Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2023
September 2023 Quarterly Activities Report
Breakthrough quarter as drilling success puts Mavis Lake on a clear
path to further resource growth and development
Highlights
•
Spectacular drilling results at the Mavis Lake Lithium Project throughout the Quarter,
including:
-
Drill Hole MF23-207 with 74.4m @ 1.18% Li2O from 176.15m down-hole;
Drill Hole MF23-210 with 41.25m @ 1.25% Li2O from 208.3m down-hole;
Drill Hole MF23-211 with 41.0m @ 1.18% Li2O from 206.6m down-hole;
Drill Hole MF23-213 with 50.2m @ 1.28% Li2O from 203.6m down-hole; and
Drill Hole MF23-214 with 65.45m @ 0.84% Li2O from 186.25m down-hole, including
25.85m @ 1.30% Li2O from 214m down-hole.
•
The consistent, thick, high-grade drilling results confirm and extend the Swell Zone
discovery, setting the pathway for future significant resource growth.
•
Mapping and sampling at the Gullwing and Tot pegmatite fields delivered excellent
results with spodumene-bearing pegmatite rock-chip samples returning grades from
2.2% Li2O to 3.2% Li2O.
•
Key appointments bolstered the management team with hard-rock lithium project
delivery and operations expertise, supporting continued project development
efforts and environmental studies.
•
Successful AUD$10.2M capital raising completed, underpinning ongoing programs
to drive resource growth and project development.
Lithium exploration and project developer Critical Resources Limited (ASX:CRR) (“Critical
Resources” or “the Company”) is pleased to report on its activities for the quarter ended
30 September 2023 (“the Quarter”).
During the Quarter, the Company remained firmly focused on the development of its 100%-owned
flagship asset in Canada, the Mavis Lake Lithium Project (“Mavis Lake”), with highly successful
resource drilling programs following up the breakthrough discovery of the Swell Zone.
Drilling throughout the quarter was focused on in-filling and extending this important new zone of
mineralisation, establishing a clear pathway for continued resource growth at Mavis Lake.
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 45. 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
Operational Activities
Mavis Lake Lithium Project (100%) – Ontario, Canada
Exploration. Exploration within the Mavis Lake Project Area continued throughout the Quarter with
both drilling at the Main Zone and mapping/sampling being undertaking around the Gullwing and
Tot pegmatite clusters.
Mavis Lake Main Zone. Assay results from drill hole MF23-207 confirmed an outstanding, thick
intercept of high-grade lithium mineralisation. With an exceptional intercept of 74.4m at 1.18% Li2O,
the discovery of a potential Swell Zone was the immediate focus for follow-up drilling.
Drill-hole MF23-208 intersected three significant mineralised zones, with multiple high-grade
sections over 2.2% Li2O. This drill-hole also demonstrated continuity of the Swell Zone discovered by
drill-hole MF23-207, with two intercepts of continuous, high-grade mineralisation, each over 13m in
length down-hole grading over 1.5% Li2O.
The deepest zone, starting at 343m down-hole, demonstrated the presence of significant
spodumene mineralisation at depth. Drill-holes MF23-209 and MF23-210 were designed to test the
down-dip extents of the Swell Zone trend identified by MF23-207. Both drill-holes returned multiple
thick intercepts of high-grade spodumene, including exceptionally high-grade zones grading over
3% Li2O.
MF23-211 was a step-out hole, collared west of MF23-207 and designed to test the lateral extension
of the Swell Zone. MF23-211 successfully intersected thick spodumene-bearing pegmatite, with an
average grade of 1.18% Li2O over 41m down-hole, with multiple sections grading over 2.1% Li2O.
Drill-holes MF23-213 and MF23-214 were designed to test the Swell Zone both east and west of
MF23-207. Both drill holes were highly successful, with intersections of spodumene mineralisation
ranging from 50-70m and exceptional grades of up to 4.18% Li2O.
