field work was completed at the Croesus Project during the Quarter (refer to ASX:CRR
announcements 1 May 2026, 11 June 2026 and 23 June 2026). Croesus is located on the southwestern flank
of the Reefton Goldfield — a Tier-1 orogenic gold province on the West Coast of New Zealand’s South Island.
Field verification confirmed greisen alteration and outcropping quartz-vein structures at the Granite Creek
tungsten target, with channel sampling returning up to 16.63% WO₃ (0.41 m, sample A1419) and 9 of 25
samples between 0.67% and 16.63% WO₃ (Figure 1).
Figure 1 – Granite Creek tungsten sample results showing selected in-situ channel and rock samples, together
with float samples, across the mapped Barrytown Granite and adjacent Greenland Group metasedimentary
rocks. The reported location of the 1988 historical sample returning 42.6% WO₃ is also shown.
The Company confirmed a structurally controlled gold-antimony system, with first-pass sampling returning up
to 13.3 g/t Au and 0.7% Sb. An Extension of Land application was lodged to capture the full mapped extent
of the Granite Creek–Barrytown Granite Pluton, and the Company is targeting lodgement of an exploration
permit application over the Granite Creek target area in the second half of 2026, with maiden drill testing to
follow subject to permit grant and the required access and environmental approvals.
Historical data at Croesus defines two compelling targets:
- Gold-Antimony Trend (~5 km): Historical hard-rock workings reporting over 4,500 oz Au at grades up to
17 g/t Au, with legacy rock-chip samples returning up to 28.9 g/t Au and 7.4% Sb at Garden Gully and
Croesus Reef.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
- Greisen-Hosted Tungsten Mineralisation: Selective sampling by Mineral Resources NZ Ltd (1988) returned
grades up to 42.6% WO₃ (337,642 ppm W) from scheelite-rich greisen-hosted quartz rubble at Little
Granite Creek. Tungsten prices have risen from ~A$335/MTU (January 2025) to ~A$2,100–2,400/MTU
(March 2026), materially increasing the strategic relevance of this target.
Cautionary statement – The above results are historical exploration results prepared by Mineral Resources NZ Ltd (1988;
MR1530) and by AMOCO Minerals NZ Ltd (1981–82, MR1367), CanAlaska Ventures Ltd (2006, MR4367), Lime and Marble
Ltd (1971, MR1282). The reports document available information and have been assessed by the Competent Person;
nothing has come to his attention that causes the Company to question the accuracy or reliability of the exploration
results. It is uncertain whether further evaluation and exploration work will support the definition of an Exploration Target.
Rock grab samples are selective and may not be representative of average or continuous mineralisation. Channel
samples represent continuous sampling over the length of the channel but are limited to the specific exposure sampled.
Refer to ASX:CRR announcement 8 April 2026.
REGIONAL PORTFOLIO – OTHER NEW ZEALAND PERMITS
Work programs across Rock & Pillar, Silver Peaks and Tokomairiro will prioritise low-cost, high-value activities
including structural mapping, soil geochemistry grids and reconnaissance rock sampling, to build a ranked
pipeline of drill-ready targets. These activities will allow the Company to advance multiple prospects in
parallel while retaining operational flexibility.
SOLID-STATE LITHIUM-ION BATTERY EVALUATION PROGRAM
During the Quarter, the Company advanced its solid-state lithium-ion battery evaluation program at the
South Dakota School of Mines & Technology (SDM) under the United States National Science Foundation
(NSF) supported Centre for Solid-State Electric Power Storage (CEPS) framework, progressing from
component-level validation into full-format pouch-cell testing.
The program comprises two complementary evaluation workstreams — the Amorphous Solid-State
Electrolyte (ASE) program and the Dry Solvent-free Deposition (DSD) cathode program — each designed to
generate independent, application-relevant technical data to guide prototype cell development.
DRY SOLVENT-FREE DEPOSITION (DSD) – CATHODE PROGRAM PROGRESS
During the Quarter, the DSD cathode program advanced from coin-cell testing into full-format pouch cells,
building on the solvent-free LFP cathode validation reported on 5 March 2026 (refer to ASX:CRR
announcements 16 June 2026 and 18 June 2026).
On 16 June 2026, a complete composite layer combining cathode (Lithium Iron Phosphate, LFP), solid-state
electrolyte (lithium lanthanum zirconium oxide, LLZO) and a carbon-nanotube (CNT) conductive network
was deposited in a single, dry, room-temperature step. The DSD-deposited cathode composite was
approximately 15 µm thick (Figure 2) and was assembled into full-format pouch cells, with initial
electrochemical conditioning (formation cycling at 0.05C) ongoing. The pouch cells use a liquid electrolyte
as a reference baseline, allowing the DSD-deposited cathode to be validated before integration of the
Company’s proprietary solid-state electrolyte. For clarity, the Company’s proprietary ASE has not yet been
integrated into the pouch-cell architecture.
- Solvent-free cathode fabrication validated: LFP cathodes successfully produced via dry solvent-free
deposition onto aluminium current collectors, without solvents, slurry chemistries, or associated drying
and ventilation infrastructure.
- Controllable electrochemical performance demonstrated: Both as-deposited and annealed cathode
samples were evaluated. Annealing reduces impact-induced structural disorder and improves
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
crystallinity, enabling predictable and adjustable performance across different charge-discharge
conditions.
