Annual Report to shareholders
Released
Released
Announcement PDF
Annual Report
For the Year Ended 31 December 2023
ABN 12 145 184 667
www.criticalresrouces.com.au
2023 HIGHLIGHTS
24,427
324%
Meters of drilling
completed at the Mavis
Lake Lithium Project
Increase in Project Area
following Gullwing/Tot
acquisition
100%
8,000,000
Health, safety and
environment record,
with zero reportable
incidents
@ 1.07% Li2O Maiden
MRE defined at Mavis
Lake, 840k Maiden MRE
defined at Halls Peak
$10.2M
AIP
Raised and invested
into resource definition
and continued resource
growth
Critical Resources Limited – Annual Report 2023
Signed with Wabigoon
Lake Ojibway Nation,
baseline environmental
studies initiated
CORPORATE INFORMATION
DIRECTORS
Mr Robert Martin
Mr Alex Cheeseman
Mr Nigel Broomham
Mr John Markovic
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
COMPANY SECRETARY
Mr Harry Spindler
REGISTERED AND PRINCIPAL OFFICE
Level 45, 108 St Georges Terrace
Perth WA 6000
Telephone (08) 9465 1024
Website www.criticalresources.com.au
POSTAL ADDRESS
Level 45, 108 St Georges Terrace
Perth WA 6000
AUDITORS
BDO Audit (WA) Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
SHARE REGISTER
Computershare Investor Services Pty Limited
GPO Box 2975
Melbourne, VIC 3001
Telephone 1300 850 505
(03) 9415 4000
Critical Resources Limited shares are listed on the Australian Securities Exchange (ASX)
ASX Code
CRR
ACN
145 184 667
ABN
12 145 184 667
In this report, the following definitions apply:
“Board” means the Board of Directors of Critical Resources Limited
“Critical” or the “Company” means Critical Resources Limited ABN 12 145184667
“Group” means Critical Resources Limited and its controlled entities
Critical Resources Limited – Annual Report 2023
1
CONTENTS
DIRECTORS’ REPORT ...................................................................................................................................... 3
AUDITORS INDEPENDENCE DECLARATION ............................................................................................... 23
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME................. 24
CONSOLIDATED STATEMENT OF FINANCIAL POSITION ............................................................................ 25
CONSOLIDATED STATEMENT OF CASH FLOWS ......................................................................................... 26
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ............................................................................. 27
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS ......................................................................... 28
DIRECTORS’ DECLARATION ........................................................................................................................ 56
INDEPENDENT AUDITOR’S REPORT ............................................................................................................. 57
ASX ADDITIONAL INFORMATION ................................................................................................................ 61
Critical Resources Limited – Annual Report 2023
2
Directors’ Report
DIRECTORS’ REPORT
The directors of Critical Resources Limited (‘Critical’ or the ‘Company’) (ASX: CRR) submit the financial report
of the Company and its controlled entities (the ‘Group’) for the year ended 31 December 2023.
DIRECTORS
The names and particulars of directors who are in office at the date of this report:
Mr Robert Martin
Mr Alex Cheeseman
Mr John Markovic
Mr Nigel Broomham
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director (appointed 6 October 2023)
The names and particulars of directors who are not in office at the date of this report but who held office
during the financial year:
Mr Michael Leu
Non-Executive Director (resigned 27 March 2023)
Directors have held office since the start of the financial year to the date of this report unless otherwise
stated.
COMPANY SECRETARY
Mr Harry Spindler
PRINCIPAL ACTIVITIES
The principal activity of the Group during the financial year was mineral exploration and development
across a range of projects but with particular emphasis on the Company’s flagship Mavis Lake Lithium
Project in Ontario, Canada. There were no significant changes in the nature of the Group’s principal activity
during the financial year.
RESULTS
The result for the year ended 31 December 2023 attributable to members of the Company was a net loss
after tax of $5,982,982 (2022; $2,293,261). As at 31 December 2023, the Group had cash and cash
equivalents of $5,496,159 (2022; $8,573,127) and net assets of $26,810,183 (2022; $24,543,597).
DIVIDENDS
No amounts have been paid or declared by way of dividend during or since the end of the financial year.
