Multiple thick lithium intercepts continue at Mavis Lake
Released
Released
Announcement PDF
ASX Announcement
11 September 2023
Thick Mineralised Intercepts up to 67.85m Across Multiple
Zones, Including a Continuous 53.6m Intercept
Highlights
•
In-fill drilling continues to strengthen and expand the “Swell Zone” at Mavis Lake, with
multiple wide mineralised zones logged down-hole after recent drilling including;
-
MF23-214 with mineralised intercepts totaling 67.85m including a continuous
53.6m intercept with visual estimates of spodumene of 10%
-
MF23-226 with mineralised intercepts totaling 61.75m with visual estimates of
spodumene at 15%
-
MF23-225 with mineralised intercepts totaling 33.95m with visual estimates of
spodumene at 20%
•
The new mineralised intercepts are located along trend from the recently reported
diamond drill-holes MF23-207 to MF23-211, which returned intersections of 40-74m at
grades ranging from 1.18% Li2O to 1.25% Li2O.
•
A series of in-fill drilling intercepts have delineated mineralised widths significantly
greater than the current Inferred Mineral Resource Estimate (MRE) and has identified
possible new mineralised zones, highlighting the potential to add substantial tonnage
to a future MRE.
•
Assay results from 15 holes are pending and will be released to market as soon as
they become available.
Lithium exploration and project development company Critical Resources Limited ASX:CRR
(“Critical Resources” or “the Company”) is pleased to advise that follow-up drilling targeting the
recently discovered Swell Zone at the Mavis Lake Lithium Project in Ontario, Canada has intersected
further thick mineralised 1 pegmatite zones, adding significant momentum to its current resource
growth drilling program.
Logged intercepts from recent in-fill drilling, along trend from the breakthrough intercept of 74.4m
grading 1.18% Li2O including 32.9m @ 1.81% Li2O (see ASX release, 24 July 2023), have continued to
1 In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analysis where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. The
reported intersections are down hole measurements and are not necessarily true width. Descriptions of the mineral amounts seen and
logged in the core are qualitative, visual estimates only. Refer to Cautionary Note – Visual Estimates
Critical Resources Limited
ABN 12 145 184 667
ASX:CRR
Level 50, 108 St Georges Terrace, Perth WA 6000
P. +61 9389 4499 W. criticalresources.com.au E. info@criticalresources.com.au
highlight the significance of the Swell Zone discovery. This includes several in-fill intercepts which are
an order of magnitude wider than previous Resource modelling.
Current drilling forms part of a resource upgrade drilling program which commenced in June 2023.
Through its exploration efforts, Critical Resources is seeking to establish Mavis Lake as the largest
single-site, JORC Code 2012 Compliant Lithium Resource in Ontario.
Full exploration results are provided in Appendix 1.
In-fill Drilling
Recent drilling continues to successfully intersect the Swell Zone laterally, towards both the east and
west. The Company has deliberately opted for a tight in-fill drill-hole spacing (25-50m spacing) to
facilitate conversion of as much of the Resource to the higher-confidence Indicated category as
part of a future Mineral Resource upgrade.
The Swell Zone occurs within and extends outside of the current Inferred Mineral Resource Estimate
(MRE) shapes and, as such, is expected to add considerable tonnage to a future MRE upgrade.
The Swell Zone is likely emplaced in a remnant shear structure which could be related to regional
shear structures. Shearing is located proximally to the pegmatite contacts within the host rock,
multiple oriented measurements indicate the direction of the shearing is concordant to the
pegmatite emplacement.
The trend of the Swell Zone is becoming more apparent and current drill results illustrate increased
understanding of the emplacement, geometry and trend of the mineralised zone.
Figure 1 – Plan view of Mavis Lake with the Figure 3 cross-section reference
Page 2 of 13
While the Swell Zone intercepts contain pervasive spodumene mineralization, the intercepts often
contain multiple “core zones” that are characteristic of higher concentrations of spodumene as
shown in Figure 2.
Figure 2 – Large Spodumene lathes in dark grey quartz from drill hole MF23-225
In-fill drilling of the Swell Zone is currently tracking towards the east, with recent logged intercepts in
drill-holes MF23-225 and MF23-226 highlighting significant growth potential.
Both drill holes intersected mineralised pegmatite two-three times the width of the current MRE
shapes, indicating a clear pathway to resource upgrade in terms of both tonnage and category.