Figure 1 – A sample of drill core from drill-hole MF23-213 – high-grade, coarse-grain
spodumene (from ~211m to ~227m down-hole)
Page 2 of 11
Figure 2 – Plan map and Section references
Figure 3 – Long Section of the Mavis Lake Resource
Page 3 of 11
Figure 4 – Cross-Section 524025E – significant intercepts highlighting the thick Swell Zone
Gullwing and Tot Prospects. During the Quarter, assay results were reported for sampling that was
undertaken over the Gullwing and Tot Lithium-Caesium-Tantalum (LCT) pegmatite outcrops.
Standout results include:
•
•
•
•
Sample 3347562 with 3.2% Li2O from spodumene;
Sample 347565 with 2.6% Li2O from spodumene;
Sample 347604 with 2.4% Li2O from spodumene; and
Sample 347561 with 2.2% Li2O from spodumene.
Page 4 of 11
The Gullwing and Tot prospects and associated claims are contiguous with the claims that
surround the Mavis Lake Main Zone, which hosts the Company’s 8Mt Inferred Resource. The
structured grass-roots prospecting program successful identified near-term exploration drilling
targets with further target refinement and development works ongoing in parallel with permitting
activities.
Figure 5 – Summary of key results from rock-chip sampling and mapping around the Gullwing
and Tot LCT pegmatites
Technical Studies. Technical study efforts concentrated on three key streams of metallurgy, mining
and mine infrastructure integration.
Metallurgical studies are expanding beyond the scoping level test work program completed in
early 2023. Preparation has commenced on a larger, more comprehensive test work program to
develop a robust end-to-end beneficiation flowsheet for the Project.
Mining studies work stream includes analysis of the latest geological data (principally
considerations from the recently discovered Swell Zone) and scheduling of further geological,
geotechnical and hydrological fieldwork programs.
Mine infrastructure works have been centered on initial engagement and project definition with
utilities and logistics providers that service the Mavis Lake/Dryden area, specifically rail and road
haulage operators and Thunder Bay port operators.
Page 5 of 11
Permitting. Field teams were deployed to Mavis Lake in support of key monitoring and assessment
efforts for permitting and approvals for a future operation. Environmental baseline studies are
required to support the anticipated Environmental Impact Assessment and to assist in identifying
design options and a preferred layout for mining and processing activities.
Spring and summer hydrology programs have been undertaken to capture seasonal water
movement and establish baseline water quality. Regular sampling will continue into the new year.
Initial fisheries studies commenced including habitat mapping, electrofishing/netting in ponds,
streams and lakes to determine the presence of fish species and determine the existence of any
sensitive watercourse.
Figure 6 – Electro-netting for fish in the Mavis Lake Project Area
Graphic Lake Lithium Project – Ontario, Canada
No exploration activities were completed during the Quarter.
Plaid and Whiteloon Lake Projects – Ontario, Canada
No exploration activities were completed during the Quarter.
Page 6 of 11
Halls Peak Project – New South Wales, Australia
The Company continued to engage the NSW Resources regulator to affirm rehabilitation works
were completed to the satisfaction of the Regulator, including independent review and inspection
of works. Ongoing administration continues to secure the release of rehabilitation bonds. No
exploration activities were completed during the Quarter.
Sohar Block 4 and Block 5 Project – Sultanate of Oman
The Company continued dialogue with in-country partners and stakeholders regarding future
prospects of the Block 4 and Block 5 projects including annual extension applications for
exploration licences. No exploration activities were completed during the Quarter.
Schedule of mineral tenements
The Company’s tenement and claim schedule can be seen in Appendix 1.