REVIEW OF OPERATIONS
Corporate
The following events summaries the major corporate activities during the year:
On 27 July 2023, the Company completed a capital raising of AUD$10.2 million before costs, with AUD$7.9
million raised utilising the “flow through shares” provision under Canadian tax law, through the issue of
129,161,955 fully-paid ordinary shares at AUD$0.0609 per share. The Flow-Through Shares were issued at a
14.9% premium to the last closing price of Critical Resources shares prior to the offer. Concurrently, an
institutional placement of AUD$2.3 million was completed through the further issue of 51,111,111 fully-paid
ordinary shares at AUD$0.045 per share.
During the period, Non-Executive Director, Mr Michael Leu resigned his position in March 2023. Mr Nigel
Broomham was appointed as a Non-Executive Director in October 2023.
Lithium Project Acquisitions
In January 2023, the Company completed the acquisition of a 100% interest in the Gullwing and Tot
Property, which lies adjacent to the Company’s Mavis Lake Property. The Gullwing and Tot Property was
acquired from TSX-V listed Power Metals Corp (‘Power Metals’).
Critical Resources Limited – Annual Report 2023
3
DIRECTORS’ REPORT
Concurrently, the Company staked an additional 416 individual claims to ‘link’ the Mavis Lake Property with
the Gullwing and Tot Property, forming a new/combined Mavis Lake Project Area covering approximately
22,984 hectares.
The key transaction terms with Power Metals were:
An AUD$0.66 million (CAD$0.6 million) cash payment to the Sellers (completed);
The issue of AUD$0.66 million (CAD$0.6 million) worth of shares in Critical Resources to the Sellers (or
their nominees) of deemed value (issued 30 December 2022) (completed); and
Agreement to grant a 1% Gross Margin Royalty for mineral production within the mining claims
acquired by the Company.
Environment, Social and Governance and Sustainability
The Company continued its practice of routine internal reporting on ESG and Health and Safety matters
throughout the year. No environmental incidents nor health and safety incidents were reported/recorded.
A major focus of the Company was delivering on ESG initiatives centred on both regional and First Nation
communities’ engagement.
The Company continued to actively support local industry initiatives including participation and sponsorship
of ‘Women in Mining in Northwestern Ontario’ and participation in Thunder Bay’s annual Mining Day event.
Following the Company’s first town hall meeting in Dryden (October 2023), the Company initiated the
formation of a Citizens Committee, bringing together various community user groups and interested parties
in and around the Mavis Lake Project Area. The Citizens Committee terms of reference are available on
the Company website, with the overarching purpose of the Citizens Committee being to provide a forum
for open and transparent communication between the Company and Committee members.
Separate to the Citizens Committee, the Company continued its active dialogue and engagement with
First Nations communities throughout the year. Applicable (as defined by the Ministry of Northern
Development and Mines) First Nations communities are consulted and engaged prior to exploration drill
pads being permitted. The Company also executed an Agreement in Principle (AIP) with Wabigoon Lake
Ojibway Nation (WLON) in June 2023. The AIP defines how Critical Resources and WLON will work together
and collaborate to allow continued exploration and project development work by the Company at Mavis
Lake. It also ensures that all activities are undertaken in a respectful manner that acknowledges WLON’s
connection to the land and waters in the Mavis Lake area.
Operations
A brief overview of each of the existing projects and the work conducted during the course of the year
and up to the date of this report is provided below:
LITHIUM PROJECTS – CANADA
Mavis Lake Lithium Project, Ontario
Having commenced the inaugural drilling program at the Mavis Lake Lithium Project in early 2022, Critical
Resources spent most of the 2023 calendar year focused on continued exploration and resource growth
drilling in and around the Mavis Lake Main Zone. With a view that the Mavis Lake Project would deliver a
resource base sufficient to justify a future mining operation, the Company also commenced a series of
workstreams essential to developing the project and setting Mavis Lake on a pathway to be a future mining
operation, supplying lithium raw materials to the North American Electric Vehicle and clean energy market.