Recent drilling has also identified a possible significant new Lower Zone. An initial intercept from drill
hole MF23-208 (13.3m at 1.56% Li2O from 343.9m down-hole – refer to ASX Announcement released
21 August 2023) has been interpreted to link with a lower zone intersected in drill-holes MF23-214,
MF23-225 and MF23-226.
Key details are shown in Table 1, with the intercept cross-section shown in Figure 3.
The potential new Lower Zone has not been factored in previous resource modelling and presents
as an immediate target for follow-up drilling.
Table 1 – Significant Results from Drill-holes MF23-214, MF23-225 and MF23-2261
Main Zone Intercepts
Hole ID
From
To
Length
Visual Estimate of
Spodumene
Zone Area
MF23-214
186.25
239.85
53.6
10%
Swell Zone
and
242.9
251.7
8.8
10%
Swell Zone
and
349.55
355
5.45
10%
Lower Zone
MF23-225
208
233.75
25.75
20%
Swell Zone
Lower Zone
and
346.7
354.9
8.2
20%
MF23-226
145.7
155.65
9.95
15%
and
205.6
237.15
31.55
15%
Swell Zone
and
339.3
359.55
20.25
15%
Lower Zone
Page 3 of 13
Future Work
Drilling is continuing to test and further define both the Swell Zone and the Lower Zone. The western
portion of the Swell/Lower trend is a high-priority and has yet to be thoroughly drill tested.
In order to test the western limits and the down-dip potential of the Swell Zone, a series of new drill
pad permits are required (and are currently awaiting regulatory approval).
Current drilling is focused on extending the Swell Zone to the east through targeted in-fill drilling,
while also targeting the Lower Zone at the same time.
Drill core samples from new 15 drill-holes have been sent for assay with results pending.
Figure 3 – Cross-section of drill-holes MF23-225 and MF23-226 with Projected pegmatite (yellow)
overlayed on the current MRE shape (light red) 1
Page 4 of 13
Critical Resources Managing Director, Alex Cheeseman said:
“Our confidence and understanding of the Mavis Lake mineralisation continues to increase with
every drill hole. Drilling is now hitting thick mineralised pegmatite regularly, as the Swell Zone is
tracked to the east and west.
“The addition of a possible new Lower Zone also provides an exciting opportunity to add tonnage
to a future Resource upgrade.
“We also must not lose sight of the significance of what is happening in the region surrounding Mavis
Lake. Southern Ontario and Michigan State are being subjected to billions of dollars of investment
to build out electric vehicle manufacturing and supply chain capacity.
“This investment further reinforces the enormous strategic opportunity for the Mavis Lake Project to
become an integral part of the booming North American battery raw materials market.”
This announcement has been approved for release by the Board of Directors.
-endsFor further information please contact
Alex Cheeseman
Managing Director
E: info@criticalresources.com.au
P: +61 (8) 9389 4499
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
ABOUT CRITICAL RESOURCES LIMITED Critical Resources is advancing and developing critical metals projects for a
decarbonised future. The Company holds a suite of lithium prospects across Ontario, Canada, including Mavis Lake,
Graphic Lake, Plaid and Whiteloon Lake. The Company’s other projects include a copper project in Oman, and a
base metals project in Halls Peak NSW, Australia. The Company’s primary focus is the rapid development of its flagship
Mavis Lake Lithium Project. Mavis Lake is an advanced exploration project with near-term development potential. The
Company completed over 19,500m of drilling in 2022 and has commenced another significant drilling program in 2023.
In early 2023, Critical Resources released its maiden JORC Code 2012 Compliant Inferred Mineral Resource Estimate
(MRE) for Mavis Lake with 8.0Mt at 1.107% Li2O – making Critical Resources just one of two ASX-listed companies with
a JORC Code 2012 compliant mineral resource in Ontario. In parallel, the Company has also commenced initial studies
that will underpin the transition from explorer to developer.
COMPETENT PERSONS STATEMENT The information in this ASX Announcement that relates to Exploration Results is based
on information compiled by Mr. Troy Gallik (P. Geo), a Competent Person who is a Member of the Association of
Professional Geoscientists of Ontario. Troy Gallik is a full-time employee of Critical Resources. Mr. Gallik has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Gallik consents to the inclusion in this
Announcement of the matters based on his information in the form and context in which it appears.