Lithium Market and Industry
The Quarter saw major announcements and investment commitments into building an electric
vehicle supply chain eco-system in Canda. Reuters reported on Northvolt’s plans to build a
significant battery facility in Canada. The facility has a phased production profile, with phase 1
targeting 30 GWh of capacity, then doubling with Stage 2 to total of 60 GWh. With a total
investment commitment of approximately US$9Bn, Northvolt were quoted as stating the choice of
location was driven by availability of sustainable energy, access to skilled workers, proximity to
natural resources and the supportive policies of North American governments. 1
Further upstream of battery facilities, the Canadian government announced its intention to
financially support Umicore subsidiary Umicore Rechargeable Battery Materials Canada Inc.
alongside Umicore’s commitment to build a new manufacturing plant in Loyalist, Ontario. The
facility will manufacture cathode active materials (CAM) and precursor cathode active materials
(pCAM) and will be the first of its kind in North America. Umicore site selection for the facility allows
it to provide industrial- scale services to electric vehicle and battery producers in both Canada
and the United States. Total investment is reported to be approximately CAD$2.8Bn. 2
Communities and Sustainability
Company personnel and contractors were honoured to take part in a cultural training workshop
facilitated by Wabigoon Lake Ojibway Nation (WLON). This valuable session provided participants
with a greater understanding of the Indigenous peoples’ rich history and role as protectors of the
lands and waters of the territory where the project is located.
The Indigenous peoples of the area are the Anishinaabe. The Mavis Lake Project is located within
Treaty Three traditional Territory of the Anishinaabeg Nation and the Northwestern Ontario Metis
Communities of Ontario Canada.
1 Source – Reuters 28 September 2023
2 Source – www.canada.ca
Page 7 of 11
Separately, the Company continued to work on the development of its communities’
engagement and consultation plans and commenced coordinating efforts for an inaugural
‘Townhall’ meeting in the City of Dryden (scheduled for October 2023).
The focus of the Townhall meeting was to introduce the company to the residential communities
and industries within Dryden and seek to establish ongoing dialogue regarding the Company’s
efforts to advance the Mavis Lake Project.
Finance
Capital Raise. During the Quarter Critical Resources successfully completed an AUD$10.2M capital
raising constituting flow-through shares (AUD$7.9m) and an institutional placement (AUD$2.3m).
The Flow-Through placement was conducted utilising the flow-through shares provision allowed
under Canadian Tax Law with the proceeds of the capital raising enabling the Company to
continue project development efforts centered Resource growth and environmental and
technical studies.
Exploration Expenditure. The Company invested approximately AUD$2.4m in exploration activities
across its project portfolio during the Quarter, approximately 96% was focused on Mavis Lake,
with almost all Mavis Lake expenditure allocated to drilling, field geological support, assays
and exploration consumables.
Milestone Payment. Following the announcement of the Company’s JORC 2012 Compliant,
Maiden Inferred Mineral Resources Estimate of 8Mt @ 1.07% at Mavis Lake in May 2023, the
Company completed the payment of the Milestone 1 Deferred Consideration for the Mavis Lake
Project during the Quarter, which included a cash payment of AUD$1.5 million to the project
vendors together with the issue of 2,322,341 fully-paid ordinary shares in consideration of the Mavis
Lake Facilitator Milestone 1 Shares as approved by shareholders on 15 December 2021.
Cash Position. The Company held cash and cash equivalents of AUD$7.3m as at 30 September
2023.
Other Disclosure. As disclosed under item 6 in the Appendix 5B, the Company made payments
to related parties for a total consideration of AUD$137k. This consideration relates to payments
attributable to routine Director fees, salaries and statutory superannuation.
Corporate Activity
Management Appointments. During the Quarter, Critical Resources bolstered its management
team with the appointment of personnel experienced in the areas of hard-rock lithium
studies/project development, project delivery and metallurgical processing.
Resources Rising Stars Investor Series. During September, Critical Resources’ Managing Director,
presented at the Resources Rising Stars Investor Series in Brisbane, Sydney and Melbourne. The
series of presentations focused on the increasing strategic importance of the Mavis Lake Project
to the development of a North American lithium supply chain.