Exploration. The Company completed 24,427 meters of drilling in 2023, principally between the months
January to April and June to November. Drilling in the first part of the year was focused on testing pegmatite
outcrops adjacent the Main Zone, with multiple high-grade intercepts resulting in the discovery and
delineation of additional spodumene-bearing pegmatites located ~300m south and south-east of the Main
Zone.
A deliberate decision was made at the end of March to commit all results from 2022 and 2023 (up to
31 March 2023) to a Maiden Mineral Resource Estimate (MRE). This process was initiated in order to have a
clear value proposition and resource base as the foundation of the Company’s growth strategy.
Critical Resources Limited – Annual Report 2023
4
DIRECTORS’ REPORT
In May 2023, the Company announced a Maiden Inferred MRE of 8.0 million tonnes grading 1.07% Li2O. At
the time of the MRE announcement, the Company already had additional, compelling assay data to inform
a future MRE-upgrade and advised its intention to target year-on-year resource growth at Mavis Lake.
The re-commencement of drilling in late June delivered immediate success from standout drill-hole
MF23-207, which intersected 74.4m @ 1.18% Li2O. Subsequent drilling continued to delineate a large, thick,
continuous structure, starting from surface and extending over 1.25km in strike.
Drilling also encountered a deeper pegmatite structure with intersects ranging from 13m to 20m thick with
high-grade mineralisation of up to 1.44% Li2O (drill hole MF23-226). A total of 16,753 meters drilled from April
to November will be included into the next resource upgrade.
Beyond Main Zone drilling, exploration efforts also commenced on the Northern Prospects. With its large,
prominent spodumene bearing outcrops, the Northern Prospect area represents an excellent opportunity
to rapidly build on the Mavis Lake Resource base.
Exploration centred on drill target development away from the primary outcrop targets. Multiple techniques
were deployed including mobile metal ion (MMI) soils, low-altitude, high-resolution airborne magnetometry
and a LiDAR survey. At the end of the year, results were still pending but the Company expects to receive
the results in the first quarter of CY2024 and will utilise the results to refine future drill targets for testing later in
CY2024.
Project Development. Critical Resources has maintained a strategy of progressing project development
work in parallel with resource growth. Key project development work streams undertaken throughout the
year were centred on metallurgical test work, scoping study/preliminary economic assessment study inputs
and permitting/baseline data collection.
Metallurgical test work programs were initiated towards the end of 2022, with results received in early 2023.
The scope of the test work program was designed to support Scoping Study level studies. The first tranche
of test work was designed as a basic mineralogical characterisation and coarse fraction Heavy Liquid
Separation (HLS) test work program focused HLS and magnetic separation.
The second tranche of test work was expanded to incorporate concentration test work on both the HLS
middlings and fines components. From this, a global grade and recovery balance was developed.
Exceptional grades were achieved with concentrates ranging from 5.99% Li2O to 6.02% Li2O and global
lithia recoveries ranging from 77.6% to 87.3%. Late in the year, the Company commissioned an ore-sorting
amenability test work program, with initial results expected in the first half of CY2024.
Study works were initiated early in the year, aimed at defining the process and non-process infrastructure
requirements for the project, as well as the preliminary estimated capital and operating costs for the future
operation.
Scoping-level studies address specific project development, delivery and operating considerations
including (but not limited to) permitting and approvals, mine planning, beneficiation flowsheet, risk
management, sustainability measures and product logistics. Importantly, the studies will provide initial
indications of the Project valuation matrix, opportunities for optimisation and the forward-work plan required
to bring Mavis Lake into production.
Baseline environmental studies are a critical work-stream as they underpin the permitting requirements for
a future mining operation. During the year, a series of baseline data capture programs were completed in
the Mavis Lake Area of Focus (“AOF”), which is an area approximately 3km by 3km centred on the location
of the current Mineral Resource Estimate.
The AOF encompasses an area beyond the expected footprint of a future mining operation and was
designed to ensure that studies and assessments capture and consider both primary and secondary order
impacts of any future mining and processing activity.