CAUTIONARY NOTE – VISUAL ESTIMATES The Company stresses that the reported visual estimated percentages in Table
1 relate specifically to the abundance of spodumene logged in the drill core and is not estimated lithium grade for the
interval. In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analysis where concentrations or grades
are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities
or deleterious physical properties relevant to valuations. Laboratory assay results are required to determine the widths
and grade of the visible mineralisation reported in preliminary geological logging. The Company will update the market
when laboratory analytical results become available. The reported intersections are down hole measurements and are
not necessarily true width. Descriptions of the mineral amounts seen and logged in the core are qualitative, visual
estimates (they are listed in order of abundance of estimated combined percentages). Quantitative assays will be
completed by Activation Lab.
COMPLIANCE STATEMENT This announcement contains information regarding the Mavis Lake Mineral Resource Estimate
extracted from ASX market announcement dated 5 May 2023 and reported in accordance with the 2012 JORC Code
Page 5 of 13
and available for viewing at criticalresources.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in any original announcement and that all material assumptions
and technical parameters underpinning the estimates in the original market announcement continue to apply and
have not materially changed. This document contains information on the Mavis Lake Lithium Project extracted from ASX
market announcements reported in accordance with the 2012 JORC Code and available for viewing at
www.criticalresources.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original ASX market announcement. ASX announcements pertaining to key
assays are as follows: Drill Hole MF22-64 refer to ASX announcement dated June 16 2022, Drill Holes MF22-72 refer to ASX
announcement dated July 21 2022, Drill Holes MF22-85 refer to ASX announcement dated 28 September 2022, Drill Hole
MF23-211 refer to ASX announcement dated 21 August 2023
FORWARD LOOKING STATEMENTS This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from results
ultimately achieved. Critical Resources Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither Critical Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Page 6 of 13
Appendix 1 - Exploration Results
Table 2 - Drill Hole Summary
Hole ID
Date Drilled
UTM Zone 15N (NAD83)
Collar Orientation
Metres Drilled
Hole ID
Start Date
End Date
Easting
Northing
Elevation
Az
Dip
Casing
Depth
End
Depth
MF23-214
28-Jul-23
01-Aug-23
524085
5518048
439
345
-75
3
377
MF23-225
28-Aug-23
01-Sep-23
524152
5518043
447
345
-78
3
392
MF23-226
01-Sep-23
05-Sep-23
524199
5518037
445
345
-78
3
377
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC-Code Explanation
Commentary
Sampling
Nature and quality of sampling
• Oriented NQ core was cut in half using a diamond saw, with a
or specific specialised industry
• No other measurement tools other than directional survey tools
techniques
(e.g., cut channels, random chips,
standard measurement tools
half core sent for assay and half core retained.
have been used in the holes at this stage.
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
• Oriented core was placed V-rail and a consistent cut-line drawn
along core to ensure cutting (halving) of representative samples.
• Sampling is conducted based on core logging, 100% of drill hole
core is logged. The core logger is a geologist, has experience in
lithium mineralisation, and determines the intervals of samples. All
pegmatite intersections are sampled regardless of the visual
mineralisation that are Material to presence of lithium minerals/spodumene. Host rock is typically
the Public Report. In cases where
not sampled as lithium mineralisation is localized to pegmatites
‘industry standard’ work has been (spodumene mineral) or their alteration halos (holmquistite
done this would be relatively
mineral) within mafic volcanic host rock.
simple (e.g., ‘reverse circulation
drilling was used to obtain 1 m
• Determination of mineralisation has been based on
samples from which 3 kg was
geological logging and photo analysis.
charge for fire assay’). In other
• Diamond Core drilling was used to obtain 3m length
required, such as where there is
metre intervals based on the drillers core block
pulverised to produce a 30 g
cases more explanation may be
samples from the barrel which are then marked in one
coarse gold that has inherent
measurement.
commodities or mineralisation
• Assay samples are selected based on geological
sampling problems. Unusual
types (e.g., submarine nodules)
logging boundaries or on the nominal metre marks.
Page 7 of 13
Criteria
JORC-Code Explanation
Commentary
may warrant disclosure of detailed • Samples will be dispatched to an accredited laboratory
Drilling
techniques
information.
(ActLabs) in Dryden, Ontario, Canada for sample preparation and
Drill type (e.g., core, reverse
• NQ2 diamond double tube coring by Cyr EF-50 rig was used
circulation, open-hole hammer,
shipment to analysis.
throughout the hole.
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core
diameter, triple or standard tube,
depth of diamond tails, faceDrill sample
recovery
• Core orientation was carried out by the drilling contractor.
sampling bit or other type, whether
Method of recording and
assessing core and chip sample
recoveries and results assessed.