Page 8 of 11
The Sydney presentation was recorded, and is available for viewing on the Company’s website
(at the following link)
Key Announcements during the Quarter
•
Permitting activities continue at Mavis Lake Lithium Project with Environmental Studied and
Cultural Training; 26 September 2023
•
Exceptional Lithium results with 65m intercept; 19 September 2023
•
Resources Rising Stars Investor Series - Presentation; 15 September 2023
•
Half Year Accounts; 13 September 2023
•
Multiple thick lithium intercepts continue at Mavis Lake; 11 September 2023
•
Development Focused Appointments; 29 August 2023
•
High Grade Intercepts Extend Mavis Lake Swell Zone; 21 August 2023
•
CRR Raises $10.2m to focus on Mavis Lake Resource Growth; 27 July 2023
•
Assay Results confirm 74.4m at 1.18% Li2O at Mavis Lake; 24 July 2023
•
Rock chips up to 3.2% Li2O at Gullwing and Tot prospects; 17 July 2023
This announcement has been approved for release by the Board of Directors.
-ends-
For further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9389 4499
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
P: +61 (0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is advancing and developing critical metals projects for a
decarbonised future. The Company holds a suite of lithium prospects across Ontario, Canada, including Mavis Lake,
Graphic Lake, Plaid and Whiteloon Lake. The Company’s other projects include a copper project in Oman, and a
base metals project in Halls Peak NSW, Australia.
The Company’s primary focus is the rapid development of its flagship Mavis Lake Lithium Project. Mavis Lake is an
advanced exploration project with near-term development potential. The Company completed over 19,500m of
drilling in 2022 and has commenced another significant drilling program in 2023. In early 2023, Critical Resources
released its maiden JORC Code 2012 Compliant Inferred Mineral Resource Estimate (MRE) for Mavis Lake with 8.0Mt
at 1.107% Li2O – making Critical Resources just one of two ASX-listed companies with a JORC Code 2012 compliant
mineral resource in Ontario. In parallel with continued Resource growth, the Company has also commenced initial
studies that will underpin the transition from explorer to developer.
COMPLIANCE STATEMENT
This announcement contains information regarding the Mavis Lake Mineral Resource Estimate extracted from ASX
market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code and available for
viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed. This document contains information on the Mavis Lake Lithium Project extracted from ASX market
announcements reported in accordance with the 2012 JORC Code and available for viewing at
Page 9 of 11
www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original ASX market announcement. ASX announcements pertaining to key
exploration details are as follows: “Resource Extension Drilling Underway at Mavis Lake Lithium Project”, 3 July 2023,
“Spectacular 74.4 metre Intercept of Continuous Spodumene Mineralisation at Mavis Lake”, 6 July 2023, “8.0Mt at 1.07%
Li2O Maiden Mineral Resource at Mavis Lake”, 5 May 2023, “Adoption of New Constitution”, 5 May 2023, “Rock chips up
to 3.2% Li2O at Gullwing and Tot prospects”, 17 July 2023, “Assay Results confirm 74.4m at 1.18% Li2O, including 32.95m
at 1.81% Li2O at Mavis Lake”, 24 July 2023, “Critical Resources Raises AUD$10.2M, to Focus on Resource Growth and
Development Works at Mavis Lake”, 27 July 2023, “Thick New High-Grade Intercepts Confirm and Extend Recently
Discovered “Swell Zone” at Mavis Lake”, 21 August 2023, “Key Appointments to Advance Project Development at Mavis
Lake Lithium Project”, 29 August 2023, “Thick Mineralised Intercepts up to 67.85m Across Multiple Zones, Including a
Continuous 53.6m Intercept”, 11 September 2023, “Resources Rising Stars Investor Series – Presentation”, 15 September
2023, “Exceptional Lithium Results from Swell Zone Drilling with 65.45m grading up to 1.39% Li2O and 50.2m @ 1.28% Li2O”,
19 September 2023 and “Permitting Activities Continue at Mavis Lake Lithium Project with Environmental Studies and
Cultural Training”, 26 September 2023.
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied,
as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this announcement.