Table 1: Mavis Lake JORC Code 2012 Mineral Resource Estimate
JORC
Classification
Inferred
Li2O cut-off grade
(%)
0.3
Tonnage
(Mt)
8.0
Total
Inferred
8.0
Critical Resources Limited – Annual Report 2023
Li2O (%)
1.07
SG
(calc)
2.80
1.07
5
DIRECTORS’ REPORT
Graphic Lake Lithium Project, Canada
With the Company focusing its resources at Mavis Lake, no fieldwork or desktop work was undertaken at
the Graphic Lake Project during the reporting period. The Graphic Lake claims remain in good standing
due to previous expenditure. Exploration activities will likely be planned for CY2025.
Plaid and Whiteloon Lake Project, Canada
With the Company focusing its resources at Mavis Lake, no fieldwork was undertaken at either the Plaid or
Whiteloon Projects during the reporting period.
Subsequent to year-end, desktop work and assessment was carried out over the prospectivity of the project
area. An independent review, along with internal assessment concluded that there was no prospectivity
for lithium mineralisation across the project area, driven principally by the underlying geological setting of
the project not being conducive for the formation of LCT pegmatites.
Accordingly, the Company relinquished the project claims during February 2024.
OTHER PROJECTS
Halls Peak Project, Australia
Throughout the period, work efforts for the Halls Peak Project centred on resource estimation and
rehabilitation.
The Halls Peak Project (Exploration Licence (EL) 4474) is located approximately 45km south-east of Armidale,
New South Wales in the New England Fold Belt, an area well known for its mineral endowment and historical
production. Halls Peak hosts a large polymetallic mineral system.
Drilling campaigns within EL4474 have confirmed multiple stacked lodes of base (zinc, lead and copper)
and precious metals (silver and gold) mineralisation.
The Halls Peak massive sulphide deposits were discovered in 1896 with near surface mining extracting highgrade zinc, lead, copper and silver. Drilling completed by the Company yielded excellent, high-grade
intersections of zinc, lead, copper and silver.
Halls Peak is considered to have potential to contain world-class deposits similar to those already being
mined in northern Australia. The project area comprises multiple historic mines and prospects including
Gibsons, Sunnyside, Firefly, Faints, Khans Creek, Keys and Mickey Mouse.
The vast majority of the lateral and vertical extent of the mineralisation system has never been drill tested.
SEDEX Zinc-Lead-Copper-Silver deposits are interpreted by the Company to be the dominant mineralisation
style discovered at Halls Peak.
During the period, the Company engaged an independent Resource Geologist to review all available
drilling data and prepare a JORC Code 2012 compliant Mineral Resource Estimate (MRE) for the Halls Peak
Project. A maiden Inferred MRE of 840,000t grading 3.7% zinc, 1.5% lead, 0.4% copper, 30ppm silver and
0.1ppm gold has been defined and was announced by the Company in June 2023. Modelling work that
underpinned the MRE identified that the mineralisation remains open along strike to the east/north-east
and west/south-west, highlighting immediate potential to increase the MRE with follow-up drilling.
An Exploration Target was prepared and announced in accordance with the JORC Code 2012. The
Exploration Target of 500,000 to 1,000,000 tonnes at similar grades to the Maiden MRE (2.7-3.7% zinc, 1.11.5% lead, 0.34-0.44% copper, 27-33ppm silver and 0.08-0.12ppm gold) was defined, based on modelling
and interpretation of the current Resource. The Company notes that the potential quantity and grade of
the Exploration Target is conceptual in nature, there is currently insufficient exploration completed to
estimate a mineral resource of this size, and it is uncertain whether further exploration will result in the
estimation of an increased JORC Code 2012 MRE.
During the period, field works were limited to site inspections and rehabilitation efforts necessary to comply
with the Exploration Licences approved by the NSW resource regulator. Rehabilitation works were
Critical Resources Limited – Annual Report 2023
6
DIRECTORS’ REPORT
completed to the required standard and security bonds held by the Regulator were subsequently returned
to the Company.
Table 2: Halls Peak JORC Code 2012 Mineral Resource Estimate
JORC
Classification
Inferred
Zn cut-off grade
(%)
2.0
Tonnage
(Mt)
0.84
Total
Inferred
0.84
3.7
Pb
(%)
1.5
Cu
(%)
0.44
Ag
ppm
30
Au
ppm
0.1
3.7
1.5
0.44
30
0.1
Zn (%)
SG
(calc)
2.80
Sohar Copper Project - Oman
During the reporting period, efforts were focused on divesting the Sohar Copper Project. Extensive due
diligence was undertaken by various parties however, no binding agreement was reached.