• Lithological logging, photography
• Core samples were measured with a standard tape within the
core trays. Length of core was then compared to the interval
drilled, and any core loss was attributed to individual rock units
based on the amount of fracturing, abrasion of core contacts,
and the conservative judgment of the core logger. Results of core
Measures taken to maximise
loss are discussed below.
representative nature of the
• Experienced driller contracted to carry out drilling.
sample recovery and ensure
samples.
•In broken ground the driller produced NQ core from short runs to
maximise core recovery.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
• Core was washed before placing in the core trays.
• Core was visually assessed by professional geologists before
cutting to ensure representative sampling.
• See “Aspects of the determination of mineralisation that are
Material to the Public Report” above.
Logging
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc)
photography.
Page 8 of 13
Criteria
JORC-Code Explanation
Commentary
The total length and percentage
• Core samples were not geotechnically logged.
of the relevant intersections
logged.
• Core samples have been geologically logged to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• The core logging was qualitative in nature.
• All core was photographed
Total length of MF23-214 was 377m
• 100% of the relevant intersections were logged.
Total length of MF23-225 was 392m
• 100% of the relevant intersections were logged.
Total length of MF23-226 was 377m
• 100% of the relevant intersections were logged.
Sub-sampling
If core, whether cut or sawn and
sample
taken.
techniques and
preparation
whether quarter, half or all core
•Oriented core was placed V-rail and a consistent cut-line
drawn along core to ensure cutting (halving) of representative
samples
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
•Oriented NQ core was cut in half using a diamond saw, with half
core sent for assay and half core retained.
•Core sample intervals were based in logged mineralisation
•No duplicates or second half-sampling
• Appropriate method: oriented NQ core cut in half using a
diamond saw, with a half core sent for assay and half core
Quality control procedures
retained
adopted for all sub-sampling
stages to maximise representivity
of samples.
Measures taken to ensure that the
sampling is representative of the
in situ material collected, including
for instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of assay The nature, quality and
data and
laboratory tests
• Assays methods appropriate for style of mineralisation will be
appropriateness of the assaying
used:
and whether the technique is
ICPOES + ICPMS.
and laboratory procedures used
UT-7 (Li up to 5%) QOP Sodium Peroxide (Sodium Peroxide Fusion
considered partial or total.
-
No assay results are available nor have been reported at this
time.
Page 9 of 13
Criteria
JORC-Code Explanation
Commentary
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
•Samples have been sent to an accredited laboratory - Activation
Laboratories Ltd. (ActLabs).
including instrument make and
• Either standards or blanks are inserted every 10th sample interval
factors applied and their
recent drilling are within acceptable margins of error.
Nature of quality control
• Activation Laboratory performs internal QA/QC measures.
model, reading times, calibrations as a part of a QAQC process. Standard and blank results from
derivation, etc.
procedures adopted (e.g.,
standards, blanks, duplicates,
external laboratory checks) and
Results are released once all internal QA/QC is verified and
confirmed to be acceptable.
whether acceptable levels of
accuracy (i.e., lack of bias) and
precision have been established.
Verification of
The verification of significant
assaying
independent or alternative
sampling and
intersections by either
company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
Location of data Accuracy and quality of surveys
points
used to locate drill holes (collar
• No independent verification completed at this stage.
• No holes are twins of previous holes.
• Core measured, photographed and logged by geologists.
Digitally recorded plus back-up records.
• All assay results are provided.
• No adjustments to the assay data.
• No assay cut off grades are applied.
• Drill collars recorded with Garmin GPS that has an accuracy in
the order of ±3 metres for location. A registered surveyor will be
and down-hole surveys), trenches, contracted to accurately survey all drill collars at completed of
mine workings and other locations drill program.
used in Mineral Resource
estimation.
Specification of the grid system
used.
Quality and adequacy of
topographic control.
Data spacing
and distribution
• WGS 1984 UTM Zone 15N.
• No specific topography survey has been completed over the
project area.
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and
grade continuity appropriate for
the Mineral Resource and Ore
Page 10 of 13
Criteria
JORC-Code Explanation
Commentary
Reserve estimation procedure(s)
• Not relevant to current drilling.
and classifications applied.
• Not relevant to current drilling.
Whether sample compositing has •Core sample intervals were based in logged mineralisation and
been applied.
no sample composting applied. Reporting of final results includes
many weighted average- composting of assay data.