Page 10 of 11
Appendix 1 – Schedule of mineral tenements at 30 September 2023
Claim Number
Project /
Location
101034, 101215-101218, 101616-101619, 103512, 107330107331, 109871, 110434, 110703, 116376, 117689-117690,
123068, 124332, 129509, 130111, 130299-130330, 135026,
135728, 138331, 138446, 139468-139470, 141103, 141801,
143041, 143046-143047, 144330, 144441, 151583-151585,
151642,157160-157161, 158448, 158546, 160902, 166897,
167079-167080, 167677, 168187-168188, 168229, 168328168329, 176105, 176198, 179416-179418, 179741-179743,
180192, 108489, 181000, 181037, 182187, 186194, 187649,
188359, 189624, 190960-190961, 196153-196154, 197591,
198244-198246, 199857, 201802, 203140-203142, 203594,
203763, 205589, 205676, 207864, 209134-209136, 210239,
210439, 212294-212295, 215413, 215824, 216365-216366,
228777-228778, 230161-230162, 233613-233614, 233867,
234948, 235582, 239067, 240149, 246549, 247620, 253509253510, 254970, 256451-256452, 256960, 257849, 257852,
259169, 259285, 264260, 266452, 267141, 270261, 271534,
271591, 272225-272226, 273079, 274526, 275823-275825,
278758, 281841, 282015, 283653-283655, 284320-284321,
286761-286763, 289910, 290059-290060, 290972, 292149,
302230, 303032, 303733-303734, 305020-305022, 306990,
307466-307467, 310379-313380, 312334, 314170-314171,
316293-316294, 316884, 325843, 326459, 329628-329631,
703383-703516, LEQ-108830 – LEA-108835
76580-765816, 766092-766191, 766195-766294, 766540766589, 766636-766685, 766745-766794, 766848-766898
Mavis Lake
Ontario
Canada
710276-710332, 710441-710491, 710659-710826, 710995711044, 717564-717591
659224-659228, 659230-659241, 686985 – 686998, 702287702311, 702357-702389,
EL 4474, EL 9428 – EL9430
EL 7679
Block 5*
Plaid &
Whiteloon
Lake
Ontario
Canada
Graphic Lake
Ontario
Canada
Halls Peak
NSW
Australia
Halls Peak
NSW
Australia
Oman
Acquired
Interest
during
quarter
Disposed
interest
during
quarter
Interest at
end of
Quarter
-
-
100%
-
-
100%
-
-
100%
-
-
100%
-
-
100%
-
-
59.5%
-
-
65%
Block 4*
Oman
51%
It is noted that in accordance with their terms and conditions, the Company has submitted the required annual extension
applications with respect to the Oman exploration licences and is awaiting confirmation if its application has been
accepted. This does not apply to the Oman mining licences.
Page 11 of 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Critical Resources Limited
ABN
Quarter ended (“current quarter”)
12 145 184 667
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (9
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(174)
(546)
(e) administration and corporate costs
(507)
(1,013)
-
-
17
18
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(664)
(1,541)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(9)
(14)
(d) exploration & evaluation
(2,383)
(7,585)
(e) investments
(1,500)
(2,149)
-
-
(c) property, plant and equipment
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(3,892)
(9,748)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
10,166
10,166
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
177
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(530)
(530)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
27
(11)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Repayment of lease liabilities)
(10)
(40)
3.10
Net cash from / (used in) financing
activities
9,653
9,784
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,000
8,573
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(664)
(1,541)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(3,892)
(9,748)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
9,653
9,784
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
176
228
4.6
Cash and cash equivalents at end of
period
7,273
7,273
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
6,942
1,676
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (security deposits)
331
324
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,273
2,000
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
1371
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
0
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
1 Related party
payments are attributable to director fees and salaries.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
Not applicable
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(2,383)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(3,047)
8.4
Cash and cash equivalents at quarter end (item 4.6)
7,273
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
7,273
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.39
(664)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
...........................31 October 2023..........................
Authorised by: ...............................By the Board..............................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market
Share your feedback
Discover