Given the Company’s focus on its lithium assets, as well as the jurisdictional complexities and limited bona
fide interest received in acquiring the Sohar Copper Project, the Company fully impaired the Project to $nil
during H1 2023 and has deemed the asset as non-core.
Subsequent to the end of the period, the Company was advised by the Ministry of Energy and Minerals,
Sultanate of Oman, that the exploration licences over Block 4 and Block 5 had expired and would not be
renewed as they had reached the end of their stated renewal period. The Company engaged the Ministry
both via its regional management and its in-country partners, who subsequently reaffirmed the Ministry’s
position. While the Company retains its shareholdings and associated asset interests in Al Fairuz Mining LLC
and Al Thuraya Mining LLC, the Company is currently engaged in discussions with the in-country partners
and other company shareholders regarding the future of these business entities and associated assets.
Project Generation
While its principal focus remains expanding the Resource base at Mavis Lake and advancing the project
towards development, the Company continues to assess additional exploration and early-stage project
opportunities that may bolster the Mavis Lake Lithium Project. Key requirements are that any project offers
potential operating synergies with the envisaged future mining operation at Mavis Lake, specifically similar
metallurgical and mineralogy properties and common/shared logistics corridors.
Business Risks
The Group, as an exploration company, faces inherent risks in its activities which may materially affect its
operations. Key risks identified which the Group are exposed to include:
Future capital requirements
The Company has no operating revenue and is unlikely to generate any operating revenue unless and until
the Projects are successfully developed and production commences. The future capital requirements of
the Company will depend on many factors including its business development activities.
In order to successfully develop the Projects and for production to commence, the Company will require
further financing in the future, in addition to amounts raised to date. Any additional equity financing may
be dilutive to Shareholders, may be undertaken at lower prices than the then market price (or Offer Price)
or may involve restrictive covenants which limit the Company’s operations and business strategy. Debt
financing, if available, may involve restrictions on financing and operating activities.
Although the Directors believe that additional capital can be obtained, no assurances can be made that
appropriate capital or funding, if and when needed, will be available on terms favourable to the Company
or at all. If the Company is unable to obtain additional financing as needed, it may be required to reduce
the scope of its activities and this could have a material adverse effect on the Company’s activities
including resulting in the Claims being subject to forfeiture, and could affect the Company’s ability to
continue as a going concern.
The Company may undertake additional offerings of Securities in the future. The increase in the number of
Shares issued and outstanding and the possibility of sales of such Shares may have a depressive effect on
Critical Resources Limited – Annual Report 2023
7
DIRECTORS’ REPORT
the price of Shares. In addition, as a result of such additional Shares, the voting power of the Company’s
existing Shareholders will be diluted.
Exploration and development risk
Mineral exploration and development is a high-risk undertaking. There can be no assurance that
exploration of the Projects or any other exploration properties that may be acquired in the future will result
in the discovery of an economic resource.
Even if an apparently viable resource is identified, there is no guarantee that it can be economically
exploited due to various issues including lack of ongoing funding, land tenure, land use, adverse
government policy, geological conditions, proximity to existing infrastructure and ability to build required
additional infrastructure, taxes, royalties, commodity prices or other technical difficulties.
The future exploration activities of the Company may be affected by a range of factors including
geological conditions, limitations on activities due to seasonal weather patterns, unanticipated operational
and technical difficulties, industrial and environmental accidents, fires (including forest fires), power failures,
labour disputes, native title process, changing government regulations and many other factors beyond the
control of the Company. The availability of insurance for such hazards and risks is extremely limited or
uneconomical at this time.
The success of the Company will also depend upon the Company having access to sufficient development
capital, being able to maintain title to its Projects and obtaining all required approvals for its activities. In
the event that exploration programs are unsuccessful this could lead to a diminution in the value of its
Projects, a reduction in the cash reserves of the Company and possible relinquishment of part or all of its
Projects.
Minerals and currency price volatility
The Group’s future prospects will be influenced by the prices obtained for the commodities produced and
targeted in the Group’s development and exploration programs.