Orientation of
Whether the orientation of
to geological
sampling of possible structures
data in relation
structure
sampling achieves unbiased
and the extent to which this is
known, considering the deposit
type.
• The orientation of the mineralisation is unknown. The drilling
program is aimed at determining orientation of the
mineralisation.
• If orientation of mineralisation is known or thought to be known,
drill holes are planned to intersect at an appropriate angle
relative to true width of the mineralisation. Intercepts with
If the relationship between the
mineralisation released are given as downhole widths, not true
orientation of key mineralised
• It is uncertain whether sampling bias has been introduced, or
drilling orientation and the
structures is considered to have
introduced a sampling bias, this
widths unless true widths are stated
whether the thickness drilled is a true thickness.
should be assessed and reported
if material.
Sample security The measures taken to ensure
sample security.
• Core samples were stored at the Dryden core yard and core
shack under lock and key before delivery to ActLabsGroups in
Dryden, Ontario for analysis.
Audits or reviews The results of any audits or reviews • Not undertaken at this stage.
of sampling techniques and data.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC-Code Explanation
Mineral
Type, reference name/number,
tenement and
land tenure
status
location and ownership including
Commentary
The Mavis Lake Lithium Project consists of 1097 unpatented
Single Cell Mining Claims and six separate surface leases which
agreements or material issues with secure the surface rights of the land required for the Project
third parties such as joint ventures, footprint.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at
All claims and leases are active and in good standing. The
leases have a term of 21 years and are not set to expire until
2032, at which time they can be renewed for an additional 21
years if required.
the time of reporting along with
any known impediments to
obtaining a licence to operate in
the area.
Page 11 of 13
Criteria
JORC-Code Explanation
Commentary
Exploration done Acknowledgment and appraisal of • Previous exploration has been conducted by a number of
parties including Lun-Echo Gold Mines Limited (1956), Selco
by other parties exploration by other parties.
Mining Corporation (1979-1980), Tantalum Mining Corporation of
Canada Limited (1981-1982), Emerald Field Resources (2002),
International Lithium Corp (2006-2021) and Pioneer Resources
Limited/Essential Metals Limited (2018-2021).
Geology
Deposit type, geological setting
Drill hole
A summary of all information
Information
and style of mineralisation.
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
Easting and northing of the drill
hole collar
• The Fairservice and Mavis Lake Prospects host zoned pegmatites
that are prospective for lithium and tantalum
Hole ID
Easting
Northing
Elevation
Az
Dip
End
Depth
MF23-214
524085
5518048
439
345
-75
377
MF23-225
524152
5518043
447
345
-78
392
MF23-226
524199
5518037
445
345
-78
377
• All drill collars are re-surveyed at a later date upon completion
of drill hole for accurate collar coordinates.
Elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
Dip and azimuth of the hole
down hole length and interception
depth
hole length.
If the exclusion of this information
is justified on the basis that the
information is not Material and this
exclusion does not detract from
the understanding of the report,
the Competent Person should
clearly explain why this is the case.
Data
In reporting Exploration Results,
methods
maximum and/or minimum grade
aggregation
weighting averaging techniques,
• Uncut.
truncations (e.g., cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
• All aggregate intercepts detailed on tables are weighted
averages.
Where aggregate intercepts
incorporate short lengths of high- • None used.
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
Page 12 of 13
Criteria
JORC-Code Explanation
Commentary
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
These relationships are particularly • True width is calculated from logging geologists structural
mineralisation
Exploration Results.
between
widths and
intercept lengths
important in the reporting of
If the geometry of the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
measurements from upper and lower contacts of pegmatite
dyke and the host rock. Resource shapes and geometries may
aid in determine true widths as the pegmatites chaotic contacts
can be miss leading. True widths are provided unless otherwise
stated.
• The precise geometry is not currently known but is being tested
by the planned drilling, with diamond drill hole azimuths designed
If it is not known and only the down to drill normal to the interpreted mineralised structure.
hole lengths are reported, there
should be a clear statement to this
• Down-hole length reported, true width has been interpreted.
effect (e.g., ‘down hole length, true
width not known’).
Diagrams
Appropriate maps and sections
(with scales) and tabulations of
• Refer to images in the main document.
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of drill
hole collar locations and
appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of • Representative reporting of all relevant grades is provided in
all Exploration Results is not
practicable, representative
tables to avoid misleading reporting of Exploration Results.
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Other
substantive
Other exploration data, if
meaningfu
Share your feedback