- High-rate performance: Under high C-rate conditions, as-deposited electrodes demonstrated
comparatively stronger capacity retention, with deposition-induced structural characteristics providing
kinetic advantages at elevated charge-discharge rates.
- Mechanically interlocked cathode–collector interface: SEM analysis confirmed a robust, mechanically
interlocked interface between the DSD-fabricated cathode and aluminium current collector, capable
of supporting reliable electrochemical operation.
- Scalable manufacturing pathway: Results establish a repeatable cathode manufacturing baseline, with
the solvent-free process offering advantages in cost, environmental sustainability and manufacturing
simplicity relative to conventional slurry-based electrode production.
Figure 2 - Surface view of the LFP/LLZO/CNT matrix. Scanning electron microscope (SEM) images of the single-
step, solvent-free co-deposited layer. Left: wide-field view (20µm) of the composite cathode/electrolyte layer
(LFP cathode, LLZO reference electrolyte and carbon-nanotube network), showing a dense, uniform coating.
Top right: higher-magnification image (1 µm), showing the distribution of cathode and electrolyte particles.
Bottom right: higher-magnification image (500nm) showing intact carbon-nanotube network after deposition.
Each carbon-nanotube is roughly a few thousand times thinner than a human hair, forming a lightweight
conductive network.
AMORPHOUS SOLID-STATE ELECTROLYTE (ASE) PROGRAM PROGRESS
During the Quarter, the ASE program continued, with the amorphous solid-state electrolyte benchmarked
at 3.2 mS cm⁻¹ ionic conductivity — described as superionic-class and sulphur-free — building on the 1,200-
hour room-temperature interface stability previously reported (refer to ASX:CRR announcement 28 May
2026). The ASE is distinct from the LLZO reference electrolyte used in the current DSD composite and has not
yet been integrated into a complete cell.
- Stable performance over 1,200 hours: The amorphous solid-state electrolyte demonstrated sustained
lithium-metal interface stability over 1,200 hours of continuous operation at room temperature —
addressing one of the most persistent early-stage technical barriers in solid-state battery development.
- Room-temperature ionic conductivity of 3.2 mS cm⁻¹: Confirmed efficient lithium-ion transport under
ambient conditions, with a low activation energy of 0.27 eV — a foundational requirement for practical
solid-state battery operation.
Critical Resources Limited – www.criticalresources.com.au
Level 45, 108 St George's Tce, Perth WA 6000
P: +61 (8) 9465 1024 E. info@criticalresources.com.au
ASX:CRR
- Lithium-metal compatibility confirmed: The ASE demonstrates stable lithium-metal interface behaviour,
materially reducing the interface-degradation failure mode that has constrained competing solid-state
electrolyte chemistries.
- Full solid-state cell architecture with ASE electrolyte demonstrated: Functional electrochemical
performance confirmed within a complete solid-state cell configuration, demonstrating performance
beyond isolated or component-level laboratory testing.
- Key technical uncertainty reduced: Results reduce one of the principal technical uncertainties observed
during laboratory evaluation, moving the ASE workstream from theoretical feasibility to laboratory-
validated performance within the structured NSF-supported CEPS evaluation framework.
STRATEGIC RELEVANCE AND NEXT STEPS
The integrated evaluation of both workstreams is designed to systematically reduce materials and
manufacturing risk in advancing toward early-stage prototype cell development. The program targets a six-
month structured evaluation workflow aligned to solid-state lithium-ion prototype cell configurations.
The solid-state lithium-ion battery strategy could, subject to the achievement of future development
milestones, support future collaboration between Critical Resources’ Mavis Lake lithium project and battery
technology companies, with the potential to position CRR across the value chain from resource
development to advanced solid-state battery technologies. Potential future applications include data
centres, defence, mining and grid-scale storage.
THERMAL MANAGEMENT – TWO-PHASE COOLING LICENCE
During the Quarter, Critical Resources executed a binding exclusive worldwide commercial licence with
NTUitive Pte Ltd, the innovation and enterprise company of Nanyang Technological University, Singapore
(NTU), covering four technology disclosures — including one granted US patent — relating to two-phase
cooling of lithium-ion batteries, CPUs and GPUs within high-density electronics and data-centre infrastructure
(refer to ASX:CRR announcements 30 April 2026 and 21 May 2026). Execution followed the Company's
nomination to hold the full commercial licence on exercise of the option held under an earlier evaluation
licence arrangement with NTU. The licence extends the Company's solid-state battery program into thermal
management — a key determinant of battery performance, cycle life and safety in elevated-temperature
operating environments.
The licensed technology sprays a dielectric (non-conductive) fluid directly onto heat-generating
components, drawing heat away as the fluid evaporates before the vapour is captured in a sealed
enclosure, condensed and recirculated in a closed loop. It is designed to operate with ambient-
temperature fluid at approximately 30°C, removing the need for refrigeration or mechanical chillers. The
portfolio also includes a thermal model of the spray-cooled system, providing the foundation for Model
Predictive Control (MPC) of cooling loads and, by extension, of battery operating temperatures. Published,
peer-reviewed academic test work by the technol
Share your feedback