The Group’s ability to proceed with the development of its Projects and benefit from any future mining
operations will depend on market factors, some of which may be beyond its control. It is anticipated that
any revenues derived from mining will primarily be derived from the sale of lithium. Consequently, any future
earnings are likely to be closely related to the price of base metals and the terms of any off-take
agreements that the Company enters into. The world market for minerals is subject to many variables and
may fluctuate markedly. Further, lithium mineral products are not exchange traded commodities. The
Group will require contracts for sale of these mineral commodities. There is no guarantee the Company will
secure contracts on terms favourable to the Company.
Commodity prices fluctuate and are impacted by factors including the relationship between global supply
and demand for minerals, forward selling by producers, costs of production, geopolitical factors (including
trade tensions), hostilities and general global economic conditions. Commodity prices are also affected by
the outlook for inflation, interest rates, currency exchange rates and supply and demand factors. Lithium
mineral product prices will depend on available markets at acceptable prices and distribution and other
costs. The market prices for lithium mineral products have been volatile and are influenced by numerous
factors and events beyond the control of the Group. For example, if industries reduce their demand for
end-products utilising lithium mineral products, the resulting change in demand for lithium mineral products
could have an adverse effect on the Group’s business.
Mineral prices are also affected by macroeconomic factors such as general global economic conditions
and expectations regarding inflation and interest rates. These factors may have an adverse effect on the
Company’s exploration, development and production activities, as well as on its ability to fund those
activities. Minerals are principally sold throughout the world in US dollars. The Company’s cost base will be
payable in various currencies including Australian dollars and US dollars. As a result, any significant and/or
sustained fluctuations in the exchange rate between the Australian dollar and the US dollar could have a
materially adverse effect on the Company’s operations, financial position (including revenue and
profitability) and performance. The Company may undertake measures, where deemed necessary by the
Board to mitigate such risks.
Sovereign Risk
Critical Resources Limited – Annual Report 2023
8
DIRECTORS’ REPORT
The Group’s Projects located in Canada and Oman are subject to the risks associated in operating in a
foreign country. These risks include economic, social or political instability or change, hyperinflation,
currency non-convertibility or instability and changes of law affecting foreign ownership, government
participation, taxation, working conditions, rates of exchange, exchange control, exploration licensing,
export duties, repatriation of income or return of capital, environmental protection, labour relations as well
as government control over natural resources or government regulations that require the employment of
local staff or contractors or require other benefits to be provided to local residents.
Any future material adverse changes in government policies or legislation in foreign jurisdictions in which
the Company has projects that affect foreign ownership, exploration, development or activities of
companies involved in exploration and production, may affect the viability and profitability of the
Company.
Tenure and land access risk
Land access is critical for exploration and/or exploitation to succeed. It requires both access to the mineral
rights and access to the surface rights. Minerals rights may be negotiated and acquired. In all cases the
acquisition of prospective exploration and mining claims is a competitive business, in which proprietary
knowledge or information is critical and the ability to negotiate satisfactory commercial arrangements with
other parties is often essential. The Company may not be successful in acquiring or obtaining the necessary
mining claims and access to surface rights required to conduct exploration or evaluation activities outside
of the mineral Claims.
As the Company’s rights in the Claims may be obtained by grant by regulatory authorities or be subject to
contracts with third parties, any third party may terminate or rescind the relevant agreement whether
lawfully or not and, accordingly, the Company may lose its rights to exclusive use of, and access to any, or
all, of the Claims. Third parties may also default on their obligations under the contracts which may lead to
termination of the contracts. Additionally, the Company may not be able to access the Claims due to
natural disasters or adverse weather conditions, political unrest, hostilities or failure to obtain the relevant
approvals and consents.
Once a Mining Claim has been registered, a licencee is permitted to enter onto provincial Crown and
private lands that are open for exploration covered by Mining Claim(s) and conduct preliminary
exploratory and assessment work on the subject lands.
The Company considers that the existing Permits granted on the Group’s Canadian Claims are sufficient to
facilitate the exploration programme contemplated, however, Permits must be renewed from time to time.
Currently, the Group has exploration licences required